Explore the words cloud of the IMPACT-1 project. It provides you a very rough idea of what is the project "IMPACT-1" about.
The following table provides information about the project.
Coordinator |
DEUTSCHES ZENTRUM FUER LUFT - UND RAUMFAHRT EV
Organization address contact info |
Coordinator Country | Germany [DE] |
Total cost | 299˙951 € |
EC max contribution | 299˙951 € (100%) |
Programme |
1. H2020-EU.3.4.8.6. (Cross-cutting themes and activities (CCA)) |
Code Call | H2020-S2RJU-CFM-2015-01-1 |
Funding Scheme | Shift2Rail-RIA |
Starting year | 2016 |
Duration (year-month-day) | from 2016-09-01 to 2018-04-30 |
Take a look of project's partnership.
# | ||||
---|---|---|---|---|
1 | DEUTSCHES ZENTRUM FUER LUFT - UND RAUMFAHRT EV | DE (KOELN) | coordinator | 76˙437.00 |
2 | TRAFIKVERKET - TRV | SE (BORLANGE) | participant | 92˙435.00 |
3 | DEUTSCHE BAHN AG | DE (BERLIN) | participant | 55˙550.00 |
4 | SIEMENS AKTIENGESELLSCHAFT | DE (MUNCHEN) | participant | 24˙442.00 |
5 | BOMBARDIER TRANSPORTATION UK LTD | UK (DERBY) | participant | 22˙220.00 |
6 | Construcciones y Auxiliar de Ferrocarriles, S.A. | ES (Beasain) | participant | 15˙554.00 |
7 | HITACHI RAIL STS SPA | IT (GENOVA) | participant | 13˙312.00 |
This Project will start the activities of Shift²Rail members related to the cross-cutting activities. The work Areas socio-economic aspects (WA1) and KPI Monitoring (WA2) as defined in the multi-annual action plan will start. The System Plattform Demonstrator Scenarios will be desigend in a first issue. The objectives of this proposal IMPACT-1 are: - Evaluating the effects for mobility, society and environment induced by new technology solutions and developments, - Introducing relevant targets and needs to create a more attractive, a more competitive and more sustainable rail system - Defining System Platform Demonstrators (SPD) that represent future application use cases - Defining Key Performance Indicators (KPIs) that enable the monitoring and assessment of the Shift2Rail overall target achievement. These objectives will be reached by performing a socio-economic impact analysis. Using these results scenarios for the System Platform Demonstrators are described with respect to the railway of the future for highspeed, regional, urban and freight transport. These scenarios are used to monitor the results of the other Shift2Rail projects using a mode of the KPIs. The model of the KPI shows the relation of the low-level KPI to the overall targets defined in the S2R Master Plan. The project IMPACT-1 is planned to fulfil the respective topic of the Shift2Rail Annual Work Plan 2015.
Reference Scenario | Documents, reports | 2020-02-27 15:24:36 |
Take a look to the deliverables list in detail: detailed list of IMPACT-1 deliverables.
year | authors and title | journal | last update |
---|---|---|---|
2018 |
Michael Meyer zu Hörste, Florian Brinkmann and Mats Berg Impact of Shift2Rail - a KPI model for the entire railway system published pages: 50, ISSN: , DOI: |
Transport Research Arena 2018 Bi-annual | 2019-10-28 |
Are you the coordinator (or a participant) of this project? Plaese send me more information about the "IMPACT-1" project.
For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.
Send me an email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.
Thanks. And then put a link of this page into your project's website.
The information about "IMPACT-1" are provided by the European Opendata Portal: CORDIS opendata.