The page lists 54 deliverables related to the research project "AMASS".
title and desprition | type | last update |
---|---|---|
AMASS demonstrators (c)This deliverable will demonstrate the AMASS solutions in the different application domains. These demonstrators include the full development of the three prototype iterations. This is iteration (c). Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-07-2015 |
Demonstrators, pilots, prototypes | 2020-01-31 |
Methodological guide for cross/intra-domain reuse (b)This deliverable is the output of task 6.4. This deliverable will provide detailed information about how to use the reuse-enabler tool support and how to apply the underlying approach. Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-07-2015 |
Documents, reports | 2020-01-31 |
Design of the AMASS tools and methods for cross/intra-domain reuse (b)This deliverable is the output of task 6.2. This deliverable reports on the design of the reuse-enabler prototype. It will especially contain metamodel(s), model-transformations, ontologies. This deliverable will be developed incrementally, with revisions to the approach made after validation from the implementation. Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-07-2015 |
Documents, reports | 2020-01-31 |
Prototype for multiconcern assurance (c)This deliverable is the output of the task 4.3. The third iteration implements incrementally the AMASS-specific building blocks according to the high-level requirements specification and implementation roadmap defined in WP2 (T2.1). Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-07-2015 |
Demonstrators, pilots, prototypes | 2020-01-31 |
AMASS platform validationThis report will provide information about the results of the AMASS tool platform testing and the accomplishment of AMASS high-level requirements. Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-07-2015 |
Documents, reports | 2020-01-31 |
Dissemination and Training Progress (c)This deliverable reports progress on dissemination and training activities. Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-07-2015 |
Documents, reports | 2020-01-31 |
Design of the AMASS tools and methods for seamless interoperability (b)This deliverable is the output of task 5.2. This deliverable reports on the design of the seamless interoperability tool support. It will contain metamodel(s) such as contributions for CACM, interfaces, format specifications, and the tool architect. This deliverable will be developed incrementally, with revisions to the approach made after validation from the implementation. Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-07-2015 |
Documents, reports | 2020-01-31 |
AMASS open source platform provisioning and website (c)This deliverable of task T7.3 will be coordinated with D2.4 and coordinate all the non-software artefacts of the AMASS open source platform including the project website. As with D2.4 this deliverable will be produced in three different iterations. Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-07-2015 |
Demonstrators, pilots, prototypes | 2020-01-31 |
AMASS solution benchmarkingThis deliverable reports the assessment of the development methodology and runtime implementation of the case studies over the AMASS platform. It results from the benchmarking exercise. It also compares results achieved thanks to AMASS with former state of the art for reference case studies. Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-07-2015 |
Documents, reports | 2020-01-31 |
Integrated AMASS platform (c)This prototype will be incrementally released in three iterations, as result of the validation tasks. It represents the whole AMASS tool platform, iteration (c). Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-07-2015 |
Demonstrators, pilots, prototypes | 2020-01-31 |
Prototype for cross/intra-domain reuse (c)This deliverable is the output of the task 6.3. This deliverable represents the tools for reuse-enabler prototype. Three prototype iterations are planned. The third iteration implements incrementally the AMASS-specific building blocks according to the high-level requirements specification and implementation roadmap defined in WP2 (T2.1). Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-07-2015 |
Demonstrators, pilots, prototypes | 2020-01-31 |
Standardization Roadmap and ReportThis document describes the AMASS standardization activities and results, and provides a systematic roadmap for the follow-up of AMASS. It also contains recommendations of the Advisory Board for improving the AMASS adoption in specific standardization bodies. Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-07-2015 |
Documents, reports | 2020-01-31 |
Prototype for architecture-driven assurance (c)This deliverable is the output of the task 3.3. The third iteration implements incrementally the AMASS-specific building blocks according to the high-level requirements specification and implementation roadmap defined in WP2 (T2.1). Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-07-2015 |
Demonstrators, pilots, prototypes | 2020-01-31 |
Prototype for seamless interoperability (c)This deliverable is the output of the task 5.3. Three prototype iterations are planned. The third iteration implements incrementally the AMASS-specific building blocks according to the high-level requirements specification and implementation roadmap defined in WP2 (T2.1). Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-07-2015 |
