Opendata, web and dolomites

VICINITY project deliverables

The page lists 53 deliverables related to the research project "VICINITY".

 List of Deliverables

VICINITY: list of downloadable deliverables.
title and desprition type last update

Final Report

Final project report.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-30-2015

download deliverable 

Documents, reports 2020-03-06

Report on Dissemination Activities, Public Participation and Awareness, year 4

Every year two conference papers will be intended to publish in relevant international conferences (specially focus on IEEE conferences). Some of the conferences will be submitted to be published in prestigious journal from IEEE (transactions and magazines). The preprints of the papers will be also uploaded in the website of the project with free access. The results of the projects will be presented in Keynotes, Seminars and PhD courses of the University.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-30-2015

download deliverable 

Documents, reports 2020-03-06

Report on Smart Energy MicroGrid Neighbourhood Installations

The report will be composed of a set of documents containing visuals and schematics on the VICINITY solution installations within the MicroGrid Neighborhood pilot and standardized microgrid community. These contents will be created and maintained by ENERC during systems installation. Knowledge management process would facilitate synchronization of the report format and areas to be analyzed with the other pilot installation responsible partners, in order to obtain cross-knowledge leverage and consistency in results reporting as well as in the methodology under which the analysis is performed. Thus, the report will include an assessment report and analysis of the obtained results vs. expected results of pilot installations.
Create and maintain during systems and the related business process installations a set of documents containing visuals and schematics on the VICINITY solution installations within Micro Neighborhood pilots.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-30-2015

download deliverable 

Documents, reports 2020-03-06

Pilot results of Smart Energy MicroGrid Neighbourhood use-case

This comparative benchmarking report will include ENERC’s Smart Energy MicroGrid Neighborhood (microgrid community) use-case evaluation based on the detailed framework defined in T8.1. The compliance evaluation will take into account user and business requirements defined in both WP1 and WP2. Included performance indicators and metrics will be specific to the use case and developed by ENERC. According to the Pilot Evaluation Framework, the report will document contributions from stakeholders, pilot managers, users/citizens during piloting activities, through interviews towards the evaluation of technical feasibility, effectiveness, usability, economic rationale, and environmental impact, so to rate the performance in each category.
The report will include evaluation-benchmarking criteria related to efficiency, appropriateness and usability of solutions.
The matrix report will include the results of stakeholder engagement; Vicinity concept applicability to microgrid driven community, interoperability results and document potential additional value added services that can result form the implementation.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-30-2015

download deliverable 

Documents, reports 2020-03-06

Report on Buildings for Assisted Living Neighbourhood Installations

The deliverable will contain a report on Buildings in Neighbourhood Installations. Pilot site installation will be implemented in close cooperation with Oslo Science Park. The report will describe technical part of the site installation and the practical use case that has been implemented in to the Pilot. Aspects that will be described in the Pilot report is about the experience of support for building monitoring and controll, EV charging and energy in a smart neigthbourhood. Architecture plan based on individual needs and privacy. Building instrumentation with extensive use of sensors, IEQ, energy consumption, exsisting instrumentationsystems. This will be carefully coordinated together with the tenant in neighbourhood community in Oslo Science Park.This will be fully compliant to legislation on privacy and handling of sensitive information.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-30-2015

download deliverable 

Documents, reports 2020-03-06

Pilot results of eHealth at Home use-case

Report on the overall assessment and evaluation of the achieved results during the realisation of the eHealth at Home Use Case at selected pilot areas in Greece, comprising of both User Experience and the improvements brought by the overall VICINITY framework in terms of integration, interoperability, compliance with requirements etc.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-30-2015

download deliverable 

Documents, reports 2020-03-06

Report on Intelligent Transport & Parking Installations

The deliverable will contain a report on Intelligent Transport & Parking Installation as implemented in cooperation with Norwegian Helsehus and the neighborhood district. The report will address experiences gained from applying Security and biometric protocols to handle security and access control policies, as well as describe how Assistive Living will be supported for health personnel and visitors.Lastly it will contain information on how DATEX-II communication have been tested for IoT technology using standardized traffic protocols for Traffic and travel information.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-30-2015

