The page lists 32 deliverables related to the research project "MPAT".
title and desprition | type | last update |
---|---|---|
Test evaluationDocument containing users’ feedback and measurements acquired from the two pilot phases and the resulting answers to the research questions specified in D6.1 Programme: H2020-EU.2.1.1. - Topic(s): ICT-19-2015 |
Documents, reports | 2019-05-30 |
Test plan v2Revision of D3.1, which takes into account findings from the pilot evaluations. Programme: H2020-EU.2.1.1. - Topic(s): ICT-19-2015 |
Documents, reports | 2019-05-30 |
System requirements and existing solutions v2This deliverable is an update of D4.1. It takes into account findings from the first pilot evaluation. Programme: H2020-EU.2.1.1. - Topic(s): ICT-19-2015 |
Documents, reports | 2019-05-30 |
Final CMS core backendBased on the feedback from the trials in WP6, two updates will be produced in M16-17 and M 20-21, covering improvements where needed. The resulting code will be delivered as the final deliverable in M21. Programme: H2020-EU.2.1.1. - Topic(s): ICT-19-2015 |
Demonstrators, pilots, prototypes | 2019-05-30 |
Final Plan for the Communication of ResultsFinal plan for the communication of the project results. Programme: H2020-EU.2.1.1. - Topic(s): ICT-19-2015 |
Documents, reports | 2019-05-30 |
Final Project Summary ReportFinal Project Summary Report Programme: H2020-EU.2.1.1. - Topic(s): ICT-19-2015 |
Documents, reports | 2019-05-30 |
System architecture and API v2This deliverable is an update of D4.2. It takes into account findings from the first pilot evaluation. Programme: H2020-EU.2.1.1. - Topic(s): ICT-19-2015 |
Documents, reports | 2019-05-30 |
Final Plan for the Dissemination and Exploitation of ResultsFinal plan for the dissemination and exploitation of the project results and the associated business model Programme: H2020-EU.2.1.1. - Topic(s): ICT-19-2015 |
Documents, reports | 2019-05-30 |
Final UI designRevision of D3.3, which takes into account from D3.5. Programme: H2020-EU.2.1.1. - Topic(s): ICT-19-2015 |
Documents, reports | 2019-05-30 |
Final CMS core frontendBased on the feedback from the trials in WP6, two updates will be produced in M16-17 and M 20-21, covering improvements where needed. The resulting code will be delivered as the final deliverable in M21. Programme: H2020-EU.2.1.1. - Topic(s): ICT-19-2015 |
Demonstrators, pilots, prototypes | 2019-05-30 |
Contributor guidelinesThis deliverable describes guidelines for 3rd-party developers who want to develop Plug-ins or Themes or who want to contribute to MPAT core. Programme: H2020-EU.2.1.1. - Topic(s): ICT-19-2015 |
Documents, reports | 2019-05-30 |
Product licenseThe open source license that will be adopted for the product which will be released at the end of the project. Programme: H2020-EU.2.1.1. - Topic(s): ICT-19-2015 |
Documents, reports | 2019-05-30 |
Updated MPAT ScenariosThis deliverable will describe the updated scenarios, based on D2.1, but updated with the result of the second phase of Task 2.1 and 2.2 Programme: H2020-EU.2.1.1. - Topic(s): ICT-19-2015 |
Documents, reports | 2019-05-30 |
Final Modules/Plug-insBased on the feedback from the trials in WP6, two updates will be produced in M16-17 and M 20-21, covering improvements where needed. The resulting code will be delivered as the final deliverable in M21. Programme: H2020-EU.2.1.1. - Topic(s): ICT-19-2015 |
Demonstrators, pilots, prototypes | 2019-05-30 |
Usability findings v2Revision of D3.2, which takes into account findings from the pilot evaluations. Programme: H2020-EU.2.1.1. - Topic(s): ICT-19-2015 |
Documents, reports | 2019-05-30 |
Pilot execution reportThis deliverable will describe the preparation and execution of the pilot trials. Programme: H2020-EU.2.1.1. - Topic(s): ICT-19-2015 |
Documents, reports | 2019-05-30 |
Trial-ready CMS core backendFirst, working CMS core backend, suitable for use in the large scale trial. Programme: H2020-EU.2.1.1. - Topic(s): ICT-19-2015 |
Demonstrators, pilots, prototypes | 2019-05-30 |
System requirementsThis deliverable documents findings of the requirements and state-of-the-art analysis conducted in T4.1. Programme: H2020-EU.2.1.1. - Topic(s): ICT-19-2015 |
Documents, reports | 2019-05-30 |
Initial Plan for the Dissemination and Exploitation of ResultsInitial release of the plan for the dissemination and exploitation of the project results and the associated business model. Programme: H2020-EU.2.1.1. - Topic(s): ICT-19-2015 |
Documents, reports | 2019-05-30 |
