The page lists 22 deliverables related to the research project "VISUALMEDIA".
title and desprition | type | last update |
---|---|---|
Prototype pan-tilt-zoom camera trackerThis first prototype will allow both to test the fusion with the plane-based region tracker developed in task 4.2 and also to start the integration with the real time graphics engine which will remain valid for the rest of tracker versions. Programme: H2020-EU.2.1.1. - Topic(s): ICT-19-2015 |
Demonstrators, pilots, prototypes | 2019-05-30 |
Fine-Tuning and Refinement PlanThis deliverable will describe how the validation feedback obtained in two stages in WP4, will be technically analysed, evaluated and introduced in the final pre-commercial release of VisualMedia. Programme: H2020-EU.2.1.1. - Topic(s): ICT-19-2015 |
Documents, reports | 2019-05-30 |
Promotional ActivitiesThis deliverable will include the following contents: Programme: H2020-EU.2.1.1. - Topic(s): ICT-19-2015 |
Other | 2019-05-30 |
Project WebsiteOfficial Website of Visualmedia Project Programme: H2020-EU.2.1.1. - Topic(s): ICT-19-2015 |
Websites, patent fillings, videos etc. | 2019-05-30 |
VisualMedia Integrated SystemThe VisualMedia Integrated System (including social media, real time 3D graphics engine and Online Distribution Engine). The final versions of the social media and the real time graphics engine will be delivered after their integration between them and with the Online Distribution Engine (including the operator interface and the front end for smart devices), ready for tests. Programme: H2020-EU.2.1.1. - Topic(s): ICT-19-2015 |
Demonstrators, pilots, prototypes | 2019-05-30 |
Advanced prototype for the camera tracker with sensor fusion capabilitiesThis prototype will allow the final integration both with the plane-based tracker, with the graphics engine and also with the interaction tools on inserted graphics. Programme: H2020-EU.2.1.1. - Topic(s): ICT-19-2015 |
Demonstrators, pilots, prototypes | 2019-05-30 |
Data Management PlanThe use of a Data Management Plan (DMP) is required for projects participating in the Open Research Data Pilot in Horizon 2020, in the form of a deliverable in the first 6 months of the project. The deliverable, comprising the type of data generated/collected on the project, the standards to be used, the exploitation of the data for verification and re-use and the preservation of the data, will be generated during the first six months of the project. Programme: H2020-EU.2.1.1. - Topic(s): ICT-19-2015 |
Documents, reports | 2019-05-30 |
User Consultation Protocol and ToolsThis deliverable will document the work carried out in identifying stakeholder groups and detail the consultation methods and tools to be used during this first stage of the project Programme: H2020-EU.2.1.1. - Topic(s): ICT-19-2015 |
Documents, reports | 2019-05-30 |
VisualMedia Commercial ReleaseThe final commercial system, including: Programme: H2020-EU.2.1.1. - Topic(s): ICT-19-2015 |
Demonstrators, pilots, prototypes | 2019-05-30 |
Validation Phase Test ResultsPeriodic validation and test reports will be generated in order to continuously refine the VisualMedia integrated system in work package 6. This deliverable will document the results of the validation phase in two stages. The methodology will be designed in taking into account the need of generating feedback in different stages to optimise the refining process. It will be due end of months 19 and 22. Programme: H2020-EU.2.1.1. - Topic(s): ICT-19-2015 |
Documents, reports | 2019-05-30 |
VisualMedia User DocumentationThis deliverable will include all documentation necessary for the user: user manual, installation manual, maintenance manual and Frequently Asked Questions. Programme: H2020-EU.2.1.1. - Topic(s): ICT-19-2015 |
Documents, reports | 2019-05-30 |
Dissemination Implementation PlanThis deliverable will guide the implementation of the dissemination strategy described in section 2.2a. The plan will be subject to revision and will detail all dissemination methods and quantified key performance indicators for each method Programme: H2020-EU.2.1.1. - Topic(s): ICT-19-2015 |
Documents, reports | 2019-05-30 |
Social Media EngineA beta release of the social media engine will be delivered that will include part of the new AI algorithms and the final protocols for the communication both with the real time graphics engine and with the Online Distribution Engine. Programme: H2020-EU.2.1.1. - Topic(s): ICT-19-2015 |
Demonstrators, pilots, prototypes | 2019-05-30 |
VisualMedia Validation PlanThis deliverable will the methodology to be used to measure the user acceptance and the functional completeness and correctness of VisualMedia in the project framework. This will include how the technology will be used, in which program types, the questionnaires and templates for data collecting, number of technicians involved in each centre, its profile, etc. Programme: H2020-EU.2.1.1. - Topic(s): ICT-19-2015 |
Documents, reports | 2019-05-30 |
D1.1 Project Implementation Manual and Quality Control PlanDescription of all performance norms, management policies and procedures, roles and responsibilities, risk and contingency plans, conflict resolution mechanisms. Programme: H2020-EU.2.1.1. - Topic(s): ICT-19-2015 |
Documents, reports | 2019-05-30 |
VisualMedia SpecificationsThis report will detail the Visual Media system specifications based on the user requirements and which will feed into the adaptation process in work package 3 and 4 Programme: H2020-EU.2.1.1. - Topic(s): ICT-19-2015 |
Documents, reports | 2019-05-30 |
3D Graphics EngineA beta release of the 3D graphics engine will be delivered that will include part of the data templates and graphics considered in task 3.1. It will also implement part of the defined protocols to communicate with the social media engine. Programme: H2020-EU.2.1.1. - Topic(s): ICT-19-2015 |
Demonstrators, pilots, prototypes | 2019-05-30 |
Workflow RequirementsThis deliverable will identify the existing workflows in broadcast environments, the best strategy for the integration of VisualMedia modules or subsystems into these workflows, and their required adaptations and optimizations to make this integration possible. It will also determine the way that these subsystems will interoperate between them, the shared information between them, the data formats, and the optimized way that the users will operate the applications. This information will lead to the final requirements for the VisualMedia modules, the social media engine, the real time graphics engine, and the Online Distribution Engine. Programme: H2020-EU.2.1.1. - Topic(s): ICT-19-2015 |
Documents, reports | 2019-05-30 |
User Requirements DefinitionThe result of task T2.2, following a program of consultations with the broadcast industry partners, RTVE, SET, TVR, BSTV, BR, and HAL , will detail a range of user requirements which will feed into the VisualMedia platform specification. Programme: H2020-EU.2.1.1. - Topic(s): ICT-19-2015 |
Documents, reports | 2019-05-30 |
Commercial Impact Advisory Group Composition and Management PlanThis deliverable will document the consortium’s approach to managing and extending the CIAG. It will include a list of initial members, the MoU which members will sign and the activities to be carried out by the CIAG during the course of the project. Programme: H2020-EU.2.1.1. - Topic(s): ICT-19-2015 |
Documents, reports | 2019-05-30 |
Prototype scene augmentation and interaction handling moduleThis prototype will include both the interaction tools and the plane-based region tracker and will integrate them with the camera tracker and with the graphics engine. Programme: H2020-EU.2.1.1. - Topic(s): ICT-19-2015 |
Demonstrators, pilots, prototypes | 2019-05-30 |
Bi-annual NewsletterThe newsletter will provide information on project progress and will be circulated to stakeholders through the on line community and at various other events where appropriate. The newsletter will be due at end of months 6/12/18/24. Programme: H2020-EU.2.1.1. - Topic(s): ICT-19-2015 |
Documents, reports | 2019-05-30 |