The page lists 13 deliverables related to the research project "E-LOBSTER".
title and desprition | type | last update |
---|---|---|
Electrical Energy Storage for Smart Grid and Electrified Transport InteractionSpecification of local energy storage for mutual benefit synergies (definition of type of storage, capacity (energy and power), management to be considered, installation etc. (T2.3) Programme: H2020-EU.3.3.4. - Topic(s): LCE-01-2016-2017 |
Documents, reports | 2020-02-27 |
Leaflet and poster on the projectDissemination material for the presentation of project contents (T6.3) Programme: H2020-EU.3.3.4. - Topic(s): LCE-01-2016-2017 |
Other | 2020-02-27 |
Dissemination PlanMeans of dissemination and communication, targeted audience and objectives to promote project contents (T6.3) Programme: H2020-EU.3.3.4. - Topic(s): LCE-01-2016-2017 |
Documents, reports | 2020-02-27 |
Report on the current operating standardAssessment of current technical framework and standards in both transport grid and DN. It will also describe the regulations to be satisfied by the hardware implementation (T3.1-3.3) Programme: H2020-EU.3.3.4. - Topic(s): LCE-01-2016-2017 |
Documents, reports | 2020-02-27 |
Measures for energy losses prevention in the traction chainAssessment of losses on the electrified transport network and how to work on it with a focus on the potential interconnection with local grid (T1.1) Programme: H2020-EU.3.3.4. - Topic(s): LCE-01-2016-2017 |
Documents, reports | 2020-02-27 |
Analysis of the interaction between Railway Energy and Distribution Networks in terms of flow of electricity challenges and limitationsAssessment of technical and non technical (market, regulatory. Standard…) challenges and limitation for mutual benefit synergies (T4.1) Programme: H2020-EU.3.3.4. - Topic(s): LCE-01-2016-2017 |
Documents, reports | 2020-02-27 |
Report on the existing policy frameworkAssessment of current policy framework for promotion of interaction between DN and transport grid – Analysis of EU policies towards grid and electrified transport network losses reduction (T3.2) Programme: H2020-EU.3.3.4. - Topic(s): LCE-01-2016-2017 |
Documents, reports | 2020-02-27 |
Second Release of the “Handbook of the most suitable technologies for electricity losses reduction in DN and Electrified Railway Systems“Assessment of technologies and methodologies for maximize mutual benefit synergies between the two grids – Focus on progress beyond the State of the art (T2.2) Programme: H2020-EU.3.3.4. - Topic(s): LCE-01-2016-2017 |
Documents, reports | 2020-02-27 |
First Release of the “Handbook of the most suitable technologies for electricity losses reduction in DN and Electrified Railway Systems“Assessment of technologies and methodologies for maximize mutual benefit synergies between the two grids with a particular focus on losses reduction and state of the art practices (T2.1) Programme: H2020-EU.3.3.4. - Topic(s): LCE-01-2016-2017 |
Documents, reports | 2020-02-27 |
Measures for energy losses prevention in distributionAssessment of losses on the electricity distribution network and how to work on it with a focus on the potential interconnection with local electrified transport network (T1.2) Programme: H2020-EU.3.3.4. - Topic(s): LCE-01-2016-2017 |
Documents, reports | 2020-02-27 |
Public website set-upWebsite content and publication for the presentation of project contents (T6.3) Programme: H2020-EU.3.3.4. - Topic(s): LCE-01-2016-2017 |
Other | 2020-02-27 |
Data Management PlanDescription of data to be monitored and handled in the project, how to handle them internally and externally (T7.1) Programme: H2020-EU.3.3.4. - Topic(s): LCE-01-2016-2017 |
Documents, reports | 2020-02-27 |
Report on integrating storage and LCTs at the SOPAssessment of storage integration at the SOP to maximize mutual benefit synergies between the two grids towards the reduction of losses. Analysis of how to optimize storage size, installation guidelines and storage management (T1.2) Programme: H2020-EU.3.3.4. - Topic(s): LCE-01-2016-2017 |
Documents, reports | 2020-02-27 |