The page lists 21 deliverables related to the research project "ENOS".
title and desprition | type | last update |
---|---|---|
1st report on European links, liaison and knowledge exchangeTask 5.2 - The report will present the international cooperation and knowledge exchange activities undertaken within the ENOS project during the first project period (months 0-24). Programme: H2020-EU.3.3.2.3. - Topic(s): LCE-15-2015 |
Documents, reports | 2019-12-03 |
Benchmarking studies on deep samplingTask 1.3 - A report presenting the different geochemical monitoring techniques implemented at Hontomin to control the safety of CO2 storage Programme: H2020-EU.3.3.2.3. - Topic(s): LCE-15-2015 |
Documents, reports | 2019-12-03 |
Results of OpenForum n°2This deliverable is related to task T 7.3.2. The most important results of the annual Open Forum will be reported, distributed as a pdf file to all the Open Forum attendees and made available through the project website in the form of an interactive e-brochure. Programme: H2020-EU.3.3.2.3. - Topic(s): LCE-15-2015 |
Websites, patent fillings, videos etc. | 2019-12-03 |
ENOS Spring School 1 on CO2 storageTask 8.1 - Report on the training courses for young scientists on onshore CO2 geological storage and latest research, leasons learnt Programme: H2020-EU.3.3.2.3. - Topic(s): LCE-15-2015 |
Websites, patent fillings, videos etc. | 2019-12-03 |
Report on awareness raising course for journalists workshop and interactions with media – months 13-24Task 8.4 - Report on short courses for journalists and media, an on enhancing scientist-journalist communication, leasons learnt Programme: H2020-EU.3.3.2.3. - Topic(s): LCE-15-2015 |
Documents, reports | 2019-12-03 |
Short note summarizing knowledge integration workshop n°1Each knowledge integration workshop would be summirised with a short note presenting main theme, workshop participants and key outcomes. The workshops summary notes would be made available on the project website. Programme: H2020-EU.3.3.2.3. - Topic(s): LCE-15-2015 |
Documents, reports | 2019-12-03 |
Design & optimization of seismic monitoring network for induced seismicity managementThe report describes the reliability, accuracy and sensitivity of the existing seismic monitoring network at Hontomin based on a detailed performance assessment, which will be performed in Task 1.2.2 of WP1 (TNO and CIUDEN). The assessment consists of two stages: conventional calibration using the recorded microseimic events and a detailed finite element data simulation enabling comparsion with the actual data. A subsequent Value-of-Information analysis will provide the comparison of different monitoring layouts and recommendations for future monitoring strategies. Programme: H2020-EU.3.3.2.3. - Topic(s): LCE-15-2015 |
Documents, reports | 2019-12-03 |
Uncertainty Quantification of capacity estimates: coherent framework & applicationsTask 2.1 - Description of methods and a modelling strategy (framework) for uncertainty characterization (ranking of the different uncertainty sources (parametric, Programme: H2020-EU.3.3.2.3. - Topic(s): LCE-15-2015 |
Documents, reports | 2019-12-03 |
Annual publication summary report n°2Task 7.3 Programme: H2020-EU.3.3.2.3. - Topic(s): LCE-15-2015 |
Documents, reports | 2019-12-03 |
Newsletter 2An annual newsletter will promote ENOS’ progress (task 7.3.3) among the technical community, policy makers, regulators and the public. The newsletter will be made available in both an electronic format on ENOS website and in printed form to be distributed at special events. The contents, structure and format of the newsletter will be developed by the newsletters editor CO2GeoNet-TTUGI jointly with the Scientific Editors. Programme: H2020-EU.3.3.2.3. - Topic(s): LCE-15-2015 |
Websites, patent fillings, videos etc. | 2019-12-03 |
Assessment of leakage risk presented by old boreholes at onshore site (case study report) (T3.2.4)Task 3.2.4 Programme: H2020-EU.3.3.2.3. - Topic(s): LCE-15-2015 |
Documents, reports | 2019-12-03 |
Annual publication summary report n°1Task 7.3 Programme: H2020-EU.3.3.2.3. - Topic(s): LCE-15-2015 |
Documents, reports | 2019-12-03 |
Report on installation, with constantly updated data and threshold assessmentsTwo monitoring stations will be installed at key sites in Hontomin (close to observation wells), a third as reference site. Data will be cross-referenced against each other. Based on the detected annual/diurnal/other natural variations at the reference site, site specific threshold values of soil gas concentration changes will defined and reported. Programme: H2020-EU.3.3.2.3. - Topic(s): LCE-15-2015 |
Documents, reports | 2019-12-03 |
Presentation of the project’s technical content in lay termsThis deliverable relates to task 5.1.1. It will consist of a report or alternatively of another suitable instrument (for instance fact sheets, posters or a video) that allows facilitated communication of the scientific content of the project. It will illustrate the technical themes and technologies that ENOS aims to develop in terms as much as possible understandable for local population participants and in a form that is functional for the activities to be undertaken with them in task 2. Programme: H2020-EU.3.3.2.3. - Topic(s): LCE-15-2015 |
Documents, reports | 2019-12-03 |
Report on awareness raising course for journalists workshop and interactions with media – months 1-12Task 8.4 - Report on short courses for journalists and media, an on enhancing scientist-journalist communication, leason learnt Programme: H2020-EU.3.3.2.3. - Topic(s): LCE-15-2015 |
Documents, reports | 2019-12-03 |
Results of OpenForum n°1The report from the 2016 open forum would be made available on specialised and ENOS web site as soon as the web platform is establishes. Programme: H2020-EU.3.3.2.3. - Topic(s): LCE-15-2015 |
Websites, patent fillings, videos etc. | 2019-12-03 |
E-book: Regulatory and social aspects of CCS technologyTask 8.2 - Report on the experiences on e-learnings courses for students and the civil society, leasons learnt, and provision of e-learning materials on a web platform Programme: H2020-EU.3.3.2.3. - Topic(s): LCE-15-2015 |
Websites, patent fillings, videos etc. | 2019-12-03 |
Web-platformThe web platform including both internal (aimed at data and knowledge exchange for project partners) and external (aimed at dessimination and general public) should be established and filled in with general project information Programme: H2020-EU.3.3.2.3. - Topic(s): LCE-15-2015 |
Websites, patent fillings, videos etc. | 2019-12-03 |
Newsletter 1An annual newsletter will promote ENOS’ progress (task 7.3.3) among the technical community, policy makers, regulators and the public. The newsletter will be made available in both an electronic format on ENOS website and in printed form to be distributed at special events. The contents, structure and format of the newsletter will be developed by the newsletters editor CO2GeoNet-TTUGI jointly with the Scientific Editors. Programme: H2020-EU.3.3.2.3. - Topic(s): LCE-15-2015 |
Websites, patent fillings, videos etc. | 2019-12-03 |
E-book: Geoscience applied to geological storage of CO2Task 8.2 - Report on the experiences on e-learnings course for students and the civil society, leasons learnt, and provision of e-learning materials on a web platform Programme: H2020-EU.3.3.2.3. - Topic(s): LCE-15-2015 |
Websites, patent fillings, videos etc. | 2019-12-03 |
E-book: Climate change and importance of CCS technology for decarbonisation of energy and industryTask 8.2 - Report on the first experiences on e-learnings course for students and the civil society, and provision of e-learning materials on a web platform Programme: H2020-EU.3.3.2.3. - Topic(s): LCE-15-2015 |
Websites, patent fillings, videos etc. | 2019-12-03 |