The page lists 44 deliverables related to the research project "TeSeR".

 List of Deliverables

TeSeR: list of downloadable deliverables.
title and desprition type last update

Final report about the design and prototype of the removal module

Summary of the technological concepts, trades and findings of the removal module prototype and proposal of next steps after the TeSeR project

Programme: H2020-EU.2.1.6. - Topic(s): PROTEC-1-2015

download deliverable 

Documents, reports 2020-03-06

Semi-controlled Removal Concept Functional Test Plan and Results

Functional Test Plan and Results about the breadboard to demonstrate its functionality

Programme: H2020-EU.2.1.6. - Topic(s): PROTEC-1-2015

download deliverable 

Documents, reports 2020-03-06

Controlled Removal Concept Functional Test Plan and Results

Functional Test Plan and Results about the breadboard to demonstrate its functionality

Programme: H2020-EU.2.1.6. - Topic(s): PROTEC-1-2015

download deliverable 

Documents, reports 2020-03-06

Final report about the design and prototype of the controlled removal subsystem

Summary of the technological concepts, trades and findings of the removal subsystem and proposal of next steps after the TeSeR project

Programme: H2020-EU.2.1.6. - Topic(s): PROTEC-1-2015

download deliverable 

Documents, reports 2020-03-06

Final report about the design and prototype of the semi-controlled removal subsystem

Summary of the technological concepts, trades and findings of the removal subsystem and proposal of next steps after the TeSeR project

Programme: H2020-EU.2.1.6. - Topic(s): PROTEC-1-2015

download deliverable 

Documents, reports 2020-03-06

Document package describing tests and results

Test plan and results to test and validate the function of the removal module and the attached removal subsystem

Programme: H2020-EU.2.1.6. - Topic(s): PROTEC-1-2015

download deliverable 

Documents, reports 2020-03-06

Controlled Removal Concept Breadboard Requirement Document

Requirements for the performance and concept of the breadboard of the removal subsystem derived from D3.1

Programme: H2020-EU.2.1.6. - Topic(s): PROTEC-1-2015

download deliverable 

Documents, reports 2020-03-06

Uncontrolled Removal Concept Breadboard Functional Test Plan

Test plan to test and validate the function of the breadboard

Programme: H2020-EU.2.1.6. - Topic(s): PROTEC-1-2015

download deliverable 

Documents, reports 2020-03-06

Final report about the concepts and functional architecture of the system removal module

Summary of the technological concepts, trades and findings of the removal module and proposal of next steps after the TeSeR project

Programme: H2020-EU.2.1.6. - Topic(s): PROTEC-1-2015

download deliverable 

Documents, reports 2020-03-06

Controlled Removal Concept Interface Control Document

Design of the interface removal module – removal subsystem based on “Interface Definition Document for removal module/removal subsystem interface” D2.7 to ensure common design

Programme: H2020-EU.2.1.6. - Topic(s): PROTEC-1-2015

download deliverable 

Documents, reports 2020-03-06

Document package describing the AIT of the removal module prototype

Report describing manufacturing, integration of the removal module and attachment of at least one removal subsystem
Draft: M29

Programme: H2020-EU.2.1.6. - Topic(s): PROTEC-1-2015

download deliverable 

Documents, reports 2020-03-06

Uncontrolled Removal Concept Design Breadboard Functional Test Results

Breadboard Functional Test Results about the breadboard to ensure its functionality

Programme: H2020-EU.2.1.6. - Topic(s): PROTEC-1-2015

download deliverable 

Documents, reports 2020-03-06

Public outreach report

Report to be presented at final presentation summarising outreach activities and Public Relation events during the course of the project

Programme: H2020-EU.2.1.6. - Topic(s): PROTEC-1-2015

download deliverable 

Documents, reports 2020-03-06

Final report about the design and prototype of the uncontrolled removal subsystem

Summary of the technological concepts, trades and findings of the removal subsystem and proposal of next steps after the TeSeR project

Programme: H2020-EU.2.1.6. - Topic(s): PROTEC-1-2015

download deliverable 

Documents, reports 2020-03-06

Semi-controlled Removal Concept Interface Control Document

Design of the interface removal module – removal subsystem based on “Interface Definition Document for removal module/removal subsystem interface” D2.7 to ensure common design

