The page lists 9 deliverables related to the research project "BIMplement".
title and desprition | type | last update |
---|---|---|
Elaborated quality control and qualification matrix for ventilation and air tightnessElaborated quality control and qualification matrix for ventilation and air tightness. These qualifications will be elaborated in detail for trades and professions involved in ventilation technologies and air tight building. Language: English Programme: H2020-EU.3.3.7.;H2020-EU.3.3.1. - Topic(s): EE-14-2016-2017 |
Documents, reports | 2020-04-02 |
Methodology guide and tools for awareness campaignMethodology guide and tools for awareness campaigns Programme: H2020-EU.3.3.7.;H2020-EU.3.3.1. - Topic(s): EE-14-2016-2017 |
Documents, reports | 2020-04-02 |
Selected tool and learning methods, implemented in the five national frameworksSelected tool and learning methods, implemented in the five national frameworks. Tools and learning methods will be selected to implement this content (in work package 4). Programme: H2020-EU.3.3.7.;H2020-EU.3.3.1. - Topic(s): EE-14-2016-2017 |
Documents, reports | 2020-04-02 |
List of criteria and of the selected territoriesList of criteria and of the selected territories with a distinction of two kind of pilots; the pilot field labs and the pilot experimental sites. This ‘training provision’ will be made territory specific, by using available local funding possibilities, space in calls for tenders. Programme: H2020-EU.3.3.7.;H2020-EU.3.3.1. - Topic(s): EE-14-2016-2017 |
Documents, reports | 2020-04-02 |
Replication and exploitation planReplication and exploitation plan. This includes a business plan to continue the BIMplement activities after the project duration Programme: H2020-EU.3.3.7.;H2020-EU.3.3.1. - Topic(s): EE-14-2016-2017 |
Documents, reports | 2020-04-02 |
Adjusted methodology for a BIM-enhanced Qualification Framework including an instruction guideAdjusted methodology for a BIM-enhanced Qualification Framework including an instruction guide. This includes that the method itself will be translated in an easy to use database including a web based interface. This database will be accessible also with an API (application programming interface) to enable BIM-tools to make use of it. Language: English Programme: H2020-EU.3.3.7.;H2020-EU.3.3.1. - Topic(s): EE-14-2016-2017 |
Documents, reports | 2020-04-02 |
Five national results of usability testingFive national results of usability testing in which the methodology and the results of the iterations in T2.1 are discussed with national stakeholders. If needed one or two iterations of fine-tuning the methodology and the results will be executed. Programme: H2020-EU.3.3.7.;H2020-EU.3.3.1. - Topic(s): EE-14-2016-2017 |
Documents, reports | 2020-04-02 |
Methodology for a BIM-enhanced Qualification FrameworkMethodology for a BIM-enhanced Qualification Framework. This concerns a EU Qualification framework that combines nZEB technology related qualifications, interdisciplinary and cross-trade qualifications and BIM process related qualifications. Programme: H2020-EU.3.3.7.;H2020-EU.3.3.1. - Topic(s): EE-14-2016-2017 |
Documents, reports | 2020-04-02 |
Overview of possibilities to connect the tools and learning methods to the BIM models & processOverview of possibilities to connect the tools and learning methods to the BIM models & process. The actual implementation within the selected tools and learning methods will be performed. This includes connecting databases with learning content to the BIM-model(s) and the selected learning tools. Programme: H2020-EU.3.3.7.;H2020-EU.3.3.1. - Topic(s): EE-14-2016-2017 |
Documents, reports | 2020-04-02 |