 List of Deliverables

<IMPACT> Connected Car: list of downloadable deliverables.
title and desprition type last update

Connected Car Pioneer Awards Report. Round 2

One report after each Award Edition (M23 and 32)

Programme: H2020-EU.2.3.2.2.;H2020-EU.2.3.2.3. - Topic(s): INNOSUP-01-2016-2017

download deliverable 

Documents, reports 2020-03-06

Connected Car S3 Tool-kit

All the Smartization Process will be described as a ‘Tool-kit’ to help other regions, and other sectors, replicate this same approach. PARP will be responsible of defining it, implementing this approach also it in the regions linked to the project by Clusters or any other intermediate entity and, finally, try to extend it also to the European Regions including Automotive or some of the related sectors in their RIS3.

Programme: H2020-EU.2.3.2.2.;H2020-EU.2.3.2.3. - Topic(s): INNOSUP-01-2016-2017

download deliverable 

Documents, reports 2020-01-27

Funding Boot Camp Report. Batch 2

There will be one Funding Boot Camp per batch. A Funding Boot Camp Report will be prepared after each Boot Camp summarising the main outcomes.

Programme: H2020-EU.2.3.2.2.;H2020-EU.2.3.2.3. - Topic(s): INNOSUP-01-2016-2017

download deliverable 

Documents, reports 2020-01-27

Report on Final Distribution of Funds. Batch 2

Once the projects are finished, a Report on Final Distribution of Funds will be sent to EC. One report after each batch (M17 and 28)

Programme: H2020-EU.2.3.2.2.;H2020-EU.2.3.2.3. - Topic(s): INNOSUP-01-2016-2017

download deliverable 

Documents, reports 2020-01-27

Connected Car Open Community or Network update M25

First report in M5 describing initial version. Update of the report in
M14 and M25 after each Open Call

Programme: H2020-EU.2.3.2.2.;H2020-EU.2.3.2.3. - Topic(s): INNOSUP-01-2016-2017

download deliverable 

Websites, patent fillings, videos etc. 2020-01-27

Report on the Ignition Stage Results. Batch 2

The 18 best SMEs raked after the Interim Review will pass to following stage.
At the end of this stage a Report on the Ignition Stage Results for each batch will be prepared. This Report will include Business Report [ISDI], Technical Report [CTAG] and Results of the Interim Review [ISDI].

Programme: H2020-EU.2.3.2.2.;H2020-EU.2.3.2.3. - Topic(s): INNOSUP-01-2016-2017

download deliverable 

Documents, reports 2020-01-27

Connected Car Pioneer Awards Report. Round 1

One report after each Award Edition (M24 and 30)

Programme: H2020-EU.2.3.2.2.;H2020-EU.2.3.2.3. - Topic(s): INNOSUP-01-2016-2017

download deliverable 

Documents, reports 2020-01-27

Connected Car Platform update M25

First report in M4 describing initial version. Update of the report in
M14 and M25 after each Open Call

Programme: H2020-EU.2.3.2.2.;H2020-EU.2.3.2.3. - Topic(s): INNOSUP-01-2016-2017

download deliverable 

Websites, patent fillings, videos etc. 2020-01-27

Connected Car Open Community or Network update M14

First report in M5 describing initial version. Update of the report in
M14 and M25 after each Open Call

Programme: H2020-EU.2.3.2.2.;H2020-EU.2.3.2.3. - Topic(s): INNOSUP-01-2016-2017

download deliverable 

Websites, patent fillings, videos etc. 2020-01-27

Open Call Package of Documents. Round 2

Open Call Package of Documents: One per Open Call , containing Call Announcement, Guide for Applicants [GfA], Frequently Asked Questions [FAQs] and Application Form

Programme: H2020-EU.2.3.2.2.;H2020-EU.2.3.2.3. - Topic(s): INNOSUP-01-2016-2017

download deliverable 

Documents, reports 2020-01-27

Connected Car Platform update M14

First report in M4 describing initial version. Update of the report in
M14 and M25 after each Open Call

Programme: H2020-EU.2.3.2.2.;H2020-EU.2.3.2.3. - Topic(s): INNOSUP-01-2016-2017

download deliverable 

Websites, patent fillings, videos etc. 2020-01-27

Dissemination Strategy (update Open Call Round 1)