Programme: H2020-EU.2.1.6. - Topic(s): PROTEC-1-2015

download deliverable 

Documents, reports 2020-03-06

Design rules

Set of general design rules for implementing post-mission deorbiting capability in S/C and potential benefits of the new design rules compared to existing rules

Programme: H2020-EU.2.1.6. - Topic(s): PROTEC-1-2015

download deliverable 

Documents, reports 2020-02-27

Roadmap

Next steps (e.g. technology developments) after the TeSeR project to prepare market readiness

Programme: H2020-EU.2.1.6. - Topic(s): PROTEC-1-2015

download deliverable 

Documents, reports 2020-02-27

RAMS report

Report about reliability, availability, maintainability, safety of the removal module and propose improvements for next steps

Programme: H2020-EU.2.1.6. - Topic(s): PROTEC-1-2015

download deliverable 

Documents, reports 2020-02-27

Semi-Controlled Removal Concept Breadboard Requirement Document

Requirements for the performance and concept of the breadboard of the removal subsystem derived from D4.1

Programme: H2020-EU.2.1.6. - Topic(s): PROTEC-1-2015

download deliverable 

Documents, reports 2020-02-27

Risk assessment

Assess the value of the removal module and its removal subsystems from a risk perspective

Programme: H2020-EU.2.1.6. - Topic(s): PROTEC-1-2015

download deliverable 

Documents, reports 2020-02-27

Interface Definition Document for S/C - removal module interface

Requirements and concepts for the standardized interface to attach the removal module to different S/C

Programme: H2020-EU.2.1.6. - Topic(s): PROTEC-1-2015

download deliverable 

Documents, reports 2020-02-27

Definition of functional architecture of the removal module and its main subsystems

Definition of functional architecture of the removal module and its main subsystems

Programme: H2020-EU.2.1.6. - Topic(s): PROTEC-1-2015

download deliverable 

Documents, reports 2020-02-27

Definition of functional and performance requirements

Definition of functional and performance requirements of the removal module and its major subsystems (e.g. power, communication) including removal subsystems
Draft: M17

Programme: H2020-EU.2.1.6. - Topic(s): PROTEC-1-2015

download deliverable 

Documents, reports 2020-02-27

System report

Trades and synthesis and summary of the results of WP 1 – 6
Drafts: M11, M17, M23, M29, Final: M35

Programme: H2020-EU.2.1.6. - Topic(s): PROTEC-1-2015

download deliverable 

Documents, reports 2020-02-27

Operational and Autonomy concept for removal triggering and passivation systems

Trade between different concepts and proposal of operational concept for removal triggering and passivation
Draft: M11

Programme: H2020-EU.2.1.6. - Topic(s): PROTEC-1-2015

download deliverable 

Documents, reports 2020-02-27

Mission & system requirements

Required performance of the removal module and the removal subsystems and major subsystems to ensure PMD according to D1.1 (e.g. thrust level or size of deployable structures to remove a S/C in a specific time)

Programme: H2020-EU.2.1.6. - Topic(s): PROTEC-1-2015

download deliverable 

Documents, reports 2020-02-25

Semi-Controlled Removal Concept Requirement Document

Requirements for the performance and concept of the removal subsystem based on the “Mission and system requirements” from D1.5

Programme: H2020-EU.2.1.6. - Topic(s): PROTEC-1-2015

download deliverable 

Documents, reports 2020-02-25

S/C status detection concept

Trade between different concepts and proposal of operational concept for the status detection

Programme: H2020-EU.2.1.6. - Topic(s): PROTEC-1-2015

download deliverable 

Documents, reports 2020-02-25

High level user and mission requirements

Technical and non-technical high level user requirements and mission requirements related to space debris mitigation based on international guidelines and requirements (e.g. ISO 24113)

Programme: H2020-EU.2.1.6. - Topic(s): PROTEC-1-2015

download deliverable 

Documents, reports 2020-02-25

Document on experience on detection, trigger and passivation

Report about experience with concepts of S/C status detection, removal trigger and passivation systems including lessons learned

Programme: H2020-EU.2.1.6. - Topic(s): PROTEC-1-2015

download deliverable 

Documents, reports 2020-02-25

Insurance aspects

Report from an insurance point of view measuring the potential of selected solutions to improve the risk profile or generate a degraded risk profile from new / unknown failure modes and to judge and rate the technical risk profile of a space system.