download deliverable 

Documents, reports 2020-03-06

Final Review Meeting

The consortium will organise the final review meeting for the projects of the call in M37.
The partners will share the costs as described in the Consortium Agreement.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-30-2015

download deliverable 

Other 2020-03-06

Report on Standard Involvement over life of project and conformance assessment

Deliverable 2.4 will collect practical and quantitative feedback obtained during VICINITY project to create recommendations, amendments and/or extensions to the related standardisation, selected in D2.1.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-30-2015

download deliverable 

Documents, reports 2020-03-06

VICINITY client components continuous upgrades, final version

Deliverable 4.4 contains the integrated client platform conformed from D4.1, D4.2 and D4.3, as well as the software upgrades and bug fixes until deliverable\'s due date.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-30-2015

download deliverable 

Demonstrators, pilots, prototypes 2020-03-06

Evaluation of user experience and performance of VICINITY Framework & value-added services

The deliverable will provide a report on the results of the evaluation of the user experience and assess how well the VICINITY Framework performed against the expectations set up in D8.1. It will describe the way the pilot system was evaluated, the evaluation criteria and the performance of each use case and application. This will include autonomously gathered data, results of questionnaires and evaluations of the economic and environmental performances. A rating system will be included to show the relative maturity of the use case and the applications within it. The usefulness of the dashboard will also be assessed and reported including how performance indices may be updated over time so that year-on-year improvements can be measured and tracked.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-30-2015

download deliverable 

Documents, reports 2020-03-06

Pilot results of Intelligent Transport & Parking use-case

The deliverable will contain the pilot results of the use-case for Intelligent Transport & Parking based on an open IoT platform that incorporates sensor data with intelligent agents and smart buildings. A report will describe the results from the validation performed by partners and test installation, as well as lab tests and real life test data. The report will also lay out lessons learned from sharing data from traffic management and end-to-end communication with road side equipment and other IoT objects. The deliverable should offer a way to develop an understanding of how to improve time gain and reduce strain on infrastructure and emission through use of logistics and predictive analysis.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-30-2015

download deliverable 

Documents, reports 2020-03-06

Report on eHealth at Home Installations

Report on the deployment and installation of required equipment and overall VICINITY framework for the realisation of the eHealth at Home pilot use at selected end-users in the Greek selected pilot areas.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-30-2015

download deliverable 

Documents, reports 2020-03-06

VICINITY core components continuous upgrades, final version

VICINITY core components software upgrades packages with release notes will be continuously provided, integrated, validated and deployed in the cloud. Software packages will include necessary functional and security bug fixes, functional updates and changes. Upgrades will be provided at the end of VICINITY Framework Integration & Lab Testing and at the end of Validation of VICINITY system.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-30-2015

download deliverable 

Demonstrators, pilots, prototypes 2020-03-06

Pilot results of Buildings for Assisted Living Neighbourhood use-case

The deliveris will contain the pilot result of the Building in a Neighbourhood use case through an interface for IoT platform that incorporates static building data with dynamic user-driven data requesting movement assistance, indoor climat monitoring. Challenge is to evaluate how semantics from technical building environment, abnormalities can be correctly understood by energy and parking &EV charging domain. And impotant criteria for the pilot will be how services in on domain can read semantically correct information from services ore sensordevices in other domains. This cross interoperability will be donw with information from facility management system, parking and mobility and energy. It will be conducted surveys formulas midway in the trial of use case. The results of these will form the basis for an iteration with improvements. At the end of the project there will be a similar survey and result of that will be incorporated into the project\'s final report. Evaluation criteria will be defined with T2.3 on standardization and conformity assessment.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-30-2015

download deliverable 

Documents, reports 2020-03-06

VICINITY value-added services deployment, validation, upgrade and evaluation

Report on the deployment and realisation of the implemented value-added services per each pilot Use Case, including validation against their requirements, possible upgrades and final evaluation of both technical aspects and user experience.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-30-2015

