Opendata, web and dolomites

HBP SGA2 project deliverables

The page lists 25 deliverables related to the research project "HBP SGA2".

 List of Deliverables

HBP SGA2: list of downloadable deliverables.
title and desprition type last update

D8.5.1 Software requirements specifications (SRS) - REPORT

Software requirements specifications (SRS) - REPORT

Programme: H2020-EU.1.2.3. - Topic(s): SGA-FETFLAG-HBP-2017

download deliverable 

Documents, reports 2020-02-25

D9.6.1 SP9 Neuromorphic Computing Platform - Results from SGA2 year 1

The summary of SP 9 results for project months M1-12, broken down by task. WPs involved: WP9.1, WP9.2, WP9.3, WP9.4, WP9.5 and WP9.6 In order to report fully, the Deliverable may need to include information that the SP does not wish to make public at the time of the report. This material will be included in the Deliverable for the EC and Reviewers, but not in the version published publicly.

Programme: H2020-EU.1.2.3. - Topic(s): SGA-FETFLAG-HBP-2017

download deliverable 

Documents, reports 2020-02-25

D6.2.1 CDP2 Annual Compound Deliverable Year 1

Overview of key results and impact achieved in M1-M12, tailored for presentation to the relevant audiences (research/industry/public).
References to HBP/SP/CDP objectives and use cases for navigation between multiple Subprojects.
Linkage of results to components/a set of component factsheets (lower-level information: component ownership, technology readiness level, performed quality control checks, etc.).

Programme: H2020-EU.1.2.3. - Topic(s): SGA-FETFLAG-HBP-2017

download deliverable 

Documents, reports 2020-02-25

D8.1.1 SP8 MIP - Results for SGA2 Year 1

SP8 MIP - Results for SGA2 period 1 SP8 Summary of Results for M1-12: actual vs. planned results o Risks and Issues log updated o Key Results, Impact status & Exceptional Achievements (from users\' perspective) o Dependent results flow (i.e. if/how dependent components were incorporated into the next) o Milestones due and achieved, how validated, by whom o Milestones due but not achieved, why, impact, corrective action o Lessons Learned (and if any incorporated already) o Product Roadmap updated o Platform User feedback on the period o Publications

Programme: H2020-EU.1.2.3. - Topic(s): SGA-FETFLAG-HBP-2017

download deliverable 

Documents, reports 2020-02-25

D9.3.1 PyNN 0.9 on SpiNNaker

As complete a PyNN 0.9 implementation on SpiNNaker as possible (Task 9.3.3)

Programme: H2020-EU.1.2.3. - Topic(s): SGA-FETFLAG-HBP-2017

download deliverable 

Other 2020-02-25

D6.1.1 SP6 Annual Compound Deliverable Year 1

Overview of key results and impact achieved in M1-M12, tailored for presentation to the relevant audiences (research/industry/public).
References to HBP/SP/CDP objectives and use cases for navigation between multiple Subprojects.
Linkage of results to components/a set of component factsheets (lower-level information: component ownership, technology readiness level, performed quality control checks, etc.).

Programme: H2020-EU.1.2.3. - Topic(s): SGA-FETFLAG-HBP-2017

download deliverable 

Documents, reports 2020-02-25

D9.4.1 CDP5-Biological deep learning: Results for SGA2 Year 1

CDP5-Biological deep learning: Results for SGA2 Year 1
CDP5 Annual compound deliverable Year 1 Overview of Key Results and Impact achieved in M1 to M12, tailored for presentation to the relevant audiences (research/industry/public) References to HBP/SP/CDP objectives and Use Cases for navigation between multiple Sub-Projects Linkage of Results to components/a set of component fact sheets (lower level information: Component ownership, Technology Readiness level, performed Quality Control checks, etc.) This deliverable will be a public report including theoretical research on learning principles, their transfer to the HBP computing infrastructures in SP7 and SP9, results of initial experiments and plans for M13 to M24 in SGA2

