Explore the words cloud of the INTERMODEL EU project. It provides you a very rough idea of what is the project "INTERMODEL EU" about.
The following table provides information about the project.
Coordinator |
IDP INGENIERIA Y ARQUITECTURA IBERIA SL
Organization address contact info |
Coordinator Country | Spain [ES] |
Project website | http://www.intermodeleu.eu |
Total cost | 2˙999˙547 € |
EC max contribution | 2˙999˙547 € (100%) |
Programme |
1. H2020-EU.3.4. (SOCIETAL CHALLENGES - Smart, Green And Integrated Transport) |
Code Call | H2020-MG-2015_TwoStages |
Funding Scheme | RIA |
Starting year | 2016 |
Duration (year-month-day) | from 2016-09-01 to 2019-08-31 |
Take a look of project's partnership.
The main objective of this Project is the development of a methodology and ICT tools which will allow an advanced simulation of intermodal railway logistics platforms models in order to support tasks related to both design and planning phases.
Using the combination of demand/economic/capacity models as main inputs, an evaluation of scenarios will be possible by means of the comparison of an underlying Building Information Modeling output composed of different data sets such as CAPEX, OPEX or energy efficiency.
Moreover, using these new design tool an improvement of the QOS and boost transhipment operations between rail and road transport will be achieved.
Above BIM2Operate translate and demonstrate the benefits of BIM during the operational phase, the tools can be extended with a specific simulator to get other indicators about the performance of the operations. The scope of this proposal addresses two of a maximum of five aspects expected by the European Commission:
- Development of whole system planning environments (based e.g. on virtual design concepts such as BIM - Building Information Modeling) to support the streamlined delivery of infrastructure projects from concept to deployment. In this respect, the rail sector deserves particular attention. - Solutions for advanced infrastructure capacity planning and modeling for all transport modes.
Final dissemination brochure completed and available for distribution | Websites, patent fillings, videos etc. | 2020-04-09 10:31:51 |
Summary of results of work packages 2-7 and implications. Recommendations for new and to be renewed intermodal terminals (functional, economic, and environmental perspective). (Month 8) | Documents, reports | 2020-04-09 10:31:51 |
Communication Plan 6 | Documents, reports | 2020-04-09 10:31:51 |
Non-confidential project report for further public dissemination. | Websites, patent fillings, videos etc. | 2020-04-09 10:31:51 |
Assessment of rail interconnection resilience | Documents, reports | 2020-04-09 10:31:51 |
Conference paper 4: Logistics Congress in Darmstadt ICPLT 2019 | Documents, reports | 2020-04-09 10:31:51 |
Assessment of the rail interconnection pilot cases | Documents, reports | 2020-04-09 10:31:51 |
Assessment and validation workshops onsite at selected terminals with local specialists | Documents, reports | 2020-04-09 10:31:51 |
Set of Key Performance Indicators for assessing and operating intermodal terminals (functional, economic and environmental perspective) | Documents, reports | 2020-04-09 10:31:51 |
Internal Progress report prepared and ready for revision in the INTERMODEL General Assembly meeting 3 | Documents, reports | 2020-04-09 10:31:50 |
Assessment (meta study) of current transportation and logistics studies and trade statistics | Documents, reports | 2020-04-09 10:31:50 |
Data Management plan 1 | Documents, reports | 2020-04-09 10:31:50 |
BIM Execution Plan Guideline | Documents, reports | 2020-04-09 10:31:51 |
Risk and contingency plan. Month 6. Updated every six months. 1 | Documents, reports | 2020-04-09 10:31:50 |
Operational simulation simulation model of the second real-life case. | Demonstrators, pilots, prototypes | 2020-04-09 10:31:50 |
External mobility simulation model | Demonstrators, pilots, prototypes | 2020-04-09 10:31:50 |
Risk and contingency plan. Month 6. Updated every six months. 3 | Documents, reports | 2020-04-09 10:31:50 |
BIM model Demonstration of both real locations | Demonstrators, pilots, prototypes | 2020-04-09 10:31:50 |
Operational simulation simulation model of the first real-life case. | Demonstrators, pilots, prototypes | 2020-04-09 10:31:50 |
Communication Plan 5 | Documents, reports | 2020-04-09 10:31:50 |
Risk and contingency plan. Month 6. Updated every six months. 4 | Documents, reports | 2020-04-09 10:31:50 |
Conference paper 1: Integrated planning environment in terminal projects | Documents, reports | 2020-04-09 10:31:50 |
Integrated planning environment architecture | Documents, reports | 2020-04-09 10:31:51 |
Data Management plan 2 | Documents, reports | 2020-04-09 10:31:50 |
Website and intranet | Websites, patent fillings, videos etc. | 2020-04-09 10:31:50 |
Risk and contingency plan. Month 6. Updated every six months. 2 | Documents, reports | 2020-04-09 10:31:51 |
Definition and description of functional, economic and environmental analysis. | Documents, reports | 2020-04-09 10:31:50 |
Risk and contingency plan. Month 6. Updated every six months. 5 | Documents, reports | 2020-04-09 10:31:50 |
Requirements for terminal projects | Documents, reports | 2020-04-09 10:31:51 |
Communication Plan 2 | Documents, reports | 2020-04-09 10:31:50 |
Communication Plan 3 | Documents, reports | 2020-04-09 10:31:50 |
Study of the state of the art and description of KPI and KRI of terminals, hinterland mobility and rail network | Documents, reports | 2020-04-09 10:31:50 |
Internal Progress report prepared and ready for revision in the INTERMODEL General Assembly meeting 2 | Documents, reports | 2020-04-09 10:31:50 |
Internal Progress report prepared and ready for revision in the INTERMODEL General Assembly meeting 1 | Documents, reports | 2020-04-09 10:31:50 |
Electronic project brochure completed and available for distribution | Websites, patent fillings, videos etc. | 2020-04-09 10:31:50 |
Communication Plan 1 | Documents, reports | 2020-04-09 10:31:51 |
Conference paper 3: Key Performance Indicators for intermodal freight terminals. | Documents, reports | 2020-04-09 10:31:50 |
Communication Plan 4 | Documents, reports | 2020-04-09 10:31:50 |
Conference paper 2: Decision support for owners of terminal projects (VTT; WP1; M26) | Websites, patent fillings, videos etc. | 2020-04-09 10:31:50 |
Take a look to the deliverables list in detail: detailed list of INTERMODEL EU deliverables.
Are you the coordinator (or a participant) of this project? Plaese send me more information about the "INTERMODEL EU" project.
For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.
Send me an email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.
Thanks. And then put a link of this page into your project's website.
The information about "INTERMODEL EU" are provided by the European Opendata Portal: CORDIS opendata.