download deliverable 

Demonstrators, pilots, prototypes 2020-03-06

Evaluation of the semantic model in real world scenarios

This deliverable will describe the validation of the VICINITY ontology.
It will include an overview of the process followed to validate the
ontology, the description of the specifications and scenarios against
which the ontology will be validated, and the results of such validation.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-30-2015

download deliverable 

Documents, reports 2020-03-06

Data Management Plan, final version

The deliverable will issue the final version of the procedures and delivery of a comprehensive data management plan for the tasks addressed during the whole lifecycle of VICINITY. The plan will detail what data the project will generate in the demonstrators and take into account the exploitation potential and how it will be curated and preserved. Data management plan is related to defined ontologies in D1.4. Activities related to verification and re-use of the results will also be described and matched with VICINITY target stakeholders and consortium.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-30-2015

download deliverable 

Open Research Data Pilot 2020-03-06

Analysis of Standardisation Context and Recommendations for Standards Involvement

The deliverable will map out the standards landscape and the ecosystem relevant to IoT and specifically the place of VICINITY within it. It will analyse the existing standards and on-going work items relevant to IoT and VICINITY, and recommend the standards involvement that VICINITY partners will undertake over the life of the project. It is very important that VICINITY participates in the recent EC AIOTI standards landscaping initiative and downstreams its results into standards groups such as ETSI SmartM2M, ITS and EE, the oneM2M Partnership Project, ITU-T SG20 and Q20/5, CEN TC278 and ISO TC22 and TC204 so that the European and global community can adopt common systems and interfaces to realise the application benefits, reduce cost and risks. However, there will be insufficient resources to engage with all relevant standards bodies and the project must select the most important working groups and target these for contributions.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-30-2015

download deliverable 

Documents, reports 2019-10-29

Dissemination and Communication Plan, year 3

D9.5-D9.7 Dissemination and Communication Plan year 3 will be based on creating and following strategies for internal and external communication. Internal communication will of course be a central part in order to keep the project on track and allow cooperation between participants to flow as effortlessly as possible. Information about the project, background and on-going activities will have to be conveyed through press-releases, conferences and workshops. Update the CRM system and co-working web-spaces, project transparency for common utilisation, and sectioned for each project participant. Presentations at relevant forums will also be central to the communication plan. In order to streamline the information flow, a profile handbook will be developed, briefs will be created, brochures and a project video will be created. This will all be included in a presskit.
The project website (D9.1) will function both as a hub for communication within the workgroups and the general public. It shall also represent a necessary point of information for the consortium, other partners as well as stakeholders. Social media will be an another important media outlet, and a channel will be created for the different partners of VICINITY to inform about progress, products and results.
D9.5-D9.7 will collect all this activities into a report, for the corresponding years of project activity.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-30-2015

download deliverable 

Documents, reports 2019-10-29

Report on VICINITY business requirements

The deliverable will provide the definition of high level user requirements for IoT interoperability, ubiquitous applications, services and other smart objects based on tasks 1.1 and 1.2. Partners will contribute with requirements related to domains of their expertise. The outcome will be consolidated in order to translate the existing business establishment from use-cases as well as the user requirements of task 1.1 into the feature required in the VICINITY platform. The deliverable will also include proposals for new ontologies comprising new fields i.e. medical home sensors, human interaction, neighbourhood power usage, storage and generation, traffic and parking.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-30-2015

download deliverable 

Documents, reports 2019-10-29

Data Management Plan, first version

The deliverable will issue the first version of the procedures and delivery of a comprehensive data management plan for the tasks addressed during the whole lifecycle of VICINITY. The plan will detail what data the project will generate in the demonstrators and take into account the exploitation potential and how it will be curated and preserved. Data management plan is related to defined ontologies in D1.4. Activities related to verification and re-use of the results will also be described and matched with VICINITY target stakeholders and consortium.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-30-2015

download deliverable 

Documents, reports 2019-10-29

VICINITY requirement capture framework

The report will state the requirement capture process to get from the stakeholders communities’ workshops and the VICINITY Advisory Board members technical information related to sensors, smart objects, data sets, information management tools and other information systems and non-technical information related to commercial, security and legal aspects.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-30-2015