A Dissemination Strategy will be prepared at the beginning of the project, and ‘Dissemination Reports’ will be done after the main communication milestones (Open Calls) to evaluate the effectiveness of the strategies implemented and, based on it, propose improvement for next waves.
Strategy in M5 and one report after each Open Call (M12 and 23)

Programme: H2020-EU.2.3.2.2.;H2020-EU.2.3.2.3. - Topic(s): INNOSUP-01-2016-2017

download deliverable 

Documents, reports 2020-01-27

Disruptive Boot Camps Report. Batch 1

The 37 best SMEs will be invited to past to next stage. A Report on the Disruptive Boot Camp Results [D5.1 and D5.2] for each batch will be prepared

Programme: H2020-EU.2.3.2.2.;H2020-EU.2.3.2.3. - Topic(s): INNOSUP-01-2016-2017

download deliverable 

Documents, reports 2020-01-27

Funding Boot Camp Report. Batch 1

There will be one Funding Boot Camp per batch. A Funding Boot Camp Report will be prepared after each Boot Camp summarising the main outcomes.

Programme: H2020-EU.2.3.2.2.;H2020-EU.2.3.2.3. - Topic(s): INNOSUP-01-2016-2017

download deliverable 

Documents, reports 2020-01-27

Digital Boot Camp Report. Batch 1

There will be one Digital Boot Camp at the beginning of the ‘Ignition Stage’ of the Smartization Programme.
A Digital Boot Camp Report will be prepared after each Boot Camp summarising the main outcomes.

Programme: H2020-EU.2.3.2.2.;H2020-EU.2.3.2.3. - Topic(s): INNOSUP-01-2016-2017

download deliverable 

Documents, reports 2020-01-27

Technical Boot Camp Report. Batch 1

There will be one Technical Boot Camp per batch where the 13 SMEs best ranked in previous stage will participate. A Technical Boot Camp Report will be prepared after each Boot Camp, summarising the main outcomes.

Programme: H2020-EU.2.3.2.2.;H2020-EU.2.3.2.3. - Topic(s): INNOSUP-01-2016-2017

download deliverable 

Documents, reports 2020-01-27

Pioneer MVP developed

Each one of the 5 Disruptive SMEs included in the project will execute one Use Case related with some of the Challenges categories established in the Project. A detailed definition and final report of the Uses Cases executed will be elaborated.

Programme: H2020-EU.2.3.2.2.;H2020-EU.2.3.2.3. - Topic(s): INNOSUP-01-2016-2017

download deliverable 

Documents, reports 2020-01-27

Dissemination Strategy (update Open Call Round 2)

A Dissemination Strategy will be prepared at the beginning of the project, and ‘Dissemination Reports’ will be done after the main communication milestones (Open Calls) to evaluate the effectiveness of the strategies implemented and, based on it, propose improvement for next waves.
Strategy in M5 and one report after each Open Call (M12 and 23)

Programme: H2020-EU.2.3.2.2.;H2020-EU.2.3.2.3. - Topic(s): INNOSUP-01-2016-2017

download deliverable 

Documents, reports 2020-01-27

Report on Final Distribution of Funds. Batch 1

Once the projects are finished, a Report on Final Distribution of Funds will be sent to EC. One report after each batch (M17 and 28)

Programme: H2020-EU.2.3.2.2.;H2020-EU.2.3.2.3. - Topic(s): INNOSUP-01-2016-2017

download deliverable 

Documents, reports 2020-01-27

Report on the Ignition Stage Results. Batch 1

The 13 best SMEs raked after the Interim Review will pass to following stage.
At the end of this stage a Report on the Ignition Stage Results for each batch will be prepared. This Report will include Business Report [ISDI], Technical Report [CTAG] and Results of the Interim Review [ISDI].

Programme: H2020-EU.2.3.2.2.;H2020-EU.2.3.2.3. - Topic(s): INNOSUP-01-2016-2017

download deliverable 

Documents, reports 2020-01-27

Pioneer Value Link Chain report

This report will explaing the potential interactions that Use-Cases Product/Process/Method can bring to existing value chains related to Connected Car.

