The page lists 6 deliverables related to the research project "FITOPTIVIS".
title and desprition | type | last update |
---|---|---|
Public website and social media channels for the projectWebsite and social media channels delivery for dissemination, communication and exchange of data outside and inside the consortium. Task Involved: 8.2 Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-2017-2 |
Websites, patent fillings, videos etc. | 2020-02-18 |
Component models, abstractions, virtualization and methodsThis deliverable will report on models, component abstractions, interfaces and virtualization mechanism. The content of this deliverable will provide the key ingredients to achieve MS3. Task Involved: 2.1 and 2.2 Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-2017-2 |
Documents, reports | 2020-02-18 |
Preliminary Dissemination and Communication plan and reportPlan for the communication and dissemination activities during and after the project lifetime. The first release will define FitOptiVis preliminary plan (which extends and details what it is already contained in this proposal) and report on activities of WP8 till M12. Task Involved: ALL Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-2017-2 |
Documents, reports | 2020-02-18 |
Components Analysis and SpecificationThis deliverable is meant to report the results of the analysis carried out in T5.1 (see Analysis activity) and T5.3 (see Communication backbone configuration activity) on state of the art and commercial SW and HW components with respect to the use case needs and requirements. Task Involved: 5.1 and 5.3 Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-2017-2 |
Documents, reports | 2020-02-18 |
Design-time optimization, deployment and programming strategies V1Report on the activities related to Tasks 3.1-3 regarding i) model-based design and multi-objectves optimization strategies; ii) methods and tools for predicting, simulating and estimating at design-time resource usage; iii) programming and parallelization techniques and iv) coprocessor management. This deliverable contributes to MS3 (M12). Task Involved: All Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-2017-2 |
Documents, reports | 2020-02-18 |
Validation and evaluation strategyIn this document a detailed evaluation and validation strategy is recorded. All project objectives and requirements are covered in KPIs and it is determined in which demonstrations they are measured. Task Involved: 1.3 Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-2017-2 |
Documents, reports | 2020-02-18 |