Explore the words cloud of the ForZDM project. It provides you a very rough idea of what is the project "ForZDM" about.
The following table provides information about the project.
Coordinator |
GKN AEROSPACE NORWAY AS
Organization address contact info |
Coordinator Country | Norway [NO] |
Project website | http://www.forzdmproject.eu/ |
Total cost | 7˙566˙108 € |
EC max contribution | 5˙896˙860 € (78%) |
Programme |
1. H2020-EU.2.1.5.1. (Technologies for Factories of the Future) |
Code Call | H2020-FOF-2016 |
Funding Scheme | IA |
Starting year | 2016 |
Duration (year-month-day) | from 2016-10-01 to 2020-09-30 |
Take a look of project's partnership.
# | ||||
---|---|---|---|---|
1 | GKN AEROSPACE NORWAY AS | NO (KONGSBERG) | coordinator | 846˙781.00 |
2 | POLITECNICO DI MILANO | IT (MILANO) | participant | 617˙000.00 |
3 | FUNDACION TECNALIA RESEARCH & INNOVATION | ES (DERIO BIZKAIA) | participant | 492˙210.00 |
4 | IDEKO S COOP | ES (ELGOIBAR) | participant | 463˙900.00 |
5 | NXTCONTROL GMBH | AT (LEOBERSDROF) | participant | 455˙000.00 |
6 | UNIVERSITAET STUTTGART | DE (STUTTGART) | participant | 439˙750.00 |
7 | ENKI SRL | IT (CONCESIO BRESCIA) | participant | 399˙434.00 |
8 | MARPOSS SOCIETA PER AZIONI | IT (BENTIVOGLIO) | participant | 390˙040.00 |
9 | ENGINSOFT NORDIC AB | SE (LUND) | participant | 389˙068.00 |
10 | MASMEC SPA | IT (MODUGNO) | participant | 363˙868.00 |
11 | ABF-INDUSTRIELLE AUTOMATION GMBH | AT (LINZ) | participant | 361˙971.00 |
12 | MONTRONIX GMBH | DE (OBERSTENFELD) | participant | 340˙952.00 |
13 | Construcciones y Auxiliar de Ferrocarriles, S.A. | ES (Beasain) | participant | 336˙883.00 |
14 | Marposs SpA | IT (Bentivoglio) | participant | 0.00 |
'Manufacturing companies are continuously facing the challenge of operating their manufacturing processes and systems in order to deliver the required production rates of high quality products of increasing complexity, with limited use and waste of resources. 'Zero Defect Manufacturing' (ZDM) is a recent paradigm aiming at going beyond traditional six-sigma approaches in highly technology intensive and strategic European manufacturing sectors through new knowledge-based approaches. The ZDM paradigm is of key importance to manage production quality targets in advanced manufacturing industries. The implementation of this paradigm in industry requires innovative defect management and control methods, novel technologies for in-line inspection and integration of knowledge management and ICT tools for smart and sustainable decisions in complex industrial scenarios, which are not available in the market. The aim of the ForZDM project is to develop and demonstrate tools to support the rapid deployment of ZDM solutions in industry and design more competitive and robust multi-stage manufacturing systems. The proposed ZDM approach is based on the combined adoption of new knowledge-based data-gathering and root-cause analysis solutions to reduce the generation of defects as well as new on-line defect management and improved production traceability solutions to mitigate the propagation of defects along the production line stages. This will be achieved through the proper integration of innovative enabling technologies, such as cyber-physical systems, selective inspection, advanced analytics and integrated process and part-flow control solutions.'
Sensitivity analysis tool | Other | 2020-02-07 14:02:41 |
Product variation models | Other | 2020-02-07 14:02:39 |
Critical process models | Other | 2020-02-07 14:02:10 |
Project website | Websites, patent fillings, videos etc. | 2019-05-30 16:51:08 |
Take a look to the deliverables list in detail: detailed list of ForZDM deliverables.
year | authors and title | journal | last update |
---|---|---|---|
2019 |
Colin Reiff, Florian Eger, Philipp Tempel, Maria Chiara Magnanini, Jon Ander Ortiz, Marcello Colledani, Alexander Verl, Iñigo Sarries Smart centering for rotation-symmetric parts in multi-stage production systems for zero-defect manufacturing published pages: 27-32, ISSN: 2212-8271, DOI: 10.1016/j.procir.2019.02.006 |
Procedia CIRP 79 | 2019-12-16 |
2018 |
Florian Eger, Colin Reiff, Bernd Brantl, Marcello Colledani, Alexander Verl Correlation analysis methods in multi-stage production systems for reaching zero-defect manufacturing published pages: 635-640, ISSN: 2212-8271, DOI: 10.1016/j.procir.2018.03.163 |
Procedia CIRP 72 | 2019-12-16 |
2018 |
Florian Eger, Daniel Coupek, Davide Caputo, Marcello Colledani, Mariluz Penalva, Jon Ander Ortiz, Hermann Freiberger, Gernot Kollegger Zero Defect Manufacturing Strategies for Reduction of Scrap and Inspection Effort in Multi-stage Production Systems published pages: 368-373, ISSN: 2212-8271, DOI: 10.1016/j.procir.2017.12.228 |
Procedia CIRP 67 | 2019-06-12 |
Are you the coordinator (or a participant) of this project? Plaese send me more information about the "FORZDM" project.
For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.
Send me an email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.
Thanks. And then put a link of this page into your project's website.
The information about "FORZDM" are provided by the European Opendata Portal: CORDIS opendata.