Demonstrators, pilots, prototypes | 2020-01-31 |
Methodological guide for multiconcern assurance (b)This deliverable is the output of task 4.4. It will report on the progress of the guidelines for applying the system architecture-driven assurance approach. This report will present guidance on the use of the conceptual approach and prototype tool, aimed at users argument developers and project engineers. Two iterations of this deliverable will be produced. This second iteration, at the end of the project, is to assist in wider technology transfer after AMASS. Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-07-2015 |
Documents, reports | 2020-01-31 |
Methodological guide for seamless interoperability (b)This deliverable is the output of task 5.4. This deliverable will provide detailed information about how to use the seamless interoperability tool support and how to apply the underlying approach. Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-07-2015 |
Documents, reports | 2020-01-31 |
External advisory board and industrial adoption program reportAt the end of the project, this report will document the actions taken and their results to coordinate the external advisory board in task T7.1 and to improve industrial adoption of AMASS in task T7.2. Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-07-2015 |
Documents, reports | 2020-01-31 |
AMASS user guidance and methodological frameworkThis deliverable will supply the entire project with the overall methodology for AMASS, including the steps of the proposed process and the interfaces between the steps. It will also include guidance for AMASS platform users and developers. Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-07-2015 |
Documents, reports | 2020-01-31 |
Methodological guide for architecture-driven assurance (b)This deliverable is the output of task 3.4. It will report on the progress of the guidelines for applying the system architecture-driven assurance approach, iteration (b). Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-07-2015 |
Documents, reports | 2020-01-31 |
Design of the AMASS tools and methods for multiconcern assurance (b)This deliverable is the output of task 4.2. In this deliverable, we will present the conceptual approach for multi-concern assurance, in the form of CACM models and vocabulary for the relevant assurance concerns with respect to the target domains and case studies and a revised compositional framework to support multiple viewpoints and trade-offs. This deliverable will be developed incrementally, with revisions to the approach made after validation from the implementation. Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-07-2015 |
Documents, reports | 2020-01-31 |
AMASS reference architecture (c)This deliverable (incremental version c) provides the AMASS architecture specification from different points of view: logical, interaction and physical/deployment. It contains the specifications to get a coherent integration beween the various AMASS building blocks. Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-07-2015 |
Documents, reports | 2020-01-31 |
Exploitation Results and Final Market Megatrends AnalysisAn updated version of D8.2 including detailed SWOT analysis for each domain. Each partner will provide results and progress against initial exploitation plans, and future plans beyond the life of the project. Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-07-2015 |
Documents, reports | 2020-01-31 |
Dissemination and Training Progress (b)This deliverable reports progress on dissemination and training activities. Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-07-2015 |
Documents, reports | 2020-01-31 |
Prototype for architecture-driven assurance (b)This deliverable is the output of the task 3.3. The second iteration implements incrementally the AMASS-specific building blocks according to the high-level requirements specification and implementation roadmap defined in WP2 (T2.1). Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-07-2015 |
Demonstrators, pilots, prototypes | 2020-01-31 |
AMASS demonstrators (b)This deliverable will demonstrate the AMASS solutions in the different application domains. These demonstrators include the full development of the three prototype iterations. This is iteration (b). Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-07-2015 |
Demonstrators, pilots, prototypes | 2020-01-31 |
Standardization PlanThis document identifies possible applicable AMASS standardization targets. It also contains a preliminary roadmap how and when to approach the standardization committees or harmonize existing and upcoming standardization activities if required. It contains a report on standardization activities as well. Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-07-2015 |
Documents, reports | 2020-01-31 |
Exploitation Plans and Initial Market Megatrends Analysis (b)A set of exploitation plans, with contributions per partner (adapted as needed for industrial vs academic needs). Second version of the deliverable includes refined domain specific market analysis. Market entry strategies for every partner. Expected barriers to market entry. Expected commercial advantages for every partner (through revenue generation, increased productivity, increased value proposition etc.). Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-07-2015 |
