The page lists 10 deliverables related to the research project "ENSEMBLE".
title and desprition | type | last update |
---|---|---|
ENSEMBLE LoIA Letter of Intent will be drafted by ERT to ask the formalisation of automotive industry and road authorities’ commitment to bring truck platooning technological solutions to the market in a short time horizon. Programme: H2020-EU.3.4. - Topic(s): ART-03-2017 |
Documents, reports | 2020-04-02 |
ENSEMBLE regulatory framework – state of the artExtensive analysis of the current EU regulatory framework. Gaps and necessities will be identified in order to allow a EU-wide deployment of multi-brand platooning Programme: H2020-EU.3.4. - Topic(s): ART-03-2017 |
Documents, reports | 2020-04-02 |
ENSEMBLE digital presenceENSEMBLE digital presence will be ensured by a dedicated website linking with the ETPC platform, and social medias presence in the most relevant platforms (LinkedIn, twitter, ResearchGate etch.) Programme: H2020-EU.3.4. - Topic(s): ART-03-2017 |
Other | 2020-04-02 |
Requirements Review from EU projectsRequirements review from EU projects: report summarising the requirements used/defined for platooning in (former) EU projects, as far as available in the public domain Programme: H2020-EU.3.4. - Topic(s): ART-03-2017 |
Documents, reports | 2020-04-02 |
SOTIF Safety ConceptIdentify SOTIF use cases, analyse the associated risks and define SOTIF safety requirements and updated the Operation Design Domain Programme: H2020-EU.3.4. - Topic(s): ART-03-2017 |
Documents, reports | 2020-04-02 |
ENSEMBLE Printed materialPrinted material such as posters and flyers, to guarantee a relevant and effective dissemination at targeted events. All materials will conform to the project visual identity, to be defined in D6.1. Programme: H2020-EU.3.4. - Topic(s): ART-03-2017 |
Other | 2020-04-02 |
Iterative Process Document and “Item Definitionâ€Definition of an iterative development process for functional safety activities including description of the item, its dependencies on, and interactions with, the environment and other items. Programme: H2020-EU.3.4. - Topic(s): ART-03-2017 |
Documents, reports | 2020-04-02 |
First Version Functional specification for white-label trucks (Operational & Tactical layers)Report 1, first version; quantitative specification of the requirements imposed on the automation functions. Programme: H2020-EU.3.4. - Topic(s): ART-03-2017 |
Documents, reports | 2020-04-02 |
First version Hazard Analysis and Risk Assessment and Functional Safety ConceptIdentification and categorisation of the hazards that malfunctions in the platooning function can trigger and derivation of functional safety requirements to mitigate the effects of these hazards. Focused on platooning level A Programme: H2020-EU.3.4. - Topic(s): ART-03-2017 |
Documents, reports | 2020-04-02 |
Platooning protocol definition and Communication strategySpecification of the secure vehicle-to-vehicle (V2V) communication between trucks and secure vehicle-to-infrastructure (V2I) communication between trucks and smart infrastructure, V2X communication, in order to create an interoperable platooning system. The V2X communication is situated in the tactical layer. Programme: H2020-EU.3.4. - Topic(s): ART-03-2017 |
Documents, reports | 2020-04-02 |