The page lists 14 deliverables related to the research project "Hydrolowhead".
title and desprition | type | last update |
---|---|---|
PrototypeReal-scale prototype with all components installed and already commissioned Manufacturing of the optimized turbine Programme: H2020-EU.3.3.;H2020-EU.2.3.1. - Topic(s): SIE-01-2015 |
Demonstrators, pilots, prototypes | 2019-05-30 |
Final Business PlanDescription of the business\'s future, including IPR and evolution of the market. Programme: H2020-EU.3.3.;H2020-EU.2.3.1. - Topic(s): SIE-01-2015 |
Documents, reports | 2019-05-30 |
Project Websitepublic area and intranet Programme: H2020-EU.3.3.;H2020-EU.2.3.1. - Topic(s): SIE-01-2015 |
Websites, patent fillings, videos etc. | 2019-05-30 |
Technology and market watch interim reportFinal technology and market watch report Programme: H2020-EU.3.3.;H2020-EU.2.3.1. - Topic(s): SIE-01-2015 |
Documents, reports | 2019-05-30 |
Web interfaceWeb monitoring and mobile application allowing monitoring view Programme: H2020-EU.3.3.;H2020-EU.2.3.1. - Topic(s): SIE-01-2015 |
Websites, patent fillings, videos etc. | 2019-05-30 |
IPR protection interim reportIPR guidelines. IPR share beyond CA Final IPR report. Programme: H2020-EU.3.3.;H2020-EU.2.3.1. - Topic(s): SIE-01-2015 |
Documents, reports | 2019-05-30 |
Dissemination materialPromotional material; Logo, Power point official presentation, Brochure, Poster, Press releases. Publications etc Programme: H2020-EU.3.3.;H2020-EU.2.3.1. - Topic(s): SIE-01-2015 |
Websites, patent fillings, videos etc. | 2019-05-30 |
Assembled power systemPower equipment defined. Programme: H2020-EU.3.3.;H2020-EU.2.3.1. - Topic(s): SIE-01-2015 |
Other | 2019-05-30 |
Plan for Exploitation and dissemination of results PEDRDetail the strategy and concrete actions for the protection, exploitation and dissemination of the project results Programme: H2020-EU.3.3.;H2020-EU.2.3.1. - Topic(s): SIE-01-2015 |
Documents, reports | 2019-05-30 |
Platform backend. back end applicationProgram interface. Communication with OPC middleware PLC status. The deliverable will include the description of the modules developed for the backend and the specification for the APIs each module provides Programme: H2020-EU.3.3.;H2020-EU.2.3.1. - Topic(s): SIE-01-2015 |
Other | 2019-05-30 |
Software licences. Control systemCompilation of software licenses needed for the development, correct commissioning and normal running of the power stage system. List of specifications, signals, structures and program blocks. Final design and programme Programme: H2020-EU.3.3.;H2020-EU.2.3.1. - Topic(s): SIE-01-2015 |
Other | 2019-05-30 |
Power electronic systemPrototype of the power electronic system. Electronic system assembly. Quality check Programme: H2020-EU.3.3.;H2020-EU.2.3.1. - Topic(s): SIE-01-2015 |
Other | 2019-05-30 |
Implemented demonstration plant commissionedSystem implemented in one of the Girona city council facilities SARGAS facilities (Both in Spain) Programme: H2020-EU.3.3.;H2020-EU.2.3.1. - Topic(s): SIE-01-2015 |
Other | 2019-05-31 |
Fully operational prototype of the demonstration plantFully operational demonstration plant with all components installed and already commissioned. Programme: H2020-EU.3.3.;H2020-EU.2.3.1. - Topic(s): SIE-01-2015 |
Other | 2019-05-31 |