The page lists 22 deliverables related to the research project "ELY4OFF".
title and desprition | type | last update |
---|---|---|
Implementation roadmapConsidering the target markets studied in Task 6.3 and the experiences and aspects seen in the specific business cases developed in Task 6.5, an implementation plan for electrolysers integrated with RES in off-grid installations will be delivered in this task. The plan will set possible scenarios for 2020, 2030 and 2050 for penetration of off-grid RES installations with electrolysers and the measures to achieve them. Programme: H2020-EU.3.3.8.2. - Topic(s): FCH-02.1-2015 |
Websites, patent fillings, videos etc. | 2020-02-12 |
Final report on dissemination activities and materialsFinal report on dissemination activities and materials Programme: H2020-EU.3.3.8.2. - Topic(s): FCH-02.1-2015 |
Documents, reports | 2020-02-12 |
Final project report (technical and financial)Final project report Programme: H2020-EU.3.3.8.2. - Topic(s): FCH-02.1-2015 |
Documents, reports | 2020-02-12 |
Analysis of demonstration phase resultsIf negative deviations are detected during the demonstration testing plan, meaning that the performance is not as good as expected, an intensive phase of analysis will be carried out for every member of the developed solution, in order to detect the potential effect in the expected deployment of the technology. In case of obtaining better results than predicted, a similar study will be carried out in order to position the technology with respect to its contribution with MAWP KPIs and to be compared against competitors (including other storage technologies and off-grid solutions) Programme: H2020-EU.3.3.8.2. - Topic(s): FCH-02.1-2015 |
Documents, reports | 2020-02-12 |
LCA, CAPEX, OPEX assessmentLCA analysis will evaluate each component of the ELY4OFF system regarding material composition, production processes, supply of energy, waste management and recycling of the unit components, including evaluation of tie-up time of materials resources in the society and system overall energetic efficiency. Programme: H2020-EU.3.3.8.2. - Topic(s): FCH-02.1-2015 |
Documents, reports | 2020-02-12 |
Midterm project report (technical and financial)Midterm project report (technical and financial) Programme: H2020-EU.3.3.8.2. - Topic(s): FCH-02.1-2015 |
Documents, reports | 2019-10-15 |
Assessment of market potentialA sensitivity analysis will be conducted to determine the robustness of the market opportunities and its susceptibility to change. Another very important aspect of future implementation is the level of perceived risks by potential investors. In this study the main risks of the new components and systems developed will be investigated and communicated at an early stage to the Consortium. Programme: H2020-EU.3.3.8.2. - Topic(s): FCH-02.1-2015 |
Websites, patent fillings, videos etc. | 2019-10-15 |
RCS analysis at EU and international levelAn extensive literature search will complete the previous study, covering regulations at European and international level. In a first approach, pertinent regulations codes and standards will be identified at European level, but also some specific national requirements will be studied for European countries where off-grid applications are envisioned to be related to niche markets. Programme: H2020-EU.3.3.8.2. - Topic(s): FCH-02.1-2015 |
Documents, reports | 2019-10-15 |
First strategy plan for commercial exploitation of the resultsThe exploitation of the results will receive continuous attention throughout the project. Programme: H2020-EU.3.3.8.2. - Topic(s): FCH-02.1-2015 |
Documents, reports | 2019-10-15 |
Update 2 of dissemination and awareness planUpdate 2 of dissemination and awareness plan Programme: H2020-EU.3.3.8.2. - Topic(s): FCH-02.1-2015 |
Documents, reports | 2019-10-15 |
Second report (technical and financial)Second project report (technical and financial) Programme: H2020-EU.3.3.8.2. - Topic(s): FCH-02.1-2015 |
Documents, reports | 2019-10-15 |
Indicators and test definitionA complete study will be carried out to define how to ensure compliance with the objectives to be met, at every subsystem level. The indicators will be also related with the study of RCS, when parameters or characteristics to be complied with are found in the specific case study of these codes. Programme: H2020-EU.3.3.8.2. - Topic(s): FCH-02.1-2015 |
Documents, reports | 2019-10-15 |
Guidelines and recommendations to overcome RCS barriersDifferent possibilities will be studied, considering as a basis: inputs on RCS aspects detected in task 2.1, incentives to cover CAPEX and operational costs and/or rewards for GHG and CO2 emissions savings and exploring other options. Since off-grid RES installations with electrolysers avoid the cost of upgrading existing grids or creating new ones, economically feasible incentives will be proposed. Programme: H2020-EU.3.3.8.2. - Topic(s): FCH-02.1-2015 |
Documents, reports | 2019-10-15 |
Quality Management PlanProject Consortium is deeply committed on assuring high quality results. In order to achieve these high standards, a Quality Management Plan will be developed in order to define role and responsibilities to ensure them. Programme: H2020-EU.3.3.8.2. - Topic(s): FCH-02.1-2015 |
Documents, reports | 2019-10-15 |
Benchmarking or energy storage technologies for RES offgrid installationsThis deliverable will serve as a decision making input to detect when water electrolysers are really more competitive than other technologies and, hence, they must be implemented. Programme: H2020-EU.3.3.8.2. - Topic(s): FCH-02.1-2015 |
Documents, reports | 2019-10-15 |
Dissemination and awareness planA visual identity will be developed for the project comprising a logo styled in different formats, in line with the H2020 visual guidelines. Document templates (Deliverable, Minutes, Agenda, Power point presentation) will be developed. A press kit will be drafted and provided to the partners in M6. The press kit will include tweetable facts, FAQ’s, summary presentations, pictures and other publication material. Programme: H2020-EU.3.3.8.2. - Topic(s): FCH-02.1-2015 |
Documents, reports | 2019-10-15 |
Update 1 of dissemination and awareness planUpdate 1 of dissemination and awareness plan Programme: H2020-EU.3.3.8.2. - Topic(s): FCH-02.1-2015 |
Documents, reports | 2019-10-15 |
Development of subsystems for off-grid integrationThe focus in this deliverable will reside on developing systems able to be integrated with the main electrolysis system from WP3 and the existing equipment for the demonstrative testing in FHA facilities. Programme: H2020-EU.3.3.8.2. - Topic(s): FCH-02.1-2015 |
Documents, reports | 2019-10-15 |
First assessment on monitor and model: alignment with requirements and objectivesA continued monitoring of the specific technical developments will be carried out in this deliverable, which will consist in following the correct implementation of the previous work developed in WP2 during first 14 months. Programme: H2020-EU.3.3.8.2. - Topic(s): FCH-02.1-2015 |
Documents, reports | 2019-10-15 |
First version of new business model for electrolysers in offgrid installationsFirst version of new business model for electrolysers in offgrid Programme: H2020-EU.3.3.8.2. - Topic(s): FCH-02.1-2015 |
Documents, reports | 2019-10-15 |
Objectives at system and subsystem levelThe aim of this task is to put in common the incremental efforts to be carried out at each subsystem to achieve the goals of the overall system Programme: H2020-EU.3.3.8.2. - Topic(s): FCH-02.1-2015 |
Documents, reports | 2019-10-15 |
ELY4OFF websiteThe website has the following functions: Programme: H2020-EU.3.3.8.2. - Topic(s): FCH-02.1-2015 |
Websites, patent fillings, videos etc. | 2019-10-15 |