Test planThe test plan covers information about test procedure, methods that will be used, and participant descriptions (e.g. age distribution, occupation, sex). Document will also have test tasks the participants are performing on the test sessions, and material for the moderator so that she can conduct each session the same way. Additional material can cover for example templates the test observers can use to mark down their findings during the test sessions. Programme: H2020-EU.2.1.1. - Topic(s): ICT-19-2015 |
Documents, reports | 2019-05-30 |
Developer tools and development guidelinesThis deliverable describes guidelies for developers within the MPAT project. Guidelines include: code style rules, guidelines for commenting code and use of developer tools for versioning, build and testing. Programme: H2020-EU.2.1.1. - Topic(s): ICT-19-2015 |
Documents, reports | 2019-05-30 |
Initial Plan for the Communication of ResultsInitial release of the plan for the communication of the project results. Programme: H2020-EU.2.1.1. - Topic(s): ICT-19-2015 |
Documents, reports | 2019-05-30 |
Test setup specification backendThis deliverable will describe the technical specification for the pilot trial phase (channels used for trial, AIT description, bandwidth capacity used, broadcasters’ backend configuration, management/storage in CMS of information gathered by the app). Programme: H2020-EU.2.1.1. - Topic(s): ICT-19-2015 |
Documents, reports | 2019-05-30 |
Project websiteThe setup of a project website to be used for internal and external communication Programme: H2020-EU.2.1.1. - Topic(s): ICT-19-2015 |
Websites, patent fillings, videos etc. | 2019-05-30 |
1st Project Periodic, innovation and standardisation report1st Project Periodic, innovation and standardisation report Programme: H2020-EU.2.1.1. - Topic(s): ICT-19-2015 |
Documents, reports | 2019-05-30 |
Research questions and measurement methodologyThis deliverable will describe the questions for the trials and the appropriate methodology for evaluating them, as determined in task 6.1. It will reflect an intermediate status of the pilot preparation work of task 6.1. It will focus on the research questions, the means and methodology to gather qualitative and quantitative feedback with regards to the first pilot phase. Programme: H2020-EU.2.1.1. - Topic(s): ICT-19-2015 |
Documents, reports | 2019-05-30 |
Usability findingsThis document is an important deliverable for the UI design team. The information gathered to the report includes prioritized usability findings with both poor usability and good usability. Findings of poor usability are grouped e.g. to major and minor findings or even more so to three - five different categories, based on the severity. Report can include user comments and suggestions for corrections in places seen necessary and obvious. Programme: H2020-EU.2.1.1. - Topic(s): ICT-19-2015 |
Documents, reports | 2019-05-30 |
Trial-ready Modules/Plug-insFirst, working Modules/Plug-ins, suitable for use in the large scale trial. Programme: H2020-EU.2.1.1. - Topic(s): ICT-19-2015 |
Demonstrators, pilots, prototypes | 2019-05-30 |
UI designThis deliverable affects to the content of usability tests and planning. UI Design is the target of tests and thus the material needs to be in a certain level before testing can start. First test round is done with wireframes with little or no interaction. Later the design will evolve to include more detailed descriptions and interactions. Usability findings help to iterate the UI design and meet the user needs better. UI design document includes UI graphics and style guides which are used in the implementation phase. Programme: H2020-EU.2.1.1. - Topic(s): ICT-19-2015 |
Documents, reports | 2019-05-30 |
System architecture and API documentationThis deliverable documents findings from T4.2. It will provide the following information: system architecture describing interfaces of individual components of the MPAT Core, the information flow between the components of MPAT Core and documentations of the API for Plug-in and Theme developers. Programme: H2020-EU.2.1.1. - Topic(s): ICT-19-2015 |
Documents, reports | 2019-05-30 |
Initial MPAT ScenariosThis deliverable will describe the content creator and consumer perspective scenarios derived in the first phase of Task 2.1 and 2.2 Programme: H2020-EU.2.1.1. - Topic(s): ICT-19-2015 |
Documents, reports | 2019-05-30 |
Trial-ready CMS core frontendFirst, working CMS core frontend, suitable for use in the large scale trial. Programme: H2020-EU.2.1.1. - Topic(s): ICT-19-2015 |
Demonstrators, pilots, prototypes | 2019-05-30 |