Documents, reports | 2020-01-31 |
Evaluation framework and quality metricsIt reports the guidelines that will be used by different evaluators to carry out a harmonized assessment of the AMASS methodology and platform. In addition the deliverable will define the quality metrics to measurement the achievement of AMASS project regarding the propose objectives. Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-07-2015 |
Documents, reports | 2020-01-31 |
AMASS open source platform provisioning and website (b)This deliverable of task T7.3 will be coordinated with D2.4 and coordinate all the non-software artefacts of the AMASS open source platform including the project website. As with D2.4 this deliverable will be produced in three different iterations. Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-07-2015 |
Demonstrators, pilots, prototypes | 2020-01-31 |
Case studies description and business impactSpecification of the industrial case studies as required for covering the different aspects of the project and that are required to measure the AMASS platform improvements and to demonstrate them. Analysis of the case studies to harmonize common and specific requirements from the different application domains. Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-07-2015 |
Documents, reports | 2020-01-31 |
AMASS demonstrators (a)This deliverable will demonstrate the AMASS solutions in the different application domains. These demonstrators include the full development of the three prototype iterations (at the end of each relevant milestone M2-M4) as described in Section 1.3.6. This is iteration (a) of the prototype. Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-07-2015 |
Demonstrators, pilots, prototypes | 2020-01-31 |
Prototype for cross/intra-domain reuse (b)This deliverable is the output of the task 6.3. This deliverable represents the tools for reuse-enabler prototype. Three prototype iterations are planned. The second iteration implements incrementally the AMASS-specific building blocks according to the high-level requirements specification and implementation roadmap defined in WP2 (T2.1). Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-07-2015 |
Demonstrators, pilots, prototypes | 2020-01-31 |
Prototype for seamless interoperability (b)This deliverable is the output of the task 5.3. Three prototype iterations are planned. The second iteration implements incrementally the AMASS-specific building blocks according to the high-level requirements specification and implementation roadmap defined in WP2 (T2.1). Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-07-2015 |
Demonstrators, pilots, prototypes | 2020-01-31 |
Design of the AMASS tools and methods for architecture-driven assurance (b)This deliverable is the output of task 3.2. It will report the design of the architecture-driven assurance prototype, including its conceptual aspects and tool intrastructure in the form of CACM models, iteration (b). Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-07-2015 |
Documents, reports | 2020-01-31 |
AMASS open source platform provisioning and website (a)This deliverable of task T7.3 will be coordinated with D2.4 and coordinate all the non-software artefacts of the AMASS open source platform including the project website. As with D2.4 this deliverable will be produced in three different iterations. Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-07-2015 |
Demonstrators, pilots, prototypes | 2020-01-31 |
Integrated AMASS platform (b)This prototype will be incrementally released in three iterations, as result of the validation tasks. It represents the whole AMASS tool platform, iteration (b). Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-07-2015 |
Demonstrators, pilots, prototypes | 2020-01-31 |
Prototype for multiconcern assurance (b)This deliverable is the output of the task 4.3. The first second iteration implements incrementally the AMASS-specific building blocks according to the high-level requirements specification and implementation roadmap defined in WP2 (T2.1). Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-07-2015 |
Demonstrators, pilots, prototypes | 2020-01-31 |
AMASS open source platform marketing and outreach planAMASS open source platform marketing and outreach plan (report) Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-07-2015 |
Documents, reports | 2020-01-31 |
Prototype for multiconcern assurance (a)This deliverable is the output of the task 4.3. The first iteration will release the basic building blocks (Prototype: Core) as a consolidation/integration of previous projects. Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-07-2015 |
Demonstrators, pilots, prototypes | 2020-01-31 |
External advisory board and industrial adoption program roadmapThis deliverable will define the plan for task T7.1 and T7.2. Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-07-2015 |
Documents, reports | 2020-01-31 |
Integrated AMASS platform (a)This prototype will be incrementally released in three iterations, as result of the validation tasks. It represents the whole AMASS tool platform, iteration (a). Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-07-2015 |