Programme: H2020-EU.2.1.6. - Topic(s): PROTEC-1-2015

download deliverable 

Documents, reports 2020-02-25

Public website

Launch public website online (M6), with continual updates until M36

Programme: H2020-EU.2.1.6. - Topic(s): PROTEC-1-2015

download deliverable 

Websites, patent fillings, videos etc. 2020-02-25

Report on Uncontrolled Removal Concept Design

Report about the analysis, trades and architecture of the proposed removal concept
Draft: M5

Programme: H2020-EU.2.1.6. - Topic(s): PROTEC-1-2015

download deliverable 

Documents, reports 2020-02-25

Market study

Study including risk assessment due to space debris and cost frame for the removal module for a business case

Programme: H2020-EU.2.1.6. - Topic(s): PROTEC-1-2015

download deliverable 

Documents, reports 2020-02-25

Passive AOCS concepts

Report about feasibility analysis and comparison of different concepts for passive AOCS

Programme: H2020-EU.2.1.6. - Topic(s): PROTEC-1-2015

download deliverable 

Documents, reports 2020-02-25

Re-entry analysis report

Feasibility analysis about the thermal and mechanical loads of the semi-controlled removal concepts including proposal of shapes and materials to ensure that the deployable structure ensures removal in a fraction of one orbit.

Programme: H2020-EU.2.1.6. - Topic(s): PROTEC-1-2015

download deliverable 

Documents, reports 2020-02-25

Mission analysis report

Quantitative and qualitative comparison of different removal concepts including the removal subsystem proposed in WP 3 – 5

Programme: H2020-EU.2.1.6. - Topic(s): PROTEC-1-2015

download deliverable 

Documents, reports 2020-02-25

Semi-Controlled Removal Concept Technological Gaps Description

Identification of potential gaps w.r.t. a successful breadboarding in time and proposal of solutions

Programme: H2020-EU.2.1.6. - Topic(s): PROTEC-1-2015

download deliverable 

Documents, reports 2020-02-25

Multi-purpose aspects on TeSeR

Report about feasibility analysis of using technology of the removal module and its removal subsystems for additional tasks, e.g. shielding, detection of debris impacts for statistics, etc.

Programme: H2020-EU.2.1.6. - Topic(s): PROTEC-1-2015

download deliverable 

Documents, reports 2020-02-25

Interface Definition Document for removal module/removal subsystem interface

Requirements and concepts for the standardized interface to attach different removal subsystems

Programme: H2020-EU.2.1.6. - Topic(s): PROTEC-1-2015

download deliverable 

Documents, reports 2020-02-25

Controlled Removal Concept Technological Gaps Description

Identification of potential gaps w.r.t. a successful breadboarding in time and proposal of solutions

Programme: H2020-EU.2.1.6. - Topic(s): PROTEC-1-2015

download deliverable 

Documents, reports 2020-02-25

Controlled Removal Concept Requirement Document

Requirements for the performance and concept of the removal subsystem based on the “Mission and system requirements” from D1.5

Programme: H2020-EU.2.1.6. - Topic(s): PROTEC-1-2015

download deliverable 

Documents, reports 2020-02-25

System and subsystem requirements document

Document of the removal module and its major subsystems (e.g. power, communication) including removal subsystems
Draft: M5

Programme: H2020-EU.2.1.6. - Topic(s): PROTEC-1-2015

download deliverable 

Documents, reports 2020-02-25

Legal analysis report

Report about forging compliance mechanism with IADC mitigation guidelines at national level, licensing and third party liability insurance (third party damage), competing factors on licensing regimes [export-controls (ITAR)]

Programme: H2020-EU.2.1.6. - Topic(s): PROTEC-1-2015

download deliverable 

Documents, reports 2020-02-25