Opendata, web and dolomites

GRACE project deliverables

The page lists 5 deliverables related to the research project "GRACE".

 List of Deliverables

GRACE: list of downloadable deliverables.
title and desprition type last update

Delivery of wafers carrying SS and PA MMICs

The wafers manufactured using the mask-sets based on MMIC designs from MC2 and CHALMERS will be made available to the partners of the projects. Wafers will be submitted to on-wafer testings and then diced. Some chips will be kept for bare-die characterization and other MMIC’s will be sent to Fraunhofer for packaging. Tracability will be kept between MMICs version and between Run 1 and Run 2 of manufacturing

Programme: H2020-EU.3.4.5.6. - Topic(s): JTI-CS2-2017-CfP07-SYS-01-10

download deliverable 

Other 2020-02-12

CDR Run 1 Report

Designed MMIC’s and packages will be scrutinized from the level of MMIC schematics, layout and simulation performance. The evaluation of simulated performance includes consideration of involved models, small-signal S parameters simulations, Harmonic balance simulations, and EM simulations of passives. The report will include bare-die performance, and a particular focus on the influence from the FOWLP. In this first run the main focus is not on reaching utmost performance of the packaged components, but to understand material system interactions to prepare for high-end performance in the second manufacturing run. The CDR Run 1 will end with the delivery of the stack of GDS files from the design, the different versions and the test patterns as well as the package details. All this material will be documented together with the output from the CDR into a written report

This deliverable is also a milestone, M1

Programme: H2020-EU.3.4.5.6. - Topic(s): JTI-CS2-2017-CfP07-SYS-01-10

download deliverable 

Documents, reports 2020-01-14

Kick-off meeting

Kick-off meeting to inform all partners about management and communication flows in the project.

Programme: H2020-EU.3.4.5.6. - Topic(s): JTI-CS2-2017-CfP07-SYS-01-10

download deliverable 

Documents, reports 2020-01-14

Plan for Communication, Dissemination and Exploitation of project results

The communication plan will contain the plan of communication activities, a plan for dissemination of project results and a plan for exploitation of project results and handling of IP rights linked to project outputs

Programme: H2020-EU.3.4.5.6. - Topic(s): JTI-CS2-2017-CfP07-SYS-01-10

download deliverable 

Documents, reports 2020-01-14

Data Management Plan

The data management plan should include information on:

*The handling of research data during and after the end of the project
*What data will be collected, processed and/or generated
*Which methodology & standards will be applied
*Whether data will be shared/made open access and
*How data will be curated and preserved (including after the end of the project).

Programme: H2020-EU.3.4.5.6. - Topic(s): JTI-CS2-2017-CfP07-SYS-01-10

download deliverable 

Open Research Data Pilot 2020-01-14