The page lists 75 deliverables related to the research project "ENABLE-S3".
title and desprition | type | last update |
---|---|---|
D3.1.2 Analysis of datasets for scenario generation and sensor modellingThe datasets are analyzed using machine learning approaches to support the development of sensor models and scenario generation. Big data in human-machine-interaction in automated driving will also be addressed. Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-17-2015 |
Documents, reports | 2020-04-23 |
D1.2.2 v1 System under test requirements and test system requirements from the aerospace domainA combined report on aerospace use case requirements will be given. This report will define two different kinds of requirements. On the one side requirements on the system under test will be defined. On the other side requirements on the test system will be defined. This document will be delivered in a preliminary and a final version. Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-17-2015 |
Documents, reports | 2020-04-23 |
D2.2.1 Metrics and measurements for evaluation reportThis deliverable summarizes the metrics and measurements which will used by the use case owners to evaluate the project results. Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-17-2015 |
Documents, reports | 2020-04-23 |
D4.3.2 v1 Demonstration Report + Feedback from the rail use caseThis deliverable includes one report for the rail use case describing the demonstrator, the results of the demonstration execution and the feedback regarding the completeness and applicability of the developed results. Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-17-2015 |
Documents, reports | 2020-04-23 |
D.3.4.1 Platform specificationThis deliverable will define the modular ACPS co-simulation and validation platform, simulation model and data management, data recording as well as required standardized interfaces for office simulation, MiL, SiL, and HiL Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-17-2015 |
Documents, reports | 2020-04-23 |
D4.6.2 v1 Demonstration Report + Feedback of the farming use caseThis deliverable includes one report for the farming use case describing the demonstrator, the results of the demonstration execution and the feedback regarding the completeness and applicability of the developed results. preliminary version according to the agile development process. Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-17-2015 |
Documents, reports | 2020-04-23 |
D4.4.2 v1 Demonstration Report + Feedback from the maritime use caseThis deliverable includes one report for the maritime use case describing the demonstrator, the results of the demonstration execution and the feedback regarding the completeness and applicability of the developed results. Preliminary version according to the agile development process. Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-17-2015 |
Documents, reports | 2020-04-23 |
D3.1.1 Identification of DatasetsFirst collection of results of tasks 3.1.1. Suitable Datasets are identified and gathered to be used in the project. Need for data recordings in the project identified. Methods and examples for instrumentation are described. Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-17-2015 |
Documents, reports | 2020-04-23 |
D3.2.2 v1 V&V MethodologyResults of task 3.2.6. M12: first version. First and updated versions will be provided to SP4 for application and feedback; intermediate versions will be provided for early consideration. It will also comprise description how consolidated requirements will be addressed by WP3.2 Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-17-2015 |
Documents, reports | 2020-04-23 |
D3.2.2 v2 V&V-MethodologyResults of task 3.2.6. M24: updated version. First and updated versions will be provided to SP4 for application and feedback; intermediate versions will be provided for early consideration. It will also comprise description how consolidated requirements will be addressed by WP3.2 Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-17-2015 |
Documents, reports | 2020-04-23 |
D3.5.1 Description of requirements and of V&V criteria for component simulation and stimulationA report will be given about the requirements on component simulation and stimulation that specifies the input from the use cases and the V&V methodology of the use cases. Referring to the requirements the criteria for simulation model and stimulation system V&V are decribed. Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-17-2015 |
Documents, reports | 2020-04-23 |
D5.1.1 Project webpageThe project webpage will be designed, maintained and updated on a regular basis. Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-17-2015 |
Other | 2020-04-23 |
D1.1.2 v2 System under test requirements and test system requirements from the automotive domainUpdate of D1.1.2 v1 Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-17-2015 |
Documents, reports | 2020-04-23 |
D1.2.2. v2 System under test requirements and test system requirements from the aerospace domainUpdate of Deliverable D1.2.2 v1 Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-17-2015 |
Documents, reports | 2020-04-23 |
D4.1.2 v1 Demonstration Report + Feedback from the automotive use casesThis deliverable includes one report per automotive use case describing the demonstrator, the results of the demonstration execution and the feedback regarding the completeness and applicability of the developed results. There will be three versions of the deliverable: a preliminary, an intermediate and a final one according to the agile development process. Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-17-2015 |
Documents, reports | 2020-04-23 |
