Opendata, web and dolomites

IMPACT-2 SIGNED

Indicator Monitoring for a new railway PAradigm in seamlessly integrated Cross modal Transport chains – Phase 2

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

Project "IMPACT-2" data sheet

The following table provides information about the project.

Coordinator
TRAFIKVERKET - TRV 

Organization address
address: RODA VAGEN 1
city: BORLANGE
postcode: 781 89
website: www.trafikverket.se

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Sweden [SE]
 Total cost 3˙153˙652 €
 EC max contribution 3˙153˙652 € (100%)
 Programme 1. H2020-EU.3.4.8.6. (Cross-cutting themes and activities (CCA))
 Code Call H2020-S2RJU-CFM-2017
 Funding Scheme Shift2Rail-RIA
 Starting year 2017
 Duration (year-month-day) from 2017-09-01   to  2022-08-31

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    TRAFIKVERKET - TRV SE (BORLANGE) coordinator 263˙085.00
2    SIEMENS MOBILITY GMBH DE (MUNCHEN) participant 589˙712.00
3    DEUTSCHE BAHN AG DE (BERLIN) participant 379˙962.00
4    THALES GROUND TRANSPORTATION SYSTEMS UK LTD UK (READING) participant 311˙942.00
5    HITACHI RAIL STS SPA IT (GENOVA) participant 290˙175.00
6    HACON INGENIEURGESELLSCHAFT MBH DE (HANNOVER) participant 286˙171.00
7    DEUTSCHES ZENTRUM FUER LUFT - UND RAUMFAHRT EV DE (KOELN) participant 274˙638.00
8    BOMBARDIER TRANSPORTATION SWEDEN AB SE (VASTERAS) participant 266˙638.00
9    INDRA SISTEMAS SA ES (ALCOBENDAS MADRID) participant 190˙910.00
10    SNCF FR (SAINT DENIS) participant 112˙877.00
11    CONSTRUCCIONES Y AUXILIAR DE FERROCARRILES INVESTIGACION Y DESARROLLO SL ES (BEASAIN) participant 99˙990.00
12    CP - COMBOIOS DE PORTUGAL EPE PT (LISBOA) participant 31˙994.00
13    SIEMENS AKTIENGESELLSCHAFT DE (MUNCHEN) participant 31˙558.00
14    TURKIYE CUMHURIYETI DEVLET DEMIR YOLLARI ISLETMESI GENEL MUDURLUGU TR (ANKARA) participant 23˙996.00

Map

 Project objective

This Project aims to perform the socio-economic Research for Shift2Rail, to develop the SPD Scenarios and the KPI integrated assessment. Smart Maintenance, Standardisation, Integrated Mobility Management and Human Ressources are cross-cutting activities of Shift2Rail as well and consequently topics of the Project, too. The objectives of this proposal IMPACT-2 are: - Evaluating the effects for mobility, society and environment induced by new technology solutions and developments, - Introducing relevant targets and needs to create a more attractive, a more competitive and more sustainable rail system - Defining System Platform Demonstrators (SPD) that represent future application use cases - Defining Key Performance Indicators (KPIs) that enable the monitoring and assessment of the Shift2Rail overall target achievement. - Smart Maintenance - Prepare an efficient process for bringing Shift2Rail results into standardisation - Develop a common platform for the intelligent mobility management - Human ressources The project IMPACT-2 is planned to fulfil all respective topics of the Shift2Rail Annual Work Plan 2017.

 Deliverables

List of deliverables.
Initial estimation of the KPIs Documents, reports 2020-04-09 20:02:51
CBM Data structures Documents, reports 2020-04-09 20:02:58
Data Management Plan Documents, reports 2020-04-09 20:51:03

Take a look to the deliverables list in detail:  detailed list of IMPACT-2 deliverables.

 Publications

year authors and title journal last update
List of publications.
2019 Svenja Hainz, Siv Leth, Rüdiger Garburg, Elodie Vannier, Dennis Fast
Noise Assessment of Railway Innovations
published pages: , ISSN: , DOI:
“The Science behind Hands on Sustainable Mobility” Conference 2020-01-30
2019 Yves Perreal, Svenja Hainz, Elodie Vannier, Ida Kristoffersson, Michael Meyer zu Hörste
A methodology to assess the impact of end-user centric innovations on railway transportation attractiveness
published pages: , ISSN: , DOI:
WCRR2019 2020-01-30
2018 Svenja Hainz, Elodie Vannier, Michael Meyer zu Hörste, Ida Kristoffersson
Passenger demand in a technical world
published pages: , ISSN: , DOI:
Symposium on Rail Transport Demand Management 2018 2019-10-28
2018 Svenja Hainz, Michael Meyer zu Hörste, Florian Brinkmann
Bewertungsmethodik für die Projektergebnisse im Joint Undertaking Shift2Rail
published pages: 6-14, ISSN: 0037-4997, DOI:
SIGNAL + DRAHT 01-02/2018 2019-10-28

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "IMPACT-2" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "IMPACT-2" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.4.8.6.)

PLASA-2 (2018)

Smart Planning and Virtual Certification

Read More  

TRANSIT (2019)

Train pass-by noise source characterization and separation tools for cost-effective vehicle certification

Read More  

FINE-2 (2019)

Furthering Improvements in Integrated Mobility Management (I2M), Noise and Vibration, and Energy in Shift2Rail

Read More