Explore the words