The page lists 6 deliverables related to the research project "ESSnuSB".
title and desprition | type | last update |
---|---|---|
Initial facility parameters.Common to all working groups Initial facility parameters will be established in order to avoid diverging by using different options. The initial baseline parameters will be updated each time it is proved that new values of these parameters would increase the performance of the facility. Programme: H2020-EU.1.4.1.1. - Topic(s): INFRADEV-01-2017 |
Documents, reports | 2020-03-24 |
H- source design, integration into ESS and RF upgrade studies.First H- source design, integration into ESS present facility (optics and hardware) and RF upgrade studies to comply with the facility proposed upgrades. Programme: H2020-EU.1.4.1.1. - Topic(s): INFRADEV-01-2017 |
Documents, reports | 2020-03-24 |
Physics Performance according to initial parameters.The Physics Performance according to initial parameters will be calculated and used as reference for the coming improvements. Programme: H2020-EU.1.4.1.1. - Topic(s): INFRADEV-01-2017 |
Documents, reports | 2020-03-24 |
Requirements for the linac.A list of the requirements for the necessary linac modifications will be established. Programme: H2020-EU.1.4.1.1. - Topic(s): INFRADEV-01-2017 |
Documents, reports | 2020-03-24 |
Near detector requirements.The Near detector requirements (beam monitoring, crsoss-section measurements,...) will be clearly established before proceeding to the design of this detector. Programme: H2020-EU.1.4.1.1. - Topic(s): INFRADEV-01-2017 |
Documents, reports | 2020-03-24 |
Data Management PlanFirst draft of Data Management Plan. Programme: H2020-EU.1.4.1.1. - Topic(s): INFRADEV-01-2017 |
Open Research Data Pilot | 2020-03-24 |