The page lists 10 deliverables related to the research project "SCENE".
title and desprition | type | last update |
---|---|---|
Initial version of service platform modulesThis deliverable will provide the first prototype of SCENE service platform core modules (software), which will cover the service management modules (network access manager and intelligent gateway manager) and caching controller. Programme: H2020-EU.3.;H2020-EU.2.1. - Topic(s): EIC-FTI-2018-2020 |
Other | 2020-02-27 |
Initial Pilot DefinitionPilot description, plan and design will give details about preparation and design of the proposed pilot(s). Programme: H2020-EU.3.;H2020-EU.2.1. - Topic(s): EIC-FTI-2018-2020 |
Documents, reports | 2020-02-27 |
Specification of SCENE security frameworkThis deliverable presents a detailed specification of the SCENE security framework. It addresses both the security services provided by the intelligent gateway to IoT networks and the intelligent gateway self-protection mechanisms. Programme: H2020-EU.3.;H2020-EU.2.1. - Topic(s): EIC-FTI-2018-2020 |
Documents, reports | 2020-02-27 |
Threat analysis and security services descriptionThis deliverable presents the results of a threat analysis (STRIDE-per-interaction) carried out on SCENE communications. From these results, the required SCENE security services are presented. Programme: H2020-EU.3.;H2020-EU.2.1. - Topic(s): EIC-FTI-2018-2020 |
Documents, reports | 2020-02-27 |
Data Management PlanThe Data Management Plan will specify which data generated in the project shall be part of the ORDPilot and how it will be handled within the consortium and later published. Programme: H2020-EU.3.;H2020-EU.2.1. - Topic(s): EIC-FTI-2018-2020 |
Documents, reports | 2020-02-27 |
Innovation Management and IPR GuideDefines rules for handling user data, anonymization and future use. Programme: H2020-EU.3.;H2020-EU.2.1. - Topic(s): EIC-FTI-2018-2020 |
Documents, reports | 2020-02-27 |
Project, Quality and Management ReportIt will set the day-to-day rules of the project as well as the quality assurance and quality control rules both for software and hardware development as well as productization. In addition to this deliverable, first and second periodic reports (M12, M24) and final report (M24) will be produced, as part of official project reporting activities. Programme: H2020-EU.3.;H2020-EU.2.1. - Topic(s): EIC-FTI-2018-2020 |
Documents, reports | 2020-02-27 |
Intelligent Gateway prototype (initial)First version of the product, including optimised CPU, wifi interfaces, and 6LowPAN interface. Programme: H2020-EU.3.;H2020-EU.2.1. - Topic(s): EIC-FTI-2018-2020 |
Demonstrators, pilots, prototypes | 2020-02-27 |
Report on commercial activitiesDeliverable will detail a commercial awareness strategy and a resume of commercial activities in the first half of the project. Programme: H2020-EU.3.;H2020-EU.2.1. - Topic(s): EIC-FTI-2018-2020 |
Documents, reports | 2020-02-27 |
Initial version of system requirements and architecture designProvide a document describing SCENE architecture and the specifications of SCENE components (Initial). Programme: H2020-EU.3.;H2020-EU.2.1. - Topic(s): EIC-FTI-2018-2020 |
Documents, reports | 2020-02-27 |