Programme: H2020-EU.1.2.3. - Topic(s): SGA-FETFLAG-HBP-2017

download deliverable 

Documents, reports 2020-02-25

D5.3.1 New release of interactive spatial alignment tool

We will deploy the 2nd release of the interactive spatial alignment tool started in SGA1. The release will provide a significantly streamlined user interface, especially a much better user experience in terms of landmark management and interactive navigation. (T5.3.3)

Programme: H2020-EU.1.2.3. - Topic(s): SGA-FETFLAG-HBP-2017

download deliverable 

Other 2020-02-25

D12.4.1 Data Policy Manual

Having a set of data-related policies is a requirement for the HBP in order to: -Ensure that expectations with regards to data handling are clear -Comply with all data-related regulations and legislation, in particular those related to data protection -Ensure that all data registered and used in the HBP comply with ethical and other requirements -Demonstrate good management and leadership and implement good practice in data management Milestone verified by upload of the Data Policy Manual.

Programme: H2020-EU.1.2.3. - Topic(s): SGA-FETFLAG-HBP-2017

download deliverable 

Documents, reports 2020-02-25

D10.5.1 SP10 Neurorobotics Platform - Results for SGA2 Year 1

WPs involved: WP10.1, WP10.2, WP10.3, WP10.4 & WP10.5 Summary of SP Results for M1-12, broken down by Task: o Actual vs. planned results (due & done/due & not done) o Results passed to another Task, WP or SP (due & done/due & not done) o Milestones due and achieved, how validated, by whom. o Milestones due but not achieved, why, impact, corrective action o Publications o SP Roadmap for SGA3

Programme: H2020-EU.1.2.3. - Topic(s): SGA-FETFLAG-HBP-2017

download deliverable 

Documents, reports 2020-02-25

D2.1.1 Comparison of Deep-learning based cytoarchitectonic mapping of cortex in the big brain against gold standard cytoarchitectonic map

Deep-learning based cytoarchitectonic mapping of cortex in the big brain and comparison against gold standard cytoarchitectonic map (T2.1.4); map made available in the HBP human brain atlas

Programme: H2020-EU.1.2.3. - Topic(s): SGA-FETFLAG-HBP-2017

download deliverable 

Other 2020-02-25

D2.7.3 CDP3 Results for SGA2 Year 1

CDP3 SGA2 Results Overview Deliverable:
Overview of Key Results achieved in M1 to M12, tailored for presentation to the relevant audiences (research/industry/public)

Programme: H2020-EU.1.2.3. - Topic(s): SGA-FETFLAG-HBP-2017

download deliverable 

Documents, reports 2020-02-25

D9.5.1 Temporal filtering network

Network for temporal filtering running on SpiNNaker (Task 9.5.1)

Programme: H2020-EU.1.2.3. - Topic(s): SGA-FETFLAG-HBP-2017

download deliverable 

Other 2020-02-25

D11.3.4 Short Summary of Infrastructure Voucher Programme

Infrastructure Vouchers calls closed; vouchers assigned to the selected users; budget distribution made; short evaluation summary report (T11.3.4, T11.6.1)

Programme: H2020-EU.1.2.3. - Topic(s): SGA-FETFLAG-HBP-2017

download deliverable 

Documents, reports 2020-02-25

D5.9.1 Strategy and organization of a High-Level Support Team (HLST)

Plan for decision making on the use of resources to achieve the overall goals of the joint platform and organization and coordination of the operations of the HLST.

Programme: H2020-EU.1.2.3. - Topic(s): SGA-FETFLAG-HBP-2017

download deliverable 

Documents, reports 2020-02-25

D7.3.1 Multi-compartment benchmark and validation suites on HPC systems

The validation and benchmark suites for multi- compartment simulators are deployed and their associated documentation can be downloaded from public repositories; the continuous integration framework is publishing up to date validation and benchmark results from HPC systems used in the HBP.