download deliverable 

Documents, reports 2019-10-29

VICINITY architectural design

VICINITY architectural design document includes description of VICINITY components and concepts from static and behaviour point of view. Architecture design will encompasses specifications of VICINITY usability, reliability, security, efficiency, maintenance, components functions and interactions, implementation, deployment.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-30-2015

download deliverable 

Documents, reports 2019-10-29

Project website

Description of the project website available online.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-30-2015

download deliverable 

Websites, patent fillings, videos etc. 2019-10-29

Risk Assessment, Ethical monitoring and Contingency Plans

Risks to the project may include issues such as vendor lock-in on protocols which might prevent full interoperability of interconnected smart objects, and difficulties in getting standards contributions accepted in some standards bodies. The project must also take account of security and privacy issues (such as cyber attacks) and develop techniques for protection against these. D10.2 will provide an assessment of the risks to the success of the VICINITY project based initially on the risks identified in Section 3.2.3 of the proposal. A risk register will be set up and these and other risks categorised according to severity and impact on the project. Possible mitigating actions will also be identified so that the project plan can be adapted to include any necessary actions. Based on this, a Risk Management and Contingency Plan will be drafted and agreed that will be taken into account by each WP. The ToRs of an Ethics Advisory Board also will be specified and agreed which will address any legal and ethical issues for the technologies developed by the consortium. This will also address privacy issues related to data collection and handling, providing guidance to the development and realisation of the trials and to end-user participants. Finally the principles of Quality Assurance must be established within the project to ensure that deliverables are fit for purpose and meet required standards such as ISO 9000. A project Quality Plan will be established and its principles agreed.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-30-2015

download deliverable 

Documents, reports 2019-10-29

Report on Dissemination Activities, Public Participation and Awareness, year 1

Every year two conference papers will be intended to publish in relevant international conferences (specially focus on IEEE conferences). Some of the conferences will be submitted to be published in prestigious journal from IEEE (transactions and magazines). The preprints of the papers will be also uploaded in the website of the project with free access. The results of the projects will be presented in Keynotes, Seminars and PhD courses of the University.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-30-2015

download deliverable 

Documents, reports 2019-10-29

Detailed Specification of the Semantic Model

This deliverable will describe the VICINITY ontology. It will include an
overview of the ontology development process followed to develop the
ontology, will present the relevant parts of the existing ontologies and
standards reused during the development, and will describe in detail the
different modules of the VICINITY ontology. Apart from being described
in the deliverable, the ontology will be implemented using the OWL
language and will be published online following existing recommendations
and best practices.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-30-2015

download deliverable 

Documents, reports 2019-10-29

Dissemination and Communication Plan, year 2

D9.5-D9.7 Dissemination and Communication Plan year 2 will be based on creating and following strategies for internal and external communication. Internal communication will of course be a central part in order to keep the project on track and allow cooperation between participants to flow as effortlessly as possible. Information about the project, background and on-going activities will have to be conveyed through press-releases, conferences and workshops. Establishment of a CRM system and co-working web-spaces, project transparency for common utilisation, and sectioned for each project participant. Presentations at relevant forums will also be central to the communication plan. In order to streamline the information flow, a profile handbook will be developed, briefs will be created, brochures and a project video will be created. This will all be included in a presskit.
The project website (D9.1) will function both as a hub for communication within the workgroups and the general public. It shall also represent a necessary point of information for the consortium, other partners as well as stakeholders. Social media will be an another important media outlet, and a channel will be created for the different partners of VICINITY to inform about progress, products and results.
D9.5-D9.7 will collect all this activities into a report, for the corresponding years of project activity.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-30-2015

download deliverable 

Documents, reports 2019-10-29

Data Management Plan, second version

The deliverable will issue the second version of the procedures and delivery of a comprehensive data management plan for the tasks addressed during the whole lifecycle of VICINITY. The plan will detail what data the project will generate in the demonstrators and take into account the exploitation potential and how it will be curated and preserved. Data management plan is related to defined ontologies in D1.4. Activities related to verification and re-use of the results will also be described and matched with VICINITY target stakeholders and consortium.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-30-2015

