The page lists 11 deliverables related to the research project "TERRA".
title and desprition | type | last update |
---|---|---|
TERRA research results reportConclusions regarding the ground-based technologies current state, future needs and results from individual analysis of these technologies and proof-of-concept findings will be presented here. Conclusions and recommendation based on the work done will be included. Further steps and future research lines will be proposed. Programme: H2020-EU.3.4.7. - Topic(s): RPAS-04 |
Documents, reports | 2020-04-25 |
Exploitation & Dissemination reportSummary of exploitation and dissemination activities. Programme: H2020-EU.3.4.7. - Topic(s): RPAS-04 |
Documents, reports | 2020-03-24 |
Architecture & Integration of Systems Description - Public VersionPublic version of D 5.2 Programme: H2020-EU.3.4.7. - Topic(s): RPAS-04 |
Documents, reports | 2020-03-24 |
Results of the Simulation activityPreliminary evaluation of the tools (including their HMI) and technologies for the management of ground geo-fencing, the coordination with an ATM system, the management of Traffic Conflict alerts and the management of the deviations from the normal RPAS flight paths. Programme: H2020-EU.3.4.7. - Topic(s): RPAS-04 |
Documents, reports | 2020-03-24 |
Simulation Test CasesTest cases description. Programme: H2020-EU.3.4.7. - Topic(s): RPAS-04 |
Documents, reports | 2020-03-24 |
Report on technologies analysisTechnical and economic gap analysis of the existing vs proposed technologies for UTM will be conducted, in order to assess their capability to meet the functional requirements defined in WP3.4. Programme: H2020-EU.3.4.7. - Topic(s): RPAS-04 |
Documents, reports | 2020-03-24 |
Simulation Environment DescriptionFinmeccanica will provide a simulation facility which will be described in this deliverable. Programme: H2020-EU.3.4.7. - Topic(s): RPAS-04 |
Documents, reports | 2020-03-24 |
Findings on the potential of particular new technologiesFindings on the potential of particular new technologies Programme: H2020-EU.3.4.7. - Topic(s): RPAS-04 |
Documents, reports | 2020-03-24 |
RPAS requirements for different business cases and VFR and other stakeholders derived requirementsThe main business cases to be analysed include, among others, Crisis Management, Environment Surveillance, Law Enforcement, Search & Rescue, Goods Delivering, Mapping & Photogrammetry, Agriculture, Air Navigation Aids calibration, or runway inspection and structures and linear transport infrastructures inspection (bridges, railways, roads, etc.). Programme: H2020-EU.3.4.7. - Topic(s): RPAS-04 |
Documents, reports | 2019-09-06 |
Analysis of ground technologies and tools which could be applied to UTMContinuing on the output of WP3, WP4.1 will provide an analysis of the strengths and weaknesses of existing CNS/ATM technologies for UTM and their theoretical capabilities to meet the required performance. Programme: H2020-EU.3.4.7. - Topic(s): RPAS-04 |
Documents, reports | 2019-09-06 |
Summary of Ground Technologies operational and functional requirements to support UTMThis task will gather all the information from the previous activities into the Operational Requirements (i.e. what the user needs) which will be transformed into Functional Requirements (i.e. what the system (s) should do to meet these operational needs). Programme: H2020-EU.3.4.7. - Topic(s): RPAS-04 |
Documents, reports | 2019-09-06 |