Programme: H2020-EU.2.3.2.2.;H2020-EU.2.3.2.3. - Topic(s): INNOSUP-01-2016-2017

download deliverable 

Documents, reports 2020-01-27

Open Call Package of Documents. Round 1

Open Call Package of Documents: One per Open Call (M6, 8 and 14), containing Call Announcement, Guide for Applicants [GfA], Frequently Asked Questions [FAQs] and Application Form

Programme: H2020-EU.2.3.2.2.;H2020-EU.2.3.2.3. - Topic(s): INNOSUP-01-2016-2017

download deliverable 

Documents, reports 2020-01-27

Technical Boot Camp Report. Batch 2

There will be one Technical Boot Camp per batch where the 18 SMEs best ranked in previous stage will participate. A Technical Boot Camp Report will be prepared after each Boot Camp, summarising the main outcomes.

Programme: H2020-EU.2.3.2.2.;H2020-EU.2.3.2.3. - Topic(s): INNOSUP-01-2016-2017

download deliverable 

Documents, reports 2020-01-27

Disruptive Boot Camps Report. Batch 2

The 37 best SMEs (22 for the second call in addition to the 15 selected in the first call) will be invited to past to next stage. A Report on the Disruptive Boot Camp Results [D5.1 and D5.2] for each batch will be prepared.

Programme: H2020-EU.2.3.2.2.;H2020-EU.2.3.2.3. - Topic(s): INNOSUP-01-2016-2017

download deliverable 

Documents, reports 2020-01-27

Digital Boot Camp Report. Batch 2

There will be one Digital Boot Camp at the beginning of the ‘Ignition Stage’ of the Smartization Programme.
A Digital Boot Camp Report will be prepared after each Boot Camp summarising the main outcomes.

Programme: H2020-EU.2.3.2.2.;H2020-EU.2.3.2.3. - Topic(s): INNOSUP-01-2016-2017

download deliverable 

Documents, reports 2020-01-27

Dissemination Strategy

A Dissemination Strategy will be prepared at the beginning of the project, and ‘Dissemination Reports’ will be done after the main communication milestones (Open Calls) to evaluate the effectiveness of the strategies implemented and, based on it, propose improvement for next waves.
Strategy in M3 and one report after each Open Call (M6, 12 and 18)

Programme: H2020-EU.2.3.2.2.;H2020-EU.2.3.2.3. - Topic(s): INNOSUP-01-2016-2017

download deliverable 

Documents, reports 2020-01-27

Connected Car Open Community or Network

First report in M5 describing actions to be done. Update of the report in M9, M12 and M18 after each Open Call

Programme: H2020-EU.2.3.2.2.;H2020-EU.2.3.2.3. - Topic(s): INNOSUP-01-2016-2017

download deliverable 

Websites, patent fillings, videos etc. 2020-01-27

Connected Car Platform

A virtual Platform will be created as the meeting-point for the emerging Connected Car Community including the modules described in Section 1.3.(b) .

Programme: H2020-EU.2.3.2.2.;H2020-EU.2.3.2.3. - Topic(s): INNOSUP-01-2016-2017

download deliverable 

Websites, patent fillings, videos etc. 2020-01-27

Pioneer Successful C-Car Stories

On line material will be prepared, based on the disruptions these Pioneers and its Uses Cases are already doing in Connected Car market, to be uses as ‘Successful C-Car Stories” [D3.3] or best practises.

Programme: H2020-EU.2.3.2.2.;H2020-EU.2.3.2.3. - Topic(s): INNOSUP-01-2016-2017

download deliverable 

Documents, reports 2020-01-27

Plan for the Exploitation and Dissemination of Results [PEDR]

A report will be prepared at beginning of the project, to coordinate all the tasks which have to be done during the project. An updated version would be provided in the periodic and final reports. This document will include also the ‘Communication Plan’ to be implemented within the project and a ‘Data Management Plan’.

Programme: H2020-EU.2.3.2.2.;H2020-EU.2.3.2.3. - Topic(s): INNOSUP-01-2016-2017

download deliverable 

Documents, reports 2020-01-27