D1.2.3 v1 Evaluation result of the aerospace domainA report will be given on the results of executing the evaluation. This deliverable gives a statement on whether or not the objectives of the ENABLE S3 project are reached. This will be done twice first for the intermediate results and second for the final results. Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-17-2015 |
Documents, reports | 2020-04-23 |
D3.4.3 v1 ACPS integration platform for online/offline model couplingThis prototype will include the modular integration platform for ACPS non-real-time and real-time simulation models Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-17-2015 |
Demonstrators, pilots, prototypes | 2020-04-23 |
D2.1.2 v2 Requirement consolidation reportUpdate of D2.1.2 v1 Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-17-2015 |
Documents, reports | 2020-04-23 |
D1.1.3 v1 Evaluation result of the automotive domainA report will be given on the results of executing the evaluation. This deliverable gives a statement on whether or not the objectives of the ENABLE S3 project are reached. This will be done twice first for the intermediate results and second for the final results. Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-17-2015 |
Documents, reports | 2020-04-23 |
D4.5.2 v1 Demonstration Report + Feedback from the health use casesThis deliverable includes one report per health use case describing the demonstrator, the results of the demonstration execution and the feedback regarding the completeness and applicability of the developed results. preliminary version according to the agile development process. Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-17-2015 |
Documents, reports | 2020-04-23 |
D4.2.2 v1 Demonstration Report + Feedback from the aerospace use casesD4.2.2 v1 Demonstration Report + Feedback from the aerospace use cases Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-17-2015 |
Documents, reports | 2020-04-23 |
D1.6.3 v1 Evaluation result of the farming domainA report will be given on the results of executing the evaluation. This deliverable gives a statement on whether or not the objectives of the ENABLE S3 project are reached. This will be done twice first for the intermediate results and second for the final results. Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-17-2015 |
Documents, reports | 2020-04-23 |
D5.3.1 v2 Report on IOS and RTP ContributionsThis deliverable presents the ENABLE S3 contributions to the IOS and RTP respectively as outcomes of the task T5.2. 1. Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-17-2015 |
Documents, reports | 2020-04-23 |
D5.3.2 v1 Report on Standardisation WorkThis deliverable describes the pre-standardisation and standardisation activities that are conducted in the task T5.2.2. Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-17-2015 |
Documents, reports | 2020-04-23 |
D5.1.2 v1 Project NewsletterThis deliverable reports on all recent news and activities from the project. Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-17-2015 |
Other | 2020-04-23 |
D1.3.2 v2 System under test requirements and test system requirements from the rail domainUpdate of D1.3.2 v1 Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-17-2015 |
Documents, reports | 2020-04-23 |
D1.1.2 v1 System under test requirements and test system requirements from the automotive domainA combined report on automotive use case requirements will be given. This report will define two different kinds of requirements. On the one side requirements on the system under test will be defined. On the other side requirements on the test system will be defined. This document will be delivered in a preliminary and a final version. Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-17-2015 |
Documents, reports | 2020-04-23 |
D1.6.2 v1 System under test requirements and test system requirements from the farming domainA combined report on farming use case requirements will be given. This report will define two different kinds of requirements. On the one side requirements on the system under test will be defined. On the other side requirements on the test system will be defined. This document will be delivered in a preliminary and a final version. Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-17-2015 |
Documents, reports | 2020-04-23 |
D1.6.2 v2 System under test requirements and test system requirements from the farming domainUpdate of D1.6.2 v1 Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-17-2015 |
Documents, reports | 2020-04-23 |
D1.4.2 v1 System under test requirements and test system requirements from the maritime domainA combined report on maritime use case requirements will be given. This report will define two different kinds of requirements. On the one side requirements on the system under test will be defined. On the other side requirements on the test system will be defined. This document will be delivered in a preliminary and a final version. Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-17-2015 |
Documents, reports | 2020-04-23 |
D1.5.3 v1 Evaluation result of the health domainA report will be given on the results of executing the evaluation. This deliverable gives a statement on whether or not the objectives of the ENABLE S3 project are reached. This will be done twice first for the intermediate results and second for the final results. Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-17-2015 |
Documents, reports | 2020-04-23 |
D1.4.2 v2 System under test requirements and test system requirements from the maritime domainUpdate of D1.4.2 v1 Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-17-2015 |
Documents, reports | 2020-04-23 |
D2.1.1 Requirements Guidline ReportThis deliverable will describe the guidelines for writing testable requirements. Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-17-2015 |
