The page lists 44 deliverables related to the research project "TeSeR".
title and desprition | type | last update |
---|---|---|
Final report about the design and prototype of the removal moduleSummary of the technological concepts, trades and findings of the removal module prototype and proposal of next steps after the TeSeR project Programme: H2020-EU.2.1.6. - Topic(s): PROTEC-1-2015 |
Documents, reports | 2020-03-06 |
Semi-controlled Removal Concept Functional Test Plan and ResultsFunctional Test Plan and Results about the breadboard to demonstrate its functionality Programme: H2020-EU.2.1.6. - Topic(s): PROTEC-1-2015 |
Documents, reports | 2020-03-06 |
Controlled Removal Concept Functional Test Plan and ResultsFunctional Test Plan and Results about the breadboard to demonstrate its functionality Programme: H2020-EU.2.1.6. - Topic(s): PROTEC-1-2015 |
Documents, reports | 2020-03-06 |
Final report about the design and prototype of the controlled removal subsystemSummary of the technological concepts, trades and findings of the removal subsystem and proposal of next steps after the TeSeR project Programme: H2020-EU.2.1.6. - Topic(s): PROTEC-1-2015 |
Documents, reports | 2020-03-06 |
Final report about the design and prototype of the semi-controlled removal subsystemSummary of the technological concepts, trades and findings of the removal subsystem and proposal of next steps after the TeSeR project Programme: H2020-EU.2.1.6. - Topic(s): PROTEC-1-2015 |
Documents, reports | 2020-03-06 |
Document package describing tests and resultsTest plan and results to test and validate the function of the removal module and the attached removal subsystem Programme: H2020-EU.2.1.6. - Topic(s): PROTEC-1-2015 |
Documents, reports | 2020-03-06 |
Controlled Removal Concept Breadboard Requirement DocumentRequirements for the performance and concept of the breadboard of the removal subsystem derived from D3.1 Programme: H2020-EU.2.1.6. - Topic(s): PROTEC-1-2015 |
Documents, reports | 2020-03-06 |
Uncontrolled Removal Concept Breadboard Functional Test PlanTest plan to test and validate the function of the breadboard Programme: H2020-EU.2.1.6. - Topic(s): PROTEC-1-2015 |
Documents, reports | 2020-03-06 |
Final report about the concepts and functional architecture of the system removal moduleSummary of the technological concepts, trades and findings of the removal module and proposal of next steps after the TeSeR project Programme: H2020-EU.2.1.6. - Topic(s): PROTEC-1-2015 |
Documents, reports | 2020-03-06 |
Controlled Removal Concept Interface Control DocumentDesign of the interface removal module – removal subsystem based on “Interface Definition Document for removal module/removal subsystem interface†D2.7 to ensure common design Programme: H2020-EU.2.1.6. - Topic(s): PROTEC-1-2015 |
Documents, reports | 2020-03-06 |
Document package describing the AIT of the removal module prototypeReport describing manufacturing, integration of the removal module and attachment of at least one removal subsystem Programme: H2020-EU.2.1.6. - Topic(s): PROTEC-1-2015 |
Documents, reports | 2020-03-06 |
Uncontrolled Removal Concept Design Breadboard Functional Test ResultsBreadboard Functional Test Results about the breadboard to ensure its functionality Programme: H2020-EU.2.1.6. - Topic(s): PROTEC-1-2015 |
Documents, reports | 2020-03-06 |
Public outreach reportReport to be presented at final presentation summarising outreach activities and Public Relation events during the course of the project Programme: H2020-EU.2.1.6. - Topic(s): PROTEC-1-2015 |
Documents, reports | 2020-03-06 |
Final report about the design and prototype of the uncontrolled removal subsystemSummary of the technological concepts, trades and findings of the removal subsystem and proposal of next steps after the TeSeR project Programme: H2020-EU.2.1.6. - Topic(s): PROTEC-1-2015 |
