Opendata, web and dolomites

INTERMODEL EU SIGNED

Simulation using Building Information Modeling Methodology of Multimodal, Multipurpose and Multiproduct Freight Railway Terminals Infrastructures.

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

Project "INTERMODEL EU" data sheet

The following table provides information about the project.

Coordinator
IDP INGENIERIA Y ARQUITECTURA IBERIA SL 

Organization address
address: AVENIDA FRANCESC MACIA 60 3 PLANTA
city: SABADELL BARCELONA
postcode: 8208
website: www.idp.es

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Spain [ES]
 Project website http://www.intermodeleu.eu
 Total cost 2˙999˙547 €
 EC max contribution 2˙999˙547 € (100%)
 Programme 1. H2020-EU.3.4. (SOCIETAL CHALLENGES - Smart, Green And Integrated Transport)
 Code Call H2020-MG-2015_TwoStages
 Funding Scheme RIA
 Starting year 2016
 Duration (year-month-day) from 2016-09-01   to  2019-08-31

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    IDP INGENIERIA Y ARQUITECTURA IBERIA SL ES (SABADELL BARCELONA) coordinator 635˙875.00
2    MACOMI BV NL (DEN HOORN) participant 436˙715.00
3    Teknologian tutkimuskeskus VTT Oy FI (Espoo) participant 350˙000.00
4    CENTRE INTERNACIONAL DE METODES NUMERICS EN ENGINYERIA ES (BARCELONA) participant 296˙443.00
5    VIASYS VDC OY FI (ESPOO) participant 242˙500.00
6    VIAS Y CONSTRUCCIONES SA ES (MADRID) participant 190˙862.00
7    CONTSHIP ITALIA SPA IT (MELZO) participant 173˙662.00
8    BASF CONSTRUCTION CHEMICALS ESPANA SL ES (HOSPITALET DE LLOBREGAT L) participant 169˙500.00
9    AUTORITA DI SISTEMA PORTUALE DEL MAR LIGURE ORIENTALE IT (LA SPEZIA) participant 109˙265.00
10    KIRUNA WAGON AB SE (KIRUNA) participant 90˙562.00
11    ZARZAD NADBALTYCKICH INICJATYW KLASTROWYCH SPOLKA Z OGRANICZONA ODPOWIEDZIALNOSCIA PL (GDANSK) participant 82˙042.00
12    Ferrocarrils de la Generalitat de Catalunya ES (Barcelona) participant 81˙900.00
13    BEDESCHI SPA IT (LIMENA) participant 81˙562.00
14    DHL FREIGHT GERMANY HOLDING GMBH DE (DUSSELDORF) participant 58˙656.00
15    AUTORITA' PORTUALE DELLA SPEZIA IT (LA SPEZIA) participant 0.00
16    CONSORCI CENTRE D'INNOVACIO DEL TRANSPORT ES (BARCELONA) participant 0.00

Map

 Project objective

The main objective of this Project is the development of a methodology and ICT tools which will allow an advanced simulation of intermodal railway logistics platforms models in order to support tasks related to both design and planning phases.

Using the combination of demand/economic/capacity models as main inputs, an evaluation of scenarios will be possible by means of the comparison of an underlying Building Information Modeling output composed of different data sets such as CAPEX, OPEX or energy efficiency.

Moreover, using these new design tool an improvement of the QOS and boost transhipment operations between rail and road transport will be achieved.

Above BIM2Operate translate and demonstrate the benefits of BIM during the operational phase, the tools can be extended with a specific simulator to get other indicators about the performance of the operations. The scope of this proposal addresses two of a maximum of five aspects expected by the European Commission:

- Development of whole system planning environments (based e.g. on virtual design concepts such as BIM - Building Information Modeling) to support the streamlined delivery of infrastructure projects from concept to deployment. In this respect, the rail sector deserves particular attention. - Solutions for advanced infrastructure capacity planning and modeling for all transport modes.

