FR8RAIL project deliverables

The page lists 19 deliverables related to the research project "FR8RAIL".

 List of Deliverables

FR8RAIL: list of downloadable deliverables.
title and desprition type last update

Cost Benefit Analysis

Report describing the cost benefit analysis of the proposed concept in order to support the market uptake of the automatic coupler.

Programme: H2020-EU.3.4.8.5. - Topic(s): S2R-CFM-IP5-01-2015

download deliverable 

Documents, reports 2020-03-06

Migration plan

Report defining the migration plan to introduce the automatic couplers in the freight market.

Programme: H2020-EU.3.4.8.5. - Topic(s): S2R-CFM-IP5-01-2015

download deliverable 

Documents, reports 2020-03-06

Wayside condition monitoring impact analysis

This deliverable will focus on the identification of the most relevant wayside measurements for rail freight transportation, and their integration with data collected on-board, leading to the definition of relevant case studies.

Programme: H2020-EU.3.4.8.5. - Topic(s): S2R-CFM-IP5-01-2015

download deliverable 

Documents, reports 2020-02-27

Requirement Analysis and Technologies evaluation for train’s wireless backbone

Requirement Analysis and Technologies evaluation for train’s wireless backbone. Specification of requirements and operational conditions for application of wireless technologies on rolling stock compositions, including evaluation of suitable wireless communication technologies.

Programme: H2020-EU.3.4.8.5. - Topic(s): S2R-CFM-IP5-01-2015

download deliverable 

Documents, reports 2020-02-27

Detailed Running gear and wagon design concept

Report with a detailed description of the prioritised concept. Furthermore, the requirements based on the top level requirements from WP1 are described including e.g. needed research activities, missing technologies, etc. -> basis for the development of a technical demonstrator of the next generation Running Gear, Core Market Wagon and Extended Market Wagon

Programme: H2020-EU.3.4.8.5. - Topic(s): S2R-CFM-IP5-01-2015

download deliverable 

Documents, reports 2020-02-27

Algorithms for positioning rail freight trains

Algorithms for positioning rail freight trains and evaluation tool to assess feasibility of the solution.

Programme: H2020-EU.3.4.8.5. - Topic(s): S2R-CFM-IP5-01-2015

download deliverable 

Documents, reports 2020-02-27

Specification of data model for application interface of CMS

Application of TAF-TSI standard for defining CMS data structure, architecture and semantics; definition of common application interface for CMS.

Programme: H2020-EU.3.4.8.5. - Topic(s): S2R-CFM-IP5-01-2015

download deliverable 

Documents, reports 2020-02-27

Specifications Wagon

Technical specification document D1.2 will include chapters on:
D1.2.1 Core market wagon design including running gear
D1.2.2 Extended market wagon incl. ICT
D1.2.3 Automatic Coupling

Programme: H2020-EU.3.4.8.5. - Topic(s): S2R-CFM-IP5-01-2015

download deliverable 

Documents, reports 2020-02-27

Running gear and wagon design concepts

Report describing developed concepts and according assessment based on KPIs from WP1 including the potential of integration of results from WP2 and WP3 -> ranking of concepts

Programme: H2020-EU.3.4.8.5. - Topic(s): S2R-CFM-IP5-01-2015

download deliverable 

Documents, reports 2020-02-27

Optimized acoustic and aerodynamic characteristics

Report describing adapted experimental methods for freight train aerodynamics, measures for optimized train aerodynamics/ acoustics and aerodynamically driven inputs for driving dynamics.

Programme: H2020-EU.3.4.8.5. - Topic(s): S2R-CFM-IP5-01-2015

download deliverable 

Documents, reports 2020-02-27

Specification of data model for application interface of WMS

Application of TAF-TSI standard for defining WMS data structure, architecture and semantics; definition of common application interface for WMS.

Programme: H2020-EU.3.4.8.5. - Topic(s): S2R-CFM-IP5-01-2015

download deliverable 

Documents, reports 2020-02-27

Technologies for wagon monitoring system

Technologies for wheel to rail contact monitoring (Hardware + software + processing algorithms).

Programme: H2020-EU.3.4.8.5. - Topic(s): S2R-CFM-IP5-01-2015

download deliverable 

Documents, reports 2020-02-27

Detailed Specification of train’s wireless backbone infrastructure

Detailed Specification of train’s wireless backbone infrastructure. Specification of system and subsystem components, including internal and external interfaces for generic applications.

Programme: H2020-EU.3.4.8.5. - Topic(s): S2R-CFM-IP5-01-2015

download deliverable 

Documents, reports 2020-02-27

Website

Shift2Rail website.

Programme: H2020-EU.3.4.8.5. - Topic(s): S2R-CFM-IP5-01-2015

download deliverable 

Other 2020-01-24

Quality Plan

Quality plan including guidelines, Gantt charts, deliverable, milestone tables, document and presentation template

Programme: H2020-EU.3.4.8.5. - Topic(s): S2R-CFM-IP5-01-2015

download deliverable 

Documents, reports 2020-01-24

Plan for the Use and Dissemination

Plan for the Use and Dissemination of results.

Programme: H2020-EU.3.4.8.5. - Topic(s): S2R-CFM-IP5-01-2015

download deliverable 

Documents, reports 2020-01-24

State of the art

Report describing state of the art and current research activities with respect to running gear, wagon design, wheelset and braking technologies, noise, dynamic performance and track friendliness etc.

Programme: H2020-EU.3.4.8.5. - Topic(s): S2R-CFM-IP5-01-2015

download deliverable 

Documents, reports 2020-01-24

Technical requirements for automatic couplers (preliminary version)

Preliminary report collecting the technical requirements leading the development of automatic couplers for freight.

Programme: H2020-EU.3.4.8.5. - Topic(s): S2R-CFM-IP5-01-2015

download deliverable 

Documents, reports 2020-01-24

State of the art on automatic couplers

Report describing state of the art and current research activities with respect to automatic couplers and related technologies.

Programme: H2020-EU.3.4.8.5. - Topic(s): S2R-CFM-IP5-01-2015

download deliverable 

Documents, reports 2020-01-24