Opendata, web and dolomites

HYBUILD project deliverables

The page lists 14 deliverables related to the research project "HYBUILD".

 List of Deliverables

HYBUILD: list of downloadable deliverables.
title and desprition type last update

Configuration of the hard- and software interfaces of the DCS finished

Description of describes the connection of drives, controls and measurements to the industrial process control system (PCS), its configuration, development of the human machine interface and interface to software for advanced control and simulation.

Programme: H2020-EU.2.1.5.2. - Topic(s): EEB-06-2017

download deliverable 

Documents, reports 2020-02-19

HYBUILD business model

Report documenting the project level business model canvasing and market analysis results with the intent of facilitating project replication planning activities.

Programme: H2020-EU.2.1.5.2. - Topic(s): EEB-06-2017

download deliverable 

Documents, reports 2020-02-19

Communication plan

Communication plan for the project to ensure maximum and visibility and impact of the project outcomes.

Programme: H2020-EU.2.1.5.2. - Topic(s): EEB-06-2017

download deliverable 

Documents, reports 2020-02-19

Technical and market review codes studies, national and European certification frameworks

Report with a deep review of codes and certification framework.

Programme: H2020-EU.2.1.5.2. - Topic(s): EEB-06-2017

download deliverable 

Documents, reports 2020-02-19

Stakeholder advisory board description of tasks and composition

SHAB composition (with proof of acceptance by members) and description of its functions.

Programme: H2020-EU.2.1.5.2. - Topic(s): EEB-06-2017

download deliverable 

Documents, reports 2020-02-19

Internal and external communication strategy

Strategy including objectives, target audience, message, communication activities and tools needed to answer the communication targets.

Programme: H2020-EU.2.1.5.2. - Topic(s): EEB-06-2017

download deliverable 

Documents, reports 2020-02-19

Requirements: context of application, building classification, and dynamic uses consideration

Definition of requirements and constraints

Programme: H2020-EU.2.1.5.2. - Topic(s): EEB-06-2017

download deliverable 

Documents, reports 2020-02-19

HYBUILD Flipbook

Flipbook (online interactive environment) populated by project watch activity results.

Programme: H2020-EU.2.1.5.2. - Topic(s): EEB-06-2017

download deliverable 

Websites, patent fillings, videos etc. 2020-02-19

Modular flow sheet simulation of the hybrid (sub-)system

Description of the integration of the generic dynamic unit and component models in a basic dynamic flowsheet simulation. This flowsheet is the hybrid sub-system defined by the core components of the hybrid storage, that are the high temperature latent storage and DC driven heat pump and electrical battery.

Programme: H2020-EU.2.1.5.2. - Topic(s): EEB-06-2017

download deliverable 

Documents, reports 2020-02-19

Requirements: Key Performance Indicators, system components and performance targets

Definition of KPI for performance assessment

Programme: H2020-EU.2.1.5.2. - Topic(s): EEB-06-2017

download deliverable 

Documents, reports 2020-02-19

Data Management Plan (DMP)

First draft of the DMP will all pertinent regulations of data management, access, preservation, etc.

Programme: H2020-EU.2.1.5.2. - Topic(s): EEB-06-2017

download deliverable 

Documents, reports 2020-02-19

Dissemination and exploitation plan

Dissemination and exploitation plan for the project to ensure maximum and visibility and impact of the project outcomes.

Programme: H2020-EU.2.1.5.2. - Topic(s): EEB-06-2017

download deliverable 

Documents, reports 2020-02-19

Smart system algorithms

Description of the algorithms developed, mathematical representation of the building/plant system, definition of inputs, outputs, and optimization objectives, algorithms for the exploration of the space of possible solutions for predictive control.

Programme: H2020-EU.2.1.5.2. - Topic(s): EEB-06-2017

download deliverable 

Documents, reports 2020-02-19

Web-based platform

Web-site for external communication and dissemination, and for internal information management.

Programme: H2020-EU.2.1.5.2. - Topic(s): EEB-06-2017

download deliverable 

Websites, patent fillings, videos etc. 2020-02-19