The page lists 9 deliverables related to the research project "STEMM-CCS".
title and desprition | type | last update |
---|---|---|
Training workshop 2A dedicated residential training event will be held to deliver specialist training on sub-seabed CO2 storage, monitoring and decision support systems including best practice. The course content will span a range of topics from technical aspects to bigger-picture issues. These events will be open to all project participants also a wider industrial/regulatory/stakeholder audience, and will include invited specialists from industry and regulatory bodies to both participate in the training and/or deliver some of the training content. Programme: H2020-EU.3.3.2.3. - Topic(s): LCE-15-2015 |
Other | 2020-03-25 |
Technology prototyping and testingReport on the construction of prototype systems and testing prior to demonstration deployments. Sections include full details of testing of i) technologies for flux and leak quantification and ii) technologies for baseline data collection and decision support. Programme: H2020-EU.3.3.2.3. - Topic(s): LCE-15-2015 |
Documents, reports | 2020-03-25 |
Training workshop 1A dedicated residential training event will be held to deliver specialist training on sub-seabed CO2 storage. The course content will span a range of topics from technical aspects to bigger-picture issues. These events will be open to all project participants, and will include invited specialists from industry and regulatory bodies to both participate in the training and/or deliver some of the training content. Programme: H2020-EU.3.3.2.3. - Topic(s): LCE-15-2015 |
Other | 2020-03-25 |
Generic method for the application of remote sensing in guiding CCS baseline data acquisitionA generic methodology for using remote sensing to guide baseline characterisation and data collection will be developed and published. Programme: H2020-EU.3.3.2.3. - Topic(s): LCE-15-2015 |
Documents, reports | 2020-03-25 |
Science briefsA series of short (2 sides A4) but informative briefing documents outlining key issues, scientific concepts, challenges and guidance on best practice will be produced. They will be targeted at a range of stakeholder audiences and will be available for download from the website. Programme: H2020-EU.3.3.2.3. - Topic(s): LCE-15-2015 |
Other | 2020-03-25 |
Glossary of terminologyWork with Shell and other stakeholders to produce an updated compendium of terminology for CCS and related disciplines Programme: H2020-EU.3.3.2.3. - Topic(s): LCE-15-2015 |
Other | 2020-03-25 |
Project brochureAttractive and informative project brochure to promote STEMM-CSS Programme: H2020-EU.3.3.2.3. - Topic(s): LCE-15-2015 |
Other | 2020-03-25 |
Project websiteWebsite to facilitate the dissemination of information about STEMM-CCS and CCS in general to the broadest range of audiences, from general public to scientists. Programme: H2020-EU.3.3.2.3. - Topic(s): LCE-15-2015 |
Other | 2020-03-25 |
Simulated leak experiment site and logistics planReport detailing the equipment to be used at the site of the simulated leak experiment the requirements for each during the experiment and a plan of how this equipment will be arranged and delivered to site. Programme: H2020-EU.3.3.2.3. - Topic(s): LCE-15-2015 |
Documents, reports | 2020-03-25 |