The page lists 13 deliverables related to the research project "E-LOBSTER".

 List of Deliverables

E-LOBSTER: list of downloadable deliverables.
title and desprition type last update

Electrical Energy Storage for Smart Grid and Electrified Transport Interaction

Specification of local energy storage for mutual benefit synergies (definition of type of storage, capacity (energy and power), management to be considered, installation etc. (T2.3)

Programme: H2020-EU.3.3.4. - Topic(s): LCE-01-2016-2017

download deliverable 

Documents, reports 2020-02-27

Leaflet and poster on the project

Dissemination material for the presentation of project contents (T6.3)

Programme: H2020-EU.3.3.4. - Topic(s): LCE-01-2016-2017

download deliverable 

Other 2020-02-27

Dissemination Plan

Means of dissemination and communication, targeted audience and objectives to promote project contents (T6.3)

Programme: H2020-EU.3.3.4. - Topic(s): LCE-01-2016-2017

download deliverable 

Documents, reports 2020-02-27

Report on the current operating standard

Assessment of current technical framework and standards in both transport grid and DN. It will also describe the regulations to be satisfied by the hardware implementation (T3.1-3.3)

Programme: H2020-EU.3.3.4. - Topic(s): LCE-01-2016-2017

download deliverable 

Documents, reports 2020-02-27

Measures for energy losses prevention in the traction chain

Assessment of losses on the electrified transport network and how to work on it with a focus on the potential interconnection with local grid (T1.1)

Programme: H2020-EU.3.3.4. - Topic(s): LCE-01-2016-2017

download deliverable 

Documents, reports 2020-02-27

Analysis of the interaction between Railway Energy and Distribution Networks in terms of flow of electricity challenges and limitations

Assessment of technical and non technical (market, regulatory. Standard…) challenges and limitation for mutual benefit synergies (T4.1)

Programme: H2020-EU.3.3.4. - Topic(s): LCE-01-2016-2017

download deliverable 

Documents, reports 2020-02-27

Report on the existing policy framework

Assessment of current policy framework for promotion of interaction between DN and transport grid – Analysis of EU policies towards grid and electrified transport network losses reduction (T3.2)

Programme: H2020-EU.3.3.4. - Topic(s): LCE-01-2016-2017

download deliverable 

Documents, reports 2020-02-27

Second Release of the “Handbook of the most suitable technologies for electricity losses reduction in DN and Electrified Railway Systems“

Assessment of technologies and methodologies for maximize mutual benefit synergies between the two grids – Focus on progress beyond the State of the art (T2.2)

Programme: H2020-EU.3.3.4. - Topic(s): LCE-01-2016-2017

download deliverable 

Documents, reports 2020-02-27

First Release of the “Handbook of the most suitable technologies for electricity losses reduction in DN and Electrified Railway Systems“

Assessment of technologies and methodologies for maximize mutual benefit synergies between the two grids with a particular focus on losses reduction and state of the art practices (T2.1)

Programme: H2020-EU.3.3.4. - Topic(s): LCE-01-2016-2017

download deliverable 

Documents, reports 2020-02-27

Measures for energy losses prevention in distribution

Assessment of losses on the electricity distribution network and how to work on it with a focus on the potential interconnection with local electrified transport network (T1.2)

Programme: H2020-EU.3.3.4. - Topic(s): LCE-01-2016-2017

download deliverable 

Documents, reports 2020-02-27

Public website set-up

Website content and publication for the presentation of project contents (T6.3)

Programme: H2020-EU.3.3.4. - Topic(s): LCE-01-2016-2017

download deliverable 

Other 2020-02-27

Data Management Plan

Description of data to be monitored and handled in the project, how to handle them internally and externally (T7.1)

Programme: H2020-EU.3.3.4. - Topic(s): LCE-01-2016-2017

download deliverable 

Documents, reports 2020-02-27

Report on integrating storage and LCTs at the SOP

Assessment of storage integration at the SOP to maximize mutual benefit synergies between the two grids towards the reduction of losses. Analysis of how to optimize storage size, installation guidelines and storage management (T1.2)

Programme: H2020-EU.3.3.4. - Topic(s): LCE-01-2016-2017

download deliverable 