download deliverable 

Documents, reports 2019-10-29

Report on Dissemination Activities, Public Participation and Awareness, year 2

Every year two conference papers will be intended to publish in relevant international conferences (specially focus on IEEE conferences). Some of the conferences will be submitted to be published in prestigious journal from IEEE (transactions and magazines). The preprints of the papers will be also uploaded in the website of the project with free access. The results of the projects will be presented in Keynotes, Seminars and PhD courses of the University.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-30-2015

download deliverable 

Documents, reports 2019-10-29

Open Interoperability Gateway API, first version

Open Interoperability Gateway API packages and API integration support materials will be publicly published on internet and accessible for VICINITY users and wide public. Open Interoperability Gateway API packages will consists of libraries and adapter examples. The functionality provided by Open Interoperability Gateway API will be summarized in Release Note.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-30-2015

download deliverable 

Demonstrators, pilots, prototypes 2019-10-29

VICINITY technical requirements specification

VICINITY technical requirements specification document consists of functional and non-functional requirements describing detailed behaviour of VICINITY. VICINITY requirements will be based on business requirements, business drivers and barriers, IoT interoperability and value added services requirements, pilot sites and operational requirements.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-30-2015

download deliverable 

Documents, reports 2019-10-29

Report on pilot sites and operational requirements

This report is the outcome of consolidation of four survey reports conducted by ENERC in cooperation with each pilot responsible (TINYM, HITS, MPC). The pilots’ surveying general report will feature a standard template for all the sites in order to document stakeholder interviews, operational requirements of each site, the analysis of contingencies and expected results, and to list specifications of the installed systems and equipment, as well as provide a technical description of functionalities with corresponding devices and/or microgrid equipment to be adopted to IoT. The report might incorporate additional operation requirements after discussion within the consortium; in case information gaps or additional needs are identified gap analysis document would be prepared. A comparative requirements’ matrix for future replicable package creation of optimized sites surveys for operational requirements will be created.
Create knowledge management exchange between the pilot’s sites, including stakeholder’s engagement processes. Create a comparative requirements matrix for future replicable package creation of optimized sites surveys for operational requirements.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-30-2015

download deliverable 

Documents, reports 2019-10-29

VICINITY value-added services definition, requirements and architectural design

Detailed definition of value-added services, including requirements and architectural design specification, to be implemented and demonstrated per each pilot Use Case.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-30-2015

download deliverable 

Documents, reports 2019-10-29

Report on business drivers and barriers of IoT interoperability and value added services

Stakeholders will be approached to provide information related to vendor locks in the IoT systems currently used, IoT related motivations, IoT related expectations and IoT interoperability inhibitors. The established VICINITY advisory board shall be involved at identification of current and future IoT nteroperability challenges and barriers (security, privacy, legal, commercial, cultural etc.).

Programme: H2020-EU.2.1.1. - Topic(s): ICT-30-2015

download deliverable 

Documents, reports 2019-10-29

Pilot area installation methodology & planning

This deliverables will be a description of a common installation methodology for all demo sites and a specific detailed plan for every demo sites. Every pilot site address some particular aspects and focus.
Based on this methodology it will be develop a specific plan for all demo sites.
The sites in Norway will put focus on Assistive Living, Building Monitoring, Energy Flexibility, Smart Neighbourhood and Intelligent Transportation/Parking . In Portugal focus will be on Smart Buildings and Smart Energy and eHealth in Greece.
The plan will identify Adapters for real infrastructures provided by the appropriate partners (e.g. ENERC for renewable infrastructures, GNOMON, CERTH and TINYM for health and buildings, HITS for transport. OTE will develop adapters toward mobile services and ATOS will manage the development of adapters toward third party IoT assets integrated as result of Open call.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-30-2015

download deliverable 

Documents, reports 2019-09-10

VICINITY Agent and Auto-Discovery platform

The deliverable will contain the software components for VICINITY Agent and Auto-Discovery platform, implemented within T4.2. Namely, the semantically enhanced discovery of existing IoT devices on the client side will be handled by semantic query mechanisms, supported by dynamic agent-based retrieval of IoT device parameters from existing IoT device repositories. A written description of the platform architecture, functionality, and implementation details will be provided as well.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-30-2015

