Opendata, web and dolomites

Lt-AD SIGNED

Low-temperature Anaerobic Digestion treatment of low-strength wastewaters

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 Lt-AD project word cloud

Explore the words cloud of the Lt-AD project. It provides you a very rough idea of what is the project "Lt-AD" about.

ahead    176    367    energy    annual    hugely    negligible    promotional    49    operation    assets    aeration    industrial    reuse    months    125    100    demonstrator    reliant    temperature    recirculation    period    heat    treats    thermal    deg    lt    sludge    relationship    solution    ip    revenue    yields    environmental    strength    market    drinks    commercialisation    alone    risk    uwwd    aerobic    ambient    produces    mg    biogas    billion    conventional    12    fuels    106    install    litres    emissions    milk    latter    ww    temperatures    resale    food    successfully    no    post    cod    channel    rate    anaerobic    digestion    unsustainable    volumes    producing    savings    opex    effluent    374    protection    directive    wastewater    plant    dairy    standard    m3    provides    sectors    site    greenhouse    etv    ad    nvp    generates    data    materials    lowered    20    fossil    footprint    input    rhi    gas    payback    compact    first    urban    business    day    annually    treatment    662    ghg    conjunction    gain   

Project "Lt-AD" data sheet

The following table provides information about the project.

Coordinator
NVP ENERGY LIMITED 

Organization address
address: POST BOX 4, BLOCK 4, MARLINSTOWN OFFICE PARK, DUBLIN ROAD
city: MULLINGAR, CO. WESTMEATH
postcode: n.a.
website: n.a.

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Ireland [IE]
 Project website http://www.lowtemp-ad.eu
 Total cost 2˙418˙815 €
 EC max contribution 1˙693˙170 € (70%)
 Programme 1. H2020-EU.3.5. (SOCIETAL CHALLENGES - Climate action, Environment, Resource Efficiency and Raw Materials)
2. H2020-EU.2.3.1. (Mainstreaming SME support, especially through a dedicated instrument)
 Code Call H2020-SMEINST-2-2015
 Funding Scheme SME-2
 Starting year 2016
 Duration (year-month-day) from 2016-06-01   to  2018-05-31

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    NVP ENERGY LIMITED IE (MULLINGAR, CO. WESTMEATH) coordinator 1˙014˙223.00
2    HYDRO INTERNATIONAL LIMITED IE (NAVAN) participant 495˙653.00
3    J.K. FABRICATIONS LIMITED UK (NEWRY DOWN) participant 183˙293.00

Map

 Project objective

No need for heat! NVP Energy presents the first to market, high-rate AD technology that successfully treats low strength wastewater (WW) at ambient temperatures (4 - 20°C). The low-temperature anaerobic digestion (Lt-AD) process provides a novel solution to Food and Drinks industrial sectors which produce large volumes of WW. The European milk treatment and processing sector alone generates over 367 billion litres annually which is typically treated using conventional aerobic processes. The latter treatment process is unsustainable. It results in high sludge yields, requires a large footprint on-site and is hugely reliant on fossil fuels for aeration. The Lt-AD technology produces negligible sludge volumes, presents a compact design, requires no heat input or biogas recirculation, and produces effluent of urban wastewater directive (UWWD) standard (< 125 mg/L COD) without post-aeration. Comparing Lt-AD to conventional aerobic treatment of WW from a typical dairy processing plant producing 2,000 m3 WW per day, Lt-AD can provide annual OPEX savings of €1,662,106 p.a over a payback period of 2.49 years that includes RHI revenue of €374,176. The low temperature operation of Lt-AD allows for 100% of the biogas produced being available for reuse or resale. Lt-AD also has a high impact on environmental savings through reduced greenhouse gas (GHG) emissions and lowered thermal energy and fossil fuels requirements. This Phase 2 project will allow NVP Energy install and commission a demonstrator plant and gain 8-12 months operational data. The results obtained, in conjunction with ETV assessment, will build the business case for each targeted market channel ahead of commercialisation. Other key project objectives include: commercialisation partner relationship development; promotional materials development; exploitation planned; assessment and protection of IP assets and project risk management.

 Deliverables

List of deliverables.
Lt-AD operation simulation model Other 2019-05-31 18:17:52
Process maps for relevant standards Other 2019-05-31 18:17:51
Project website Demonstrators, pilots, prototypes 2019-05-31 18:17:47

Take a look to the deliverables list in detail:  detailed list of Lt-AD deliverables.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "LT-AD" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "LT-AD" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.5.;H2020-EU.2.3.1.)

EPIC (2017)

Environmentally Friendly Recycled Plastic Floors in Containers

Read More  

CleanCoat (2017)

Development of eco-friendly architectural coil coatings for clean buildings and pollution-free air

Read More  

PBTech (2016)

Combined Plasma Biotrickling system for treating industrial VOC emissions

Read More