Programme: H2020-EU.1.2.3. - Topic(s): SGA-FETFLAG-HBP-2017

download deliverable 

Other 2020-02-25

D8.3.1 Signed partnership with one European reference network

Signed partnership with one European reference network

Programme: H2020-EU.1.2.3. - Topic(s): SGA-FETFLAG-HBP-2017

download deliverable 

Documents, reports 2020-02-25

D3.6.1 Systems and Cognitive Neuroscience - Results for SGA2 Year 1

WPs involved: WP3.1, WP3.2., WP3.3, WP3.4, WP3.5, WP3.6 Summary of SP3 Results for M1-12, broken down by Task: o Actual vs. planned results (due & done/due & not done) o Results passed to another Task, WP or SP (due & done/due & not done) o CDP products (due & done/due & not done) o Milestones due and achieved, how validated, by whom. o Milestones due but not achieved, why, impact, corrective action o Publications

Programme: H2020-EU.1.2.3. - Topic(s): SGA-FETFLAG-HBP-2017

download deliverable 

Documents, reports 2020-02-25

D5.2.1 Release of updated atlas curation supporting material

Users can access tutorials and SOPs from HBP workbench or request support from UiO atlas curation team (T5.2.2)

Programme: H2020-EU.1.2.3. - Topic(s): SGA-FETFLAG-HBP-2017

download deliverable 

Documents, reports 2020-02-25

D8.6.1 CDP6 Results SGA2 Year 1 Implementation for accurate HPC-based screening protocols of neuro-drug candidates

CDP6 Results SGA2 Year 1 Implementation for accurate HPC-based screening protocols of neuro-drug candidates.
CDP6 Annual compound deliverable Year 1 Overview of Key Results and Impact achieved in M1 to M12, tailored for presentation to the relevant audiences (research/industry/public) References to HBP/SP/CDP objectives and Use Cases for navigation between multiple Sub-Projects Linkage of Results to components/a set of component fact sheets (lower level information: Component ownership, Technology Readiness level, performed Quality Control checks, etc.) This deliverable will also refer to results for SGA2_HPC-based chemical optimisation codes and increasing ligand specificity toward receptors\' subclasses

Programme: H2020-EU.1.2.3. - Topic(s): SGA-FETFLAG-HBP-2017

download deliverable 

Documents, reports 2020-02-25

D8.5.2 Îœedical Informatics Platform Releases - SOFTWARE & REPORT

SOFTWARE & REPORT

Programme: H2020-EU.1.2.3. - Topic(s): SGA-FETFLAG-HBP-2017

download deliverable 

Demonstrators, pilots, prototypes 2020-02-25

D11.2.10 Gender Action Plan

The Gender Action Plan is a required reference document to align structure and processes, objectives and key activities for improved gender equality in HBP with DIR, SIB, GAC, Ethic Board, Education Programme and Subprojects.

Programme: H2020-EU.1.2.3. - Topic(s): SGA-FETFLAG-HBP-2017

download deliverable 

Documents, reports 2020-02-25

D11.1.1 Governance handbook

DIR handbook with procedures to follow regarding internal management, interactions with PCO, with SP Leaders and with Advisory Boards. (T11.1.2)

Programme: H2020-EU.1.2.3. - Topic(s): SGA-FETFLAG-HBP-2017

download deliverable 

Documents, reports 2020-02-25

D9.1.1 Working prototype of a Collaboratory app for graphical model building

Collaboratory app usable by an SP9 member outside the developer team

Programme: H2020-EU.1.2.3. - Topic(s): SGA-FETFLAG-HBP-2017

download deliverable 

Other 2020-02-25

D5.8.1 SP5 Neuroinformatics Platform - Results for SGA2 Year 1

SP5 Neuroinformatics Platform - Results for SGA2 Year 1
Summary of SP Results for M1-12, broken down by Task: o Actual vs. planned results (due & done/due & not done) o Results passed to another Task, WP or SP (due & done/due & not done) o CDP Products (due & done/due & not done) o Milestones due and achieved, how validated, by whom. o Milestones due but not achieved, why, impact, corrective action o Publications o SP Roadmap for SGA2, validated by other SPs receiving inputs from your SP NOTE: In order to report fully on the above topics, the Deliverable may need to include information that we would not wish to make public. This material will be included in the Deliverable for the EC and Reviewers, but not in the version published on the HBP public website.

Programme: H2020-EU.1.2.3. - Topic(s): SGA-FETFLAG-HBP-2017

download deliverable 

Documents, reports 2019-10-29