The page lists 13 deliverables related to the research project "SUPERTWIN".
title and desprition | type | last update |
---|---|---|
List of press releases, scientific papers and conference presentationsDetailed summary of all the dissemination activities within SUPERTWIN. Programme: H2020-EU.1.2.1. - Topic(s): FETOPEN-RIA-2014-2015 |
Documents, reports | 2020-03-11 |
Test and assessment report of SUPERTWIN demonstrator with resolution 42 nmThis deliverable will report on the integration and performance tests of the technology demonstrator of the super-twinning photon microscope. Programme: H2020-EU.1.2.1. - Topic(s): FETOPEN-RIA-2014-2015 |
Documents, reports | 2020-03-11 |
Final project reportFinal project report summarizing the relevant activities and results obtained within SUPERWTIN, management financial and administrative reporting. Programme: H2020-EU.1.2.1. - Topic(s): FETOPEN-RIA-2014-2015 |
Documents, reports | 2020-03-11 |
GaAs-based solid state sources of entangled IR photons with 5 photon production rate 1 kHzThis deliverable will report on fabrication, characterization and performance assessment of GaAs-based solid state sources of entangled IR photons. The draft will be issued at the end of the 1st fabrication run and final version will be updated at the end of the 2d run. Programme: H2020-EU.1.2.1. - Topic(s): FETOPEN-RIA-2014-2015 |
Demonstrators, pilots, prototypes | 2020-03-11 |
SUPERTWIN technology roadmapReport on SUPERWTIN technology roadmap Programme: H2020-EU.1.2.1. - Topic(s): FETOPEN-RIA-2014-2015 |
Documents, reports | 2020-03-11 |
GaN-based solid state sources of entangled VIS photons with 5 photon production rate 1 kHzThis deliverable will report on fabrication, characterization and performance assessment of GaN-based solid state sources of entangled VIS photons. The draft will be issued at the end of the 1st fabrication run and final version will be updated at the end of the 2d run. Programme: H2020-EU.1.2.1. - Topic(s): FETOPEN-RIA-2014-2015 |
Demonstrators, pilots, prototypes | 2019-07-26 |
Preliminary report on project exploitation and impactReport on exploitation of SUPERWTIN project and expected impact of the developed technology. Programme: H2020-EU.1.2.1. - Topic(s): FETOPEN-RIA-2014-2015 |
Documents, reports | 2019-07-26 |
First year project reportReport of the activities carried out within the first year of the project. Programme: H2020-EU.1.2.1. - Topic(s): FETOPEN-RIA-2014-2015 |
Documents, reports | 2019-07-26 |
Project websiteSUPERTWIN Project Webpage Programme: H2020-EU.1.2.1. - Topic(s): FETOPEN-RIA-2014-2015 |
Websites, patent fillings, videos etc. | 2019-07-26 |
Model experiment for image extraction from g(2) correlationsD1.2 describes the result of a model experiment that will be performed (task WP1.2) with an available and calibrated multimode spontaneous parametric-down conversion (SPDC) bi-photons source. Programme: H2020-EU.1.2.1. - Topic(s): FETOPEN-RIA-2014-2015 |
Documents, reports | 2019-07-26 |
Test sample selection and characterization reportThis deliverable reports on selection of representative objects for assessment of SUPERTWIN components and imaging system as well as on the procedures of such assessment. Programme: H2020-EU.1.2.1. - Topic(s): FETOPEN-RIA-2014-2015 |
Documents, reports | 2019-07-26 |
Periodic report on project communication, open data management & disseminationSemestral report starting from m12 summarizing the main project communication, open data management and dissemination activities. This is intended as an incremental document that will be updated every 6 months. Programme: H2020-EU.1.2.1. - Topic(s): FETOPEN-RIA-2014-2015 |
Documents, reports | 2019-07-26 |
Model experiment and algorithm for image extraction from g(3), g(4) and g(5) correlationsThis deliverable will report on extension of QT experiment to multiphoton states and high-order correlation functions. Experiments will be attempted with up to N=4, while modeling will be extended to N=5 photon states Programme: H2020-EU.1.2.1. - Topic(s): FETOPEN-RIA-2014-2015 |
Documents, reports | 2019-07-26 |