Explore the words cloud of the SMART Slowflow project. It provides you a very rough idea of what is the project "SMART Slowflow" about.
The following table provides information about the project.
Coordinator |
SMART HYDRO POWER GMBH
Organization address contact info |
Coordinator Country | Germany [DE] |
Project website | https://www.smart-hydro.de/ |
Total cost | 71˙429 € |
EC max contribution | 50˙000 € (70%) |
Programme |
1. H2020-EU.3. (PRIORITY 'Societal challenges) 2. H2020-EU.2.3. (INDUSTRIAL LEADERSHIP - Innovation In SMEs) 3. H2020-EU.2.1. (INDUSTRIAL LEADERSHIP - Leadership in enabling and industrial technologies) |
Code Call | H2020-SMEInst-2018-2020-1 |
Funding Scheme | SME-1 |
Starting year | 2018 |
Duration (year-month-day) | from 2018-06-01 to 2018-11-30 |
Take a look of project's partnership.
# | ||||
---|---|---|---|---|
1 | SMART HYDRO POWER GMBH | DE (FELDAFING (GARATSHAUSEN)) | coordinator | 50˙000.00 |
SMART SlowFlow is a hydro-kinetics micro hydropower solution, developed and patented by Smart Hydro Power and able to reach unparalleled LCOE (20 c€/kWh) and maintenance cost (<0.25 c€/kWh). The hydro-turbine is integrated in the micro grid smart systems produced and already commercialized by Smart Hydro Power in the rural electrification sector (40 grids already sold in Peru, Colombia, Nigeria, Germany, etc.), a booming market set to reach around $23 billion in 2021: by developing the turbine and achieving the cost of production target, SHP is able to propose to the market at an unparalleled price the 100% renewable energy based, reliable and easy to be installed micro-grid for remote areas. The technology has been already validated thanks to the first 280 W prototype, attesting the unparalleled performance in terms of cut-in speed (0.6 m/s), reliability and easiness in transportation and installation. The first patent on turbine design is going to be registered. A preliminary End-Users benefits assessment attests that the simple pay-back time for micro-grid installation is < 2.5 years. Now, to reach the market, the Minimum Viable Product has to be selected in terms of power capacity, the full-integrated micro-grid has to be designed and manufactured, a prototypal manufacturing line (capacity = 1000 units/year) designed and fulfilled. During Phase 1 project, Smart Hydro Power will develop a detailed technical and business feasibility analysis, focused on the supply chain optimization for cost of production reduction, the industrial production design and cost quantification, the customers validation, the analysis of the achievable markets and the refinement of the Business Model to be implemented in the Market Entry phase.
Are you the coordinator (or a participant) of this project? Plaese send me more information about the "SMART SLOWFLOW" project.
For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.
Send me an email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.
Thanks. And then put a link of this page into your project's website.
The information about "SMART SLOWFLOW" are provided by the European Opendata Portal: CORDIS opendata.