Opendata, web and dolomites

SMARTUNNEL SIGNED

The longest-life & energy-saving emergency LED lighting system for underground infrastructures

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 SMARTUNNEL project word cloud

Explore the words cloud of the SMARTUNNEL project. It provides you a very rough idea of what is the project "SMARTUNNEL" about.

visibility    types    ships    uk    batteries    deterioration    fast    curbing    needless    reaching    lit    jobs    installations    thermal    powered    cycles    tunnels    electromagnetic    els    power    reduce    prevents    exhaustion    intentional    interference    conveniently    leads    smartunnel    first    light    when    share    health    force    rail    led    least    unintentional    tunnelling    scenario    off    road    during    wiring    total    intelligent    energy    outage    pilot    longest    interruption    supply    safety    efficiency    savings    keep    refurbishment    installation    life    free    2024    initial    security    excessive    offers    germany    waste    optimisation       switch    turns    discrimination    smart    illumination    21    30    circuits    tunnel    uni    validation    commercialise    3km    amounts    lights    hours    sweden    turned    austria    13    recharging    companies    construction    lighting    agriculture    emergency    consumption    workers    patented    battery    usa    manually    driver    investment    80    market    industry    flicker   

Project "SMARTUNNEL" data sheet

The following table provides information about the project.

Coordinator
A UNI LIGHT LED AB 

Organization address
address: TEGELUDDSVAGEN 31 PL 4
city: STOCKHOLM
postcode: 115 41
website: n.a.

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Sweden [SE]
 Project website http://uni-lightled.com/
 Total cost 71˙429 €
 EC max contribution 50˙000 € (70%)
 Programme 1. H2020-EU.3. (PRIORITY 'Societal challenges)
2. H2020-EU.2.3. (INDUSTRIAL LEADERSHIP - Innovation In SMEs)
3. H2020-EU.2.1. (INDUSTRIAL LEADERSHIP - Leadership in enabling and industrial technologies)
 Code Call H2020-SMEInst-2018-2020-1
 Funding Scheme SME-1
 Starting year 2018
 Duration (year-month-day) from 2018-11-01   to  2019-02-28

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    A UNI LIGHT LED AB SE (STOCKHOLM) coordinator 50˙000.00

Map

 Project objective

During rail and road tunnel construction/refurbishment, the initial investment required for lighting system installation, including emergency lighting systems (ELS) amounts to an average 6% of total tunnel construction cost. Current ELS power supply circuits force lights to remain on for long hours when not needed: when power is turned off manually, existing circuits keep ELS on (powered by batteries). This leads to needless energy consumption and fast battery deterioration. We, at Uni-light LED, have developed Smartunnel, a new smart LED ELS for tunnels under construction/refurbishment, which turns off when light is not needed. Our smart switch and intelligent control allow discrimination between unintentional power outage and intentional interruption, so that emergency lights are lit only under the first scenario. This prevents excessive battery exhaustion/recharging cycles thus making Smartunnel the longest-life ELS on the market (10 years, 80% reduction in battery waste). Smartunnel offers 20-30% increased energy efficiency leading to effective savings of €13,000/3km per year. Our flicker-free and electromagnetic interference-free lights improve visibility and reduce health issues, enhancing safety and security for tunnel workers. Conveniently, Smartunnel can use existing wiring installations to power emergency lights, curbing the cost of new wiring in existing tunnels. We already commercialise 7 lighting product types, based on our patented LED light Driver and Thermal Management Technology for illumination in agriculture, industry and on ships, thus far reaching 100 companies in the UK, Sweden, Germany and Austria. The success of our existing systems has funded Smartunnel development. Following the optimisation of our design into a pilot for phase 2 validation under real conditions. We aim to achieve a tunnelling construction market share of 21 % in Europe as well as 8 % in USA by 2024, creating at least 20 new jobs at Uni-light LED in the process.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "SMARTUNNEL" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "SMARTUNNEL" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.;H2020-EU.2.3.;H2020-EU.2.1.)

Magnesys (2019)

Efficient filtering of metallic impurities in food processing

Read More  

PICSOHF (2020)

PICSOHF, A minimally invasive cardiac intervention medical device to regenerate a damaged heart and extend the life of patients with Heart Failure

Read More  

COUNTMITMENT (2019)

NATURAL CAPITAL ACCOUNTANCY TO IMPROVE REPORTING AND ENVIRONMENTAL PERFORMANCE

Read More