Opendata, web and dolomites

Report

Teaser, summary, work performed and final results

Periodic Reporting for period 1 - GEECCO (Gender Equality in Engineering through Communication and Commitment)

Teaser

Scientific and technological innovations are increasingly important in our knowledge-based economies. Today STEM (Science, Technology, Engineering, and Mathematics) is literally everywhere; it shapes our everyday experiences. With technologies we choose e.g. structures that...

Summary

Scientific and technological innovations are increasingly important in our knowledge-based economies. Today STEM (Science, Technology, Engineering, and Mathematics) is literally everywhere; it shapes our everyday experiences. With technologies we choose e.g. structures that influence over a very long time how people are going to work, communicate, travel, consume, and so forth. It is thus both a question of competitiveness and justice,to achieve gender equity within science and technology institutions, including policy and decision-making bodies.
GEECCO aims to establish tailor-made Gender Equality Plans (GEPs) in 4 European RPOs and to implement the gender dimension in 2 RFOs (funding schemes, programmes and review processes). All participating RPOs are located in the STEM (Science, Technology, Engineering, and Mathematics) field, where gender equality is still a serious problem and whose innovations are increasingly important in the knowledge-based economies.
GEECCO pursues the following objectives in order to enhance systemic institutional change towards gender equality in the STEM-field: (i) Setting up change framework and a tailor-made GEP for each participating RPO; (ii) Implementing gender criteria in the activities of RFOs; (iii) Setting up a self-reflective learning environment in and between all RPOs und RFOs to participate from existing experiences and match them with their specific needs and circumstances. (iv) Evaluate GEP implementation within the participating RPOs and RFOs with a quantitative evaluation using monitoring indicators and a qualitative monitoring to enhance and fine-tune implemented actions over the course of the project.

Work performed

Within the reporting period, all work packages have started, two of them are already finished.
Within WP2 the project management structure has been set up, three project meetings (in Vienna, Barcelona and Krakow) took place. All official requirements have been fulfilled. WP3 had a duration of 7 months and was finished within that time frame. As a result, tailor-made GEPs for each of the 4 implementing RPOs were developed. These GEPs serve as a basis for the upcoming WPs. WP4, WP5, WP6 have all started on time and the first results – baseline documentations – were produced (see the resp. deliverables). WP7 deals with the RFO-perspective, preliminary work was conducted, and the first RFO-observer group meeting took place. Within WP8 all trainings were developed, some of them have already taken place. Furthermore, a help desk consisting of skype, face-to-face consultancy as well as remote supporting documents was implemented, which is continuously adapted to the partners’ needs. Within WP9 dissemination activities on both, national as well as European level, have been carried out. WP10 developed monitoring templates and the evaluation concept was developed.

Final results

All WPs – except for the two that are already finished – will be conducted as foreseen in the DoA. No major deviations are expected.