Demonstrators, pilots, prototypes | 2020-01-31 |
Prototype for cross/intra-domain reuse (a)This deliverable is the output of the task 6.3. This deliverable represents the tools for reuse-enabler prototype. Three prototype iterations are planned. The first iteration will release the basic building blocks (Prototype: Core) as a consolidation/integration of previous projects. Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-07-2015 |
Demonstrators, pilots, prototypes | 2020-01-31 |
Standardization SurveyThis document identifies involvement of AMASS partners in standardization activities, including active standardization contributions, status as followers or users as well. It contains a report on existing standardization activities and outcomes as well. Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-07-2015 |
Documents, reports | 2020-01-31 |
Baseline and requirements for architecture-driven assuranceThis deliverable is the output of task 3.1. It will set the baseline from the system architecture-driven assurance will be developed and will specify the requirements that it has to meet. Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-07-2015 |
Documents, reports | 2020-01-31 |
Baseline and requirements for seamless interoperabilityThis deliverable is the output of task 5.1. This deliverable reports on the baseline for seamless interoperability and on the identified gaps with current approaches and technological solutions, as well as on the requirements for seamless interoperability in the AMASS tool platform. Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-07-2015 |
Documents, reports | 2020-01-31 |
Business cases and high-level requirementsThis deliverable will summarize business cases and all collected customer needs for using the AMASS solutions. It will also describe the high-level technical requirements for the AMASS technical work packages. This document will evolve during the project life as requirements are adjusted, refined, and assessed. Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-07-2015 |
Documents, reports | 2020-01-31 |
Exploitation Plans and Initial Market Megatrends Analysis (a)A set of exploitation plans, with contributions per partner (adapted as needed for industrial vs academic needs). This deliverable provides first draft of overall market analysis with respect to CPS products. It shall include preliminary information concerning domain specific mega trends and market turbulences. Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-07-2015 |
Documents, reports | 2020-01-31 |
AMASS open source platform project proposalThe first step of the Eclipse Development Process is to create and publish a project proposal for review by the community at large. This deliverable will be the first step to create the AMASS open source platform, and will define and explain the scope of the project to the worldwide Eclipse community. Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-07-2015 |
Documents, reports | 2020-01-31 |
Dissemination and Training Progress (a)This deliverable reports progress on dissemination and training activities. Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-07-2015 |
Documents, reports | 2020-01-31 |
Prototype for seamless interoperability (a)This deliverable is the output of the task 5.3. Three prototype iterations are planned. The first iteration will release the basic building blocks (Prototype: Core) as a consolidation/integration of previous projects. Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-07-2015 |
Demonstrators, pilots, prototypes | 2020-01-31 |
Prototype for architecture-driven assurance (a)This deliverable is the output of the task 3.3. The first iteration will release the basic building blocks (Prototype: Core) as a consolidation/integration of previous projects. Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-07-2015 |
Demonstrators, pilots, prototypes | 2020-01-31 |
Baseline and requirements for multiconcern assuranceThis deliverable is the output of task 4.1. This deliverable will present the results of the state-of-the-art survey of multi-concern assurance. It will focus on the identification of relevant assurance concerns for inclusion in the AMASS framework, and on the identification of areas where the “mapping†technology developed in OPENCOSS can most effectively be deployed in AMASS. Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-07-2015 |
Documents, reports | 2020-01-31 |
Baseline and requirements for cross/intra-domain reuseThis deliverable is the output of task 6.1. This deliverable reports on the baseline for enabling cross and intra domain reuse, the identified gaps with current approaches and technological solutions as well as on the requirements for the AMASS prototype. Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-07-2015 |
Documents, reports | 2020-01-31 |
Dissemination and Training PlanThis deliverable lists planned activities for dissemination of project results, identifies needs for project internal training as well as internal/external training related to concepts and technologies developed within the project. Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-07-2015 |