Documents, reports | 2020-03-06 |
Semi-controlled Removal Concept Interface Control DocumentDesign of the interface removal module – removal subsystem based on “Interface Definition Document for removal module/removal subsystem interface†D2.7 to ensure common design Programme: H2020-EU.2.1.6. - Topic(s): PROTEC-1-2015 |
Documents, reports | 2020-03-06 |
Design rulesSet of general design rules for implementing post-mission deorbiting capability in S/C and potential benefits of the new design rules compared to existing rules Programme: H2020-EU.2.1.6. - Topic(s): PROTEC-1-2015 |
Documents, reports | 2020-02-27 |
RoadmapNext steps (e.g. technology developments) after the TeSeR project to prepare market readiness Programme: H2020-EU.2.1.6. - Topic(s): PROTEC-1-2015 |
Documents, reports | 2020-02-27 |
RAMS reportReport about reliability, availability, maintainability, safety of the removal module and propose improvements for next steps Programme: H2020-EU.2.1.6. - Topic(s): PROTEC-1-2015 |
Documents, reports | 2020-02-27 |
Semi-Controlled Removal Concept Breadboard Requirement DocumentRequirements for the performance and concept of the breadboard of the removal subsystem derived from D4.1 Programme: H2020-EU.2.1.6. - Topic(s): PROTEC-1-2015 |
Documents, reports | 2020-02-27 |
Risk assessmentAssess the value of the removal module and its removal subsystems from a risk perspective Programme: H2020-EU.2.1.6. - Topic(s): PROTEC-1-2015 |
Documents, reports | 2020-02-27 |
Interface Definition Document for S/C - removal module interfaceRequirements and concepts for the standardized interface to attach the removal module to different S/C Programme: H2020-EU.2.1.6. - Topic(s): PROTEC-1-2015 |
Documents, reports | 2020-02-27 |
Definition of functional architecture of the removal module and its main subsystemsDefinition of functional architecture of the removal module and its main subsystems Programme: H2020-EU.2.1.6. - Topic(s): PROTEC-1-2015 |
Documents, reports | 2020-02-27 |
Definition of functional and performance requirementsDefinition of functional and performance requirements of the removal module and its major subsystems (e.g. power, communication) including removal subsystems Programme: H2020-EU.2.1.6. - Topic(s): PROTEC-1-2015 |
Documents, reports | 2020-02-27 |
System reportTrades and synthesis and summary of the results of WP 1 – 6 Programme: H2020-EU.2.1.6. - Topic(s): PROTEC-1-2015 |
Documents, reports | 2020-02-27 |
Operational and Autonomy concept for removal triggering and passivation systemsTrade between different concepts and proposal of operational concept for removal triggering and passivation Programme: H2020-EU.2.1.6. - Topic(s): PROTEC-1-2015 |
Documents, reports | 2020-02-27 |
Mission & system requirementsRequired performance of the removal module and the removal subsystems and major subsystems to ensure PMD according to D1.1 (e.g. thrust level or size of deployable structures to remove a S/C in a specific time) Programme: H2020-EU.2.1.6. - Topic(s): PROTEC-1-2015 |
Documents, reports | 2020-02-25 |
Semi-Controlled Removal Concept Requirement DocumentRequirements for the performance and concept of the removal subsystem based on the “Mission and system requirements†from D1.5 Programme: H2020-EU.2.1.6. - Topic(s): PROTEC-1-2015 |
Documents, reports | 2020-02-25 |
S/C status detection conceptTrade between different concepts and proposal of operational concept for the status detection Programme: H2020-EU.2.1.6. - Topic(s): PROTEC-1-2015 |
Documents, reports | 2020-02-25 |
High level user and mission requirementsTechnical and non-technical high level user requirements and mission requirements related to space debris mitigation based on international guidelines and requirements (e.g. ISO 24113) Programme: H2020-EU.2.1.6. - Topic(s): PROTEC-1-2015 |
Documents, reports | 2020-02-25 |