download deliverable 

Demonstrators, pilots, prototypes 2019-09-10

VICINITY value-added services implementation framework

Detailed definition of value-added services, including requirements and architectural design specification, to be implemented and demonstrated per each pilot Use Case.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-30-2015

download deliverable 

Demonstrators, pilots, prototypes 2019-09-10

VICINITY Security Services

VICINITY security services will include: end-to-end (gateway – to – gateway) and data encryption service based on state-of-the-art COTS tools and libraries and authorization services software packages integrated with VICINITY Neighbourhood database. The functionality of VICINITY security services will be summarised in a release note.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-30-2015

download deliverable 

Demonstrators, pilots, prototypes 2019-09-10

Auto-Discovery space deployment validation report

The deliverable will provide a written report on the validation of deployed VICINITY Auto-Discovery platform. The validation will be based on a defined set of quality and performance measures. The adopted testing environment, build as a single installation of deployed platform for all pilot cases, will be described with respect to the suitability to verify and evaluate platform capabilities such as the integration of Agent with existing services and the dynamic addition of new device types into a mock-up version of a device repository. The prototype tests will be described in detail; the achieved results will be analyzed and summarized into output recommendations for further refinements and requirements on the VICINITY platform functionality and architecture.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-30-2015

download deliverable 

Documents, reports 2019-09-10

High-available VICINITY server deployment

The high-available virtual server infrastructure including VICINITY Communication Service software packages will be provided, configured, integrated and deployed in the cloud according to the VICINITY architectural design. The functionality provided by high-available VICINITY server will be summarised in a release note.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-30-2015

download deliverable 

Demonstrators, pilots, prototypes 2019-09-10

Open Interoperability Gateway API, final version

Open Interoperability Gateway API packages and API integration support materials will be publicly published on internet and accessible for VICINITY users and wide public. Open Interoperability Gateway API packages will consists of libraries and adapter examples. The functionality provided by Open Interoperability Gateway API will be summarised in a release note.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-30-2015

download deliverable 

Demonstrators, pilots, prototypes 2019-09-10

VICINITY core components continuous upgrades, first version

VICINITY core components software upgrades packages with release notes will be continuously provided, integrated, validated and deployed in the cloud. Software packages will include necessary functional and security bug fixes, functional updates and changes. Upgrades will be provided at the end of VICINITY Framework Integration & Lab Testing and at the end of Validation of VICINITY system.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-30-2015

download deliverable 

Demonstrators, pilots, prototypes 2019-09-10

Dissemination and Communication Plan, year 4

D9.5-D9.7 Dissemination and Communication Plan year 4 will be based on creating and following strategies for internal and external communication. Internal communication will of course be a central part in order to keep the project on track and allow cooperation between participants to flow as effortlessly as possible. Information about the project, background and on-going activities will have to be conveyed through press-releases, conferences and workshops. Presentations at relevant forums will also be central to the communication plan. Update the CRM system and co-working web-spaces, project transparency for common utilisation, and sectioned for each project participant. In order to streamline the information flow, a profile handbook will be developed, briefs will be created, brochures and a project video will be created. This will all be included in a presskit.
The project website (D9.1) will function both as a hub for communication within the workgroups and the general public. It shall also represent a necessary point of information for the consortium, other partners as well as stakeholders. Social media will be an another important media outlet, and a channel will be created for the different partners of VICINITY to inform about progress, products and results.
D9.5-D9.7 will collect all this activities into a report, for the corresponding years of project activity.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-30-2015

download deliverable 

Documents, reports 2019-09-10

Set of open sample VICINITY gateway adapters

In the deliverable D4.1, a framework for designing VICINITY Gateway Adapters will be presented. On its basis several VICINITY aware gateway adapters for appliances and other objects will be created. Gateway adapters will contain support for Open VICINITY gateway API (D3.3), which will provide a communication channel and suitable methods to communicate with the VICINITY communication server (D1.1). Thus the main purpose of VICINITY gateway adapters will be to unify a communication flow that become manageable by using VICINITY Neighbourhood Manager (D3.2).