Documents, reports | 2020-04-23 |
D1.3.3 v1 Evaluation result of the rail domainA report will be given on the results of executing the evaluation. This deliverable gives a statement on whether or not the objectives of the ENABLE S3 project are reached. This will be done twice first for the intermediate results and second for the final results. Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-17-2015 |
Documents, reports | 2020-04-23 |
D1.3.2 v1 System under test requirements and test system requirements from the rail domainA combined report on rail use case requirements will be given. This report will define two different kinds of requirements. On the one side requirements on the system under test will be defined. On the other side requirements on the test system will be defined. This document will be delivered in a preliminary and a final version. Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-17-2015 |
Documents, reports | 2020-04-23 |
D5.1.2 v2 Project NewsletterThis deliverable reports on all recent news and activities from the project. Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-17-2015 |
Other | 2020-04-23 |
D5.1.3 Final Dissemination PlanThis dissemination plan is a refined version of the preliminary one described in the project proposal. Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-17-2015 |
Documents, reports | 2020-04-23 |
D1.6.1 Specification of the Farming Use CaseA report will be given on the specification of the farming use case. A detailed description will be given on each use case, its functions, area and way of application, components used and its boundary conditions. Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-17-2015 |
Documents, reports | 2020-04-23 |
D1.5.2 v1 System under test requirements and test system requirements from the health domainA combined report on health use case requirements will be given. This report will define two different kinds of requirements. On the one side requirements on the system under test will be defined. On the other side requirements on the test system will be defined. This document will be delivered in a preliminary and a final version. Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-17-2015 |
Documents, reports | 2020-04-23 |
D2.1.2 v1 Requirement consolidation reportThis deliverable will summarize the consolidated requirements from the use cases from the different domains. Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-17-2015 |
Documents, reports | 2020-04-23 |
D1.5.2 v2 System under test requirements and test system requirements from the health domainUpdate of D1.5.2 v1 Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-17-2015 |
Documents, reports | 2020-04-23 |
D5.3.1 v1 Report on IOS and RTP ContributionsThis deliverable presents the ENABLE S3 contributions to the IOS and RTP respectively as outcomes of the task T5.2. 1. Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-17-2015 |
Documents, reports | 2020-04-23 |
D1.4.3 v1 Evaluation result of the maritime domainA report will be given on the results of executing the evaluation. This deliverable gives a statement on whether or not the objectives of the ENABLE S3 project are reached. This will be done twice first for the intermediate results and second for the final results. Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-17-2015 |
Documents, reports | 2020-04-23 |
D4.6.2 v3 Demonstration Report + Feedback of the farming use casefinal version according to the agile development process. Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-17-2015 |
Documents, reports | 2019-11-26 |
D5.1.2 v3 Project NewsletterThis deliverable reports on all recent news and activities from the project. Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-17-2015 |
Other | 2019-11-26 |
D3.4.1 v2 Platform specificationUpdate of Platform specification v1 Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-17-2015 |
Documents, reports | 2019-11-26 |
D4.5.2 v2 Demonstration Report + Feedback from the health use casesintermediate version according to the agile development process. Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-17-2015 |
Documents, reports | 2019-11-26 |
D3.5.1 v2 Description of requirements and of V&V criteria for component simulation and stimulationUpdate of Description of requirements and of V&V criteria for component simulation and stimulation v1 Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-17-2015 |
Documents, reports | 2019-11-26 |
D5.3.2 v2 Report on Standardisation WorkUpdate of version 1 Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-17-2015 |
Documents, reports | 2019-11-26 |
D4.4.2 v2 Demonstration Report + Feedback from the maritime use caseintermediate version according to the agile development process. Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-17-2015 |
Documents, reports | 2019-11-26 |
D5.3.1 v3 Report on IOS and RTP ContributionsUpdate of version 2 Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-17-2015 |
Documents, reports | 2019-11-26 |
D4.1.2 v3 Demonstration Report + Feedback from the automotive use casesfinal version Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-17-2015 |
Documents, reports | 2019-11-26 |
D4.5.2 v3 Demonstration Report + Feedback from the health use casesfinal version according to the agile development process. Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-17-2015 |
Documents, reports | 2019-11-26 |
D4.3.2 v3 Demonstration Report + Feedback from the rail use casefinal version according to the agile development process. Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-17-2015 |
Documents, reports | 2019-11-26 |