Document on experience on detection, trigger and passivationReport about experience with concepts of S/C status detection, removal trigger and passivation systems including lessons learned Programme: H2020-EU.2.1.6. - Topic(s): PROTEC-1-2015 |
Documents, reports | 2020-02-25 |
Insurance aspectsReport from an insurance point of view measuring the potential of selected solutions to improve the risk profile or generate a degraded risk profile from new / unknown failure modes and to judge and rate the technical risk profile of a space system. Programme: H2020-EU.2.1.6. - Topic(s): PROTEC-1-2015 |
Documents, reports | 2020-02-25 |
Public websiteLaunch public website online (M6), with continual updates until M36 Programme: H2020-EU.2.1.6. - Topic(s): PROTEC-1-2015 |
Websites, patent fillings, videos etc. | 2020-02-25 |
Report on Uncontrolled Removal Concept DesignReport about the analysis, trades and architecture of the proposed removal concept Programme: H2020-EU.2.1.6. - Topic(s): PROTEC-1-2015 |
Documents, reports | 2020-02-25 |
Market studyStudy including risk assessment due to space debris and cost frame for the removal module for a business case Programme: H2020-EU.2.1.6. - Topic(s): PROTEC-1-2015 |
Documents, reports | 2020-02-25 |
Passive AOCS conceptsReport about feasibility analysis and comparison of different concepts for passive AOCS Programme: H2020-EU.2.1.6. - Topic(s): PROTEC-1-2015 |
Documents, reports | 2020-02-25 |
Re-entry analysis reportFeasibility analysis about the thermal and mechanical loads of the semi-controlled removal concepts including proposal of shapes and materials to ensure that the deployable structure ensures removal in a fraction of one orbit. Programme: H2020-EU.2.1.6. - Topic(s): PROTEC-1-2015 |
Documents, reports | 2020-02-25 |
Mission analysis reportQuantitative and qualitative comparison of different removal concepts including the removal subsystem proposed in WP 3 – 5 Programme: H2020-EU.2.1.6. - Topic(s): PROTEC-1-2015 |
Documents, reports | 2020-02-25 |
Semi-Controlled Removal Concept Technological Gaps DescriptionIdentification of potential gaps w.r.t. a successful breadboarding in time and proposal of solutions Programme: H2020-EU.2.1.6. - Topic(s): PROTEC-1-2015 |
Documents, reports | 2020-02-25 |
Multi-purpose aspects on TeSeRReport about feasibility analysis of using technology of the removal module and its removal subsystems for additional tasks, e.g. shielding, detection of debris impacts for statistics, etc. Programme: H2020-EU.2.1.6. - Topic(s): PROTEC-1-2015 |
Documents, reports | 2020-02-25 |
Interface Definition Document for removal module/removal subsystem interfaceRequirements and concepts for the standardized interface to attach different removal subsystems Programme: H2020-EU.2.1.6. - Topic(s): PROTEC-1-2015 |
Documents, reports | 2020-02-25 |
Controlled Removal Concept Technological Gaps DescriptionIdentification of potential gaps w.r.t. a successful breadboarding in time and proposal of solutions Programme: H2020-EU.2.1.6. - Topic(s): PROTEC-1-2015 |
Documents, reports | 2020-02-25 |
Controlled Removal Concept Requirement DocumentRequirements for the performance and concept of the removal subsystem based on the “Mission and system requirements†from D1.5 Programme: H2020-EU.2.1.6. - Topic(s): PROTEC-1-2015 |
Documents, reports | 2020-02-25 |
System and subsystem requirements documentDocument of the removal module and its major subsystems (e.g. power, communication) including removal subsystems Programme: H2020-EU.2.1.6. - Topic(s): PROTEC-1-2015 |
Documents, reports | 2020-02-25 |
Legal analysis reportReport about forging compliance mechanism with IADC mitigation guidelines at national level, licensing and third party liability insurance (third party damage), competing factors on licensing regimes [export-controls (ITAR)] Programme: H2020-EU.2.1.6. - Topic(s): PROTEC-1-2015 |
Documents, reports | 2020-02-25 |