The page lists 13 deliverables related to the research project "OSMOSE".
title and desprition | type | last update |
---|---|---|
Mechanism design and specificationsDescription of the target mechanism and concept of FlexEnergy dispatch market including control system architecture and specifications for the associated computer-based tools that will enable (i) close to real-time assessment of cross border exchange capability (ii) creation of bids for inter and intra-control area bidding platform and (iii) supply/demand matching of bids in such a way that maximisation of social welfare is achieved in a given time interval. Programme: H2020-EU.3.3.4. - Topic(s): LCE-04-2017 |
Documents, reports | 2020-04-11 |
Comprehensive report on functionalities and services for the power systemAll the functionalities regarding the frequency control, voltage control and synthetic inertia that the solution have to deliver in normal operation and in the event of contingencies, to reduce the impact of the variations of the production of RES, reduce the load shedding after contingency, congestion management and oscillation damping. Programme: H2020-EU.3.3.4. - Topic(s): LCE-04-2017 |
Documents, reports | 2020-04-11 |
European Long-Term Scenarios Description, including DataThe scenarios will be based on well-established scenarios (e.g. e-Highway2050, ENTSO-E-SOAF , etc.) and will mainly cover generation, consumption and interconnection levels within/between countries for the years 2030 and 2050. Programme: H2020-EU.3.3.4. - Topic(s): LCE-04-2017 |
Documents, reports | 2020-04-11 |
Overall specifications of the demonstrationsThis deliverable will describe the specifications of the demonstrations that will be carried out on EPFL site and on RTE “RingoLab†site. It will include the objectives of each demonstration, the considered test cases, the performance metrics that will be used to assess the results and the test protocols. The metering and data logging infrastructure will also be described. Programme: H2020-EU.3.3.4. - Topic(s): LCE-04-2017 |
Documents, reports | 2020-04-11 |
Flexibility cost and operational data outlookFor each technology, linked to families of flexibility options, technical and cost data will be provided: these estimates will be given with uncertainty ranges – most favourably offering a connection to installation levels (“learning ratesâ€). Programme: H2020-EU.3.3.4. - Topic(s): LCE-04-2017 |
Documents, reports | 2020-04-11 |
Techno-economic analysis of DSR and RES selected servicesThe deliverable will summarize the results of the analysis of DSR and RES flexibilities available in the WP5 demo site and include the specification of power electronic devices necessary to provide ancillary services to the grid, also for the case of multiservice provision. Programme: H2020-EU.3.3.4. - Topic(s): LCE-04-2017 |
Documents, reports | 2020-04-11 |
Multi-service control algorithm for convertersIt addresses the design of cooperative control algorithms to provide multiple ancillary service to the grid. This algorithm will serve as the outer control loop for the synchronisation algorithms from the MIGRATE project, thus allowing to provide additional services on top of synchronisation. Programme: H2020-EU.3.3.4. - Topic(s): LCE-04-2017 |
Documents, reports | 2020-04-11 |
Methodology for error forecasts at an European scaleA generalized forecast error modelling method is proposed including error descriptions for wind, photovoltaic generation and load at a European scale. The method will account for space-time correlations. The deliverable documents the developed methodology, which will be released in the public domain. Programme: H2020-EU.3.3.4. - Topic(s): LCE-04-2017 |
Documents, reports | 2020-04-11 |
Candidate market mechanisms and regulatory frameworks fostering the development of flexibilities needed for 2050 RES penetration targets“Critical review of current regulations concerning the market deployment and remuneration of storage in different countries of the EUâ€. Programme: H2020-EU.3.3.4. - Topic(s): LCE-04-2017 |
Documents, reports | 2020-04-11 |
Data management planThis identifies the data that should be subject of dissemination and exploitation activities. It also analyses the main data uses and users and explore the possible restrictions related to IPR and privacy issues. Programme: H2020-EU.3.3.4. - Topic(s): LCE-04-2017 |
Documents, reports | 2020-04-11 |
Project Management Plandetailed Project Management Plan with a Gantt chart and a Work Breakdown Structure (WBS), to be completed at a very early stage of the project M2 and updated on M18 and M36 Programme: H2020-EU.3.3.4. - Topic(s): LCE-04-2017 |
Documents, reports | 2020-04-11 |
Project web site available for public accessThe website is an information vector covering: broad information on the project activity; presentation of the results; useful documentation, etc. Programme: H2020-EU.3.3.4. - Topic(s): LCE-04-2017 |
Websites, patent fillings, videos etc. | 2020-04-11 |
Communication and dissemination master planThis deliverable outlines the project’s communication and dissemination activities, detailing the composition of the target groups and defining the communication tools and distribution channels to reach them. Programme: H2020-EU.3.3.4. - Topic(s): LCE-04-2017 |
Documents, reports | 2020-04-11 |