The page lists 12 deliverables related to the research project "MONOCLE".
title and desprition | type | last update |
---|---|---|
Report on performance criteria for field testingThis report translates stakeholder requirements into a set of field testing criteria: measurement and deployment requirements, in situ performance, operational characteristics and suitability of sensors and platforms that will require testing in WP4 Programme: H2020-EU.3.5.5. - Topic(s): SC5-18-2017 |
Documents, reports | 2020-01-14 |
Report compiling test and validation site characteristicsThis deliverable introduces the test and validation sites in terms of environmental settings, water types, and deployment opportunities so that the consortium can match testing requirements to test sites. Programme: H2020-EU.3.5.5. - Topic(s): SC5-18-2017 |
Documents, reports | 2020-01-14 |
Data management planThe data management plan briefly documents the data production, storage and dissemination architecture foreseen at the start of the project. The data management plan further describes how data generated within the project and obtained from external sources under diverse licenses will be managed so that they are Findable, Accessible, Interoperable, and Re-usable (FAIR). The data management plan shall further satisfy the points made as part of Ethics requirement 3. Programme: H2020-EU.3.5.5. - Topic(s): SC5-18-2017 |
Open Research Data Pilot | 2020-01-14 |
Project WebsiteInitial version of the website. Programme: H2020-EU.3.5.5. - Topic(s): SC5-18-2017 |
Other | 2020-01-14 |
System architecture and standards reportThis deliverable translates the consortium and stakeholder requirements into an outline for the MONOCLE system architecture to be subsequently developed (including implementation of existing solutions). Programme: H2020-EU.3.5.5. - Topic(s): SC5-18-2017 |
Documents, reports | 2020-01-14 |
Report on value-adding algorithms for single sensor and inter-sensor data processingThis report summarises the single sensor and multi-sensor approaches for optimising data volumes and maximising the information retrieval from sensor data streams. Programme: H2020-EU.3.5.5. - Topic(s): SC5-18-2017 |
Documents, reports | 2020-01-14 |
Legacy sensor interface including software library and user interfaceThis deliverable is the working prototype of a low-cost interface board including software library and user interface which enables enhanced connectivity for existing sensors to leverage the enhanced data exchange capabilities of the MONOCLE network. Programme: H2020-EU.3.5.5. - Topic(s): SC5-18-2017 |
Other | 2020-01-14 |
Update 1 of the Data management PlanFirst update of the Data management Plan, a publicly accessible version of the live documentation kept in the project repository. Programme: H2020-EU.3.5.5. - Topic(s): SC5-18-2017 |
Open Research Data Pilot | 2020-01-14 |
Open Data repositoriesTo support open data we will register a data repository to support research findings with digital object identifiers, keep frozen software versions, and act as one of the main data repositories for public data used in the project. MONOCLE will feature more than one data repository, e.g. observation data will be openly available through a web visualisation portal and \'living\' software code will be hosted in private and public repositories. While functionally different, there will be overlap between the data held in these repositories. Programme: H2020-EU.3.5.5. - Topic(s): SC5-18-2017 |
Other | 2020-01-14 |
Report on existing EO services, existing in situ data resources and protocolsThis report reviews existing EO services, existing in situ data resources and protocols used in validation of EO products as a starting point and resource for development in WP7, making sure these developments take full opportunity of existing data sets and procedures. Programme: H2020-EU.3.5.5. - Topic(s): SC5-18-2017 |
Documents, reports | 2020-01-14 |
Report on analysis of the requirements for MONOCLE sensors including projection of cost-savings and stakeholder feedbackReport on analysis of the requirements for MONOCLE sensors, taking input from the advisory panels consultation meeting and translating these into the development requirements for the individual MONOCLE sensors. The report is to include feedback from stakeholders on the conclusions and plans in this report. Programme: H2020-EU.3.5.5. - Topic(s): SC5-18-2017 |
Documents, reports | 2020-01-14 |
MONOCLE sensor integration materialsThis deliverable accompanies D2.2 and represents the physical sensor mounts for drones Programme: H2020-EU.3.5.5. - Topic(s): SC5-18-2017 |
Other | 2020-01-14 |