 Deliverables

List of deliverables.
Final dissemination brochure completed and available for distribution Websites, patent fillings, videos etc. 2020-04-09 10:31:51
Summary of results of work packages 2-7 and implications. Recommendations for new and to be renewed intermodal terminals (functional, economic, and environmental perspective). (Month 8) Documents, reports 2020-04-09 10:31:51
Communication Plan 6 Documents, reports 2020-04-09 10:31:51
Non-confidential project report for further public dissemination. Websites, patent fillings, videos etc. 2020-04-09 10:31:51
Assessment of rail interconnection resilience Documents, reports 2020-04-09 10:31:51
Conference paper 4: Logistics Congress in Darmstadt ICPLT 2019 Documents, reports 2020-04-09 10:31:51
Assessment of the rail interconnection pilot cases Documents, reports 2020-04-09 10:31:51
Assessment and validation workshops onsite at selected terminals with local specialists Documents, reports 2020-04-09 10:31:51
Set of Key Performance Indicators for assessing and operating intermodal terminals (functional, economic and environmental perspective) Documents, reports 2020-04-09 10:31:51
Internal Progress report prepared and ready for revision in the INTERMODEL General Assembly meeting 3 Documents, reports 2020-04-09 10:31:50
Assessment (meta study) of current transportation and logistics studies and trade statistics Documents, reports 2020-04-09 10:31:50
Data Management plan 1 Documents, reports 2020-04-09 10:31:50
BIM Execution Plan Guideline Documents, reports 2020-04-09 10:31:51
Risk and contingency plan. Month 6. Updated every six months. 1 Documents, reports 2020-04-09 10:31:50
Operational simulation simulation model of the second real-life case. Demonstrators, pilots, prototypes 2020-04-09 10:31:50
External mobility simulation model Demonstrators, pilots, prototypes 2020-04-09 10:31:50
Risk and contingency plan. Month 6. Updated every six months. 3 Documents, reports 2020-04-09 10:31:50
BIM model Demonstration of both real locations Demonstrators, pilots, prototypes 2020-04-09 10:31:50
Operational simulation simulation model of the first real-life case. Demonstrators, pilots, prototypes 2020-04-09 10:31:50
Communication Plan 5 Documents, reports 2020-04-09 10:31:50
Risk and contingency plan. Month 6. Updated every six months. 4 Documents, reports 2020-04-09 10:31:50
Conference paper 1: Integrated planning environment in terminal projects Documents, reports 2020-04-09 10:31:50
Integrated planning environment architecture Documents, reports 2020-04-09 10:31:51
Data Management plan 2 Documents, reports 2020-04-09 10:31:50
Website and intranet Websites, patent fillings, videos etc. 2020-04-09 10:31:50
Risk and contingency plan. Month 6. Updated every six months. 2 Documents, reports 2020-04-09 10:31:51
Definition and description of functional, economic and environmental analysis. Documents, reports 2020-04-09 10:31:50
Risk and contingency plan. Month 6. Updated every six months. 5 Documents, reports 2020-04-09 10:31:50
Requirements for terminal projects Documents, reports 2020-04-09 10:31:51
Communication Plan 2 Documents, reports 2020-04-09 10:31:50
Communication Plan 3 Documents, reports 2020-04-09 10:31:50
Study of the state of the art and description of KPI and KRI of terminals, hinterland mobility and rail network Documents, reports 2020-04-09 10:31:50
Internal Progress report prepared and ready for revision in the INTERMODEL General Assembly meeting 2 Documents, reports 2020-04-09 10:31:50
Internal Progress report prepared and ready for revision in the INTERMODEL General Assembly meeting 1 Documents, reports 2020-04-09 10:31:50
Electronic project brochure completed and available for distribution Websites, patent fillings, videos etc. 2020-04-09 10:31:50
Communication Plan 1 Documents, reports 2020-04-09 10:31:51
Conference paper 3: Key Performance Indicators for intermodal freight terminals. Documents, reports 2020-04-09 10:31:50
Communication Plan 4 Documents, reports 2020-04-09 10:31:50
Conference paper 2: Decision support for owners of terminal projects (VTT; WP1; M26) Websites, patent fillings, videos etc. 2020-04-09 10:31:50

Take a look to the deliverables list in detail:  detailed list of INTERMODEL EU deliverables.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "INTERMODEL EU" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "INTERMODEL EU" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.4.)

GREAT (2020)

Greener Air Traffic Operations

Read More  

DTEU (2018)

Decarbonising Transport in Europe

Read More  

ALTERNATE (2020)

ASSESSMENT ON ALTERNATIVE AVIATION FUELS DEVELOPMENT

Read More