D5.1.4 v2 Final Communication & Dissemination ReportThis deliverable gives details about dissemination activities conducted by ENABLE S3 partners. Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-17-2015 |
Documents, reports | 2019-11-26 |
D4.2.2 v2 Demonstration Report + Feedback from the aerospace use casesintermediate version according to the agile development process. Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-17-2015 |
Documents, reports | 2019-11-26 |
D4.4.2 v3 Demonstration Report + Feedback from the maritime use casefinal version according to the agile development process. Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-17-2015 |
Documents, reports | 2019-11-26 |
D4.6.2 v2 Demonstration Report + Feedback of the farming use caseintermediate version according to the agile development process. Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-17-2015 |
Documents, reports | 2019-11-26 |
D4.2.2 v3 Demonstration Report + Feedback from the aerospace use casesfinal version according to the agile development process. Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-17-2015 |
Documents, reports | 2019-11-26 |
D3.2.2 v3 V&V-MethodologyResults of task 3.2.6. M34 final version. Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-17-2015 |
Documents, reports | 2019-11-26 |
D4.3.2 v2 Demonstration Report + Feedback from the rail use caseintermediate version according to the agile development process. Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-17-2015 |
Documents, reports | 2019-11-26 |
D5.1.4 v1 Intermediate Communication & Dissemination ReportThis deliverable gives details about dissemination activities conducted by ENABLE S3 partners. Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-17-2015 |
Documents, reports | 2019-11-26 |
D2.2.2 Measurements and final evaluationThis deliverable summarizes the results of the use case evaluations in order to have an overview of the project results. Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-17-2015 |
Documents, reports | 2019-11-22 |
D3.1.5 List of recorded Datasetsupdate of D3.1.1. Publication of a list of all provided Datasets gathered within the project, which can be used for testing of automated systems. Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-17-2015 |
Documents, reports | 2019-11-22 |
D3.4.3 v2 ACPS integration platform for online/offline model couplingThis prototype will include the modular integration platform for ACPS non-real-time and real-time simulation models Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-17-2015 |
Demonstrators, pilots, prototypes | 2019-11-22 |
D1.1.3 v2 Evaluation result of the automotive domainUpdate of D1.1.3 v1 Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-17-2015 |
Documents, reports | 2019-11-22 |
D1.6.3 v2 Evaluation result of the farming domainUpdate of D1.6.3 v1 Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-17-2015 |
Documents, reports | 2019-11-22 |
D1.2.3 v2 Evaluation result of the aerospace domainUpdate of D1.2.3 v1 Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-17-2015 |
Documents, reports | 2019-11-22 |
D2.3.1 Requirements trackingContinuous up-to-date status of requirements in a requirement database. Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-17-2015 |
Documents, reports | 2019-11-22 |
D3.1.3 Analysis of error effects & attack vectorsThe error effects occurring in the gathered dataset are analyzed and the resulting information is condensed in such a way, that WP3.3 can use the results to train/configure the error injection models. The deliverable will contain an analysis of attack vectors and possibilities for their detection as well as a compilation of security and safety threats of timing and wireless network behavior and communication and a compilation of identified abnormal behaviors and potential safety and security threats. Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-17-2015 |
Documents, reports | 2019-11-22 |
D4.1.2 v2 Demonstration Report + Feedback from the automotive use casesUpdate of v1 Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-17-2015 |
Documents, reports | 2019-11-22 |
D1.4.3 v2 Evaluation result of the maritime domainUpdate of D1.4.3 v1 Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-17-2015 |
Documents, reports | 2019-11-22 |
D3.1.4 Reference Scenarios and benchmark for testing of ACPS and automated driving functionsThis deliverable entails the identification of typical usage scenarios to establish safety-critical aspects and to serve as reference. Scenarios which will be based on big data analysis and simulations and are domain-specific. It will comprise reference scenarios and benchmarks for all use case domains addressed in ENABLE S3, e.g. medical equipment, a benchmark for stochastic modeling of maneuver-based human driver behavior and interaction with other traffic participants based on analysis and segmentation of big data or parsing of spatial and temporal expression in English traffic-related texts, event detection across multiple streams of data and recommender systems for dealing with in-car simulations, which suggest a plurality of actions. The benchmark will be based on data from Dublin, Ireland; A benchmark for ADAS testing by identification of safety critical driving scenarios. Earlier versions of benchmark will be provided to demonstrators for use and feedback. Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-17-2015 |
Documents, reports | 2019-11-22 |
D1.5.3 v2 Evaluation result of the health domainUpdate of D1.5.3 v1 Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-17-2015 |
Documents, reports | 2019-11-22 |
D1.3.3 v2 Evaluation result of the rail domainUpdate of D1.3.3 v1 Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-17-2015 |
Documents, reports | 2019-11-22 |