The page lists 6 deliverables related to the research project "Re-Deploy".
title and desprition | type | last update |
---|---|---|
Dissemincation & Communication ReportDissemination & Communication (D&C) Report, including – for each of the activities included in the D&C Plan - an explicit assessment of the KPIs vs. the planned targets, a description of the lessons learnt during the project and the potential follow-up activities to be implemented after project end (Month 24) Programme: H2020-EU.3.3.;H2020-EU.2.3.1. - Topic(s): SIE-01-2015 |
Documents, reports | 2019-09-02 |
Pilot 1 startedPilot 1 started, including manual for operation and fully completed commissioning (Month 27) Programme: H2020-EU.3.3.;H2020-EU.2.3.1. - Topic(s): SIE-01-2015 |
Demonstrators, pilots, prototypes | 2019-09-02 |
Pilot 1 shippedPilot 1 shipped, including n.28 parabolic solar collectors for a total collecting surface of 2’285 m2 and a fully containerized BOP made of pumps, oil-to-steam heat exchanger, vessel, system control panel, re-usable foundations, re-usable solar field piping (Month 23) Programme: H2020-EU.3.3.;H2020-EU.2.3.1. - Topic(s): SIE-01-2015 |
Demonstrators, pilots, prototypes | 2019-09-02 |
Pilot 2 startedPilot 2 started, including manual for operation and fully completed commissioning (Month 31) Programme: H2020-EU.3.3.;H2020-EU.2.3.1. - Topic(s): SIE-01-2015 |
Demonstrators, pilots, prototypes | 2019-09-02 |
Pilot 2 shippedPilot 2 shipped, including n.12 linear Fresnel collectors for a total collecting surface of 2’670 m2 and a fully containerized BOP made of pumps, oil-to-steam heat exchanger, vessel, system control panel, re-usable foundations, re-usable solar field piping (Month 27) Programme: H2020-EU.3.3.;H2020-EU.2.3.1. - Topic(s): SIE-01-2015 |
Demonstrators, pilots, prototypes | 2019-09-02 |
Dissemination & Communication PlanDissemination & Communication (D&C) Plan, including the definition of the specific D&C activities dedicated to each of the target groups (industrial users and EPC partners, financial partners, research institutes, institutional decision makers and the wider audience); Key Performance Indicators (KPIs) targets will be defined for each activity (Month 3) Programme: H2020-EU.3.3.;H2020-EU.2.3.1. - Topic(s): SIE-01-2015 |