Programme: H2020-EU.2.1.1. - Topic(s): ICT-30-2015

download deliverable 

Demonstrators, pilots, prototypes 2019-09-10

VICINITY client components continuous upgrades, first version

Deliverable 4.4 contains the integrated client platform conformed from D4.1, D4.2 and D4.3, as well as the software upgrades and bug fixes until deliverable\'s due date.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-30-2015

download deliverable 

Demonstrators, pilots, prototypes 2019-09-10

VICINITY test-bed deployment, including Validation, Parameterization and Testing

This deliverable will provide the data of the implementation and experimental results obtained in lab-scale facilities regarding control design, energy management systems implementation and ICT integration. Conclusions, recommendations and guidelines for large-scale implementation will be provided as well.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-30-2015

download deliverable 

Demonstrators, pilots, prototypes 2019-09-10

Web-based VICINITY neighbourhood manager

The VICINITY Neighbourhood manager software packages will be provided, configured and integrated with other components of VICINITY. Software packages will be deployed on cloud-based virtual server infrastructure according to the VICINITY architectural design. The VICINITY Neighbourhood manager will be publicly available on internet via standard web-browser. The functionality provided by web-based VICINITY neighbourhood manager will be summarised in a release note.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-30-2015

download deliverable 

Demonstrators, pilots, prototypes 2019-09-10

Business scenarios & evaluation framework

One of the core activities of VICINITY project will be to evaluate its results against the use cases and requirements specified in D8.1, so as to validate the actual performance and impact of the project framework and identify any gaps and further work required. The deliverable will identify the business scenarios and use cases that the project will test against (based on D1.4) and specify the evaluation framework within which these will be tested. The use cases must be capable of operating from the common VICINITY platform and use as much common software as possible to avoid unnecessary repetition of design. Performance indices should be provided autonomously within each use case so that data may be recorded in real time and be remotely read by the network management system using a real time dashboard. All use cases should appear on the dashboard. The technical feasibility and effectiveness of each use case will be assessed via questionnaires so that individual users can provide ratings of the system performance and these will be specified here. It is important that the evaluation framework allows for iterative testing and assessment of the framework so that test procedures can be changed based on actual experience and the dashboard continuously updated.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-30-2015

download deliverable 

Documents, reports 2019-09-10

Semantic discovery and dynamic configuration services

The deliverable will provide the software components serving as a base of VICINITY semantic discovery and dynamic configuration service platform, accompanied by a written description of design, architecture, and implementation details. The produced software components will include the unified VICINITY semantic repository of IoT drivers that will enable a connection with external repositories by means of API for standardized adaptors and endpoints management, including the services of semantic discovery and mapping of IoT driver descriptors to the Generic IoT ontology.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-30-2015

download deliverable 

Demonstrators, pilots, prototypes 2019-09-10

VICINITY integrated prototype

The deliverable will provide the integrated prototype serving as a base of VICINITY prototype based on the requirements set in WP1and can be demonstrate the Use Cases for the envisioned scenarios. Adapters from the laboratory environments will be developed by partners. CERTH will integrate available test-best facilities of smart house and intelligent building multi-sensorial infrastructure available. AAU will integrate ICT solutions and energy systems together with control and energy management systems. Lab tests will be done in the microgrid research labs of AAU. TINYM will integrate its own proprietary generic IoT solution and the monitor solutions for online, wireless measurement of indoor air quality, usage patterns and energy consumption in buildings. Finally, ATOS will integrate with its Internet of Everything Lab (IoE Lab).

Programme: H2020-EU.2.1.1. - Topic(s): ICT-30-2015

download deliverable 

Demonstrators, pilots, prototypes 2019-09-10

Report on Dissemination Activities, Public Participation and Awareness, year 3

Every year two conference papers will be intended to publish in relevant international conferences (specially focus on IEEE conferences). Some of the conferences will be submitted to be published in prestigious journal from IEEE (transactions and magazines). The preprints of the papers will be also uploaded in the website of the project with free access. The results of the projects will be presented in Keynotes, Seminars and PhD courses of the University.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-30-2015

download deliverable 

Documents, reports 2019-09-10