Opendata, web and dolomites

ITECCO Demo project deliverables

The page lists 6 deliverables related to the research project "ITECCO Demo".

 List of Deliverables

ITECCO Demo: list of downloadable deliverables.
title and desprition type last update

Swedish and Czech subsidiaries founded and ready to operate

Locations for the local maintenance (service, stock-keeping, configuration) of equipment will be evaluated for the target markets Poland/Czech Republic and Finland/Sweden.
Sites will be determined and the necessary asset or collaboration contracts will be signed. Company agreements will be drawn up and provided. The companies are inscribed in the commercial register and the bodies of the companies are appointed. The documents will be provided.

Programme: H2020-EU.3.4.;H2020-EU.2.1.1.;H2020-EU.2.3.1. - Topic(s): SMEInst-10-2016-2017

download deliverable 

Documents, reports 2019-08-16

Media for publishing about the running demonstrator

3 editorials in professional journals (e.g.: International Transport Journal, Verkehr – internationale Wochenzeitung, Solids & Bulk Handling) should be issued. 3 excerpts will be provided.
Based on the video film of the acting demonstrator form WP4 3 informative videos (InnnoWaggon, RockTainer & stationary unloading device) will be produced and provided on our homepage and on DVDs. The links to the short videos film will be submitted.

Programme: H2020-EU.3.4.;H2020-EU.2.1.1.;H2020-EU.2.3.1. - Topic(s): SMEInst-10-2016-2017

download deliverable 

Websites, patent fillings, videos etc. 2019-05-30

Information about the project on the homepage, brochure for fairs

The homepage will be restructured regarding branch solutions and solutions for steelmakers. URLs and screenshots of the homepage will be provided.
Branch specific brochure focused on the specific interest of steelmakers . PDFs of the brochure will be submitted.
The annual report will also be structured in branch solutions. It will be also provided as PDF.

Programme: H2020-EU.3.4.;H2020-EU.2.1.1.;H2020-EU.2.3.1. - Topic(s): SMEInst-10-2016-2017

download deliverable 

Websites, patent fillings, videos etc. 2019-05-30

German subsidiary founded and ready to operate

Locations for the local maintenance (service, stock-keeping, configuration) of equipment will be evaluated for the target markets France, Benelux, North Germany.
A site will be determined and the necessary asset or collaboration contracts will be signed. A company agreement will be drawn up and provided. The company is inscribed in the commercial register and the bodies of the company are appointed. The documents will be provided. The report includes the description of the evaluation process and the establishment of the new subsidiary.

Programme: H2020-EU.3.4.;H2020-EU.2.1.1.;H2020-EU.2.3.1. - Topic(s): SMEInst-10-2016-2017

download deliverable 

Documents, reports 2019-05-30

Prototype ready for safe test operation

The acceptance certificate of the facility and some pictures of it will be provided.

Programme: H2020-EU.3.4.;H2020-EU.2.1.1.;H2020-EU.2.3.1. - Topic(s): SMEInst-10-2016-2017

download deliverable 

Demonstrators, pilots, prototypes 2019-05-30

90ft InnoWaggon and wide gauge InnoWaggon certification

The acceptance certificates of the 90ft InnoWaggon and the wide gauge InnoWaggon as the result of the certification process and some pictures of it will be provided.

Programme: H2020-EU.3.4.;H2020-EU.2.1.1.;H2020-EU.2.3.1. - Topic(s): SMEInst-10-2016-2017

download deliverable 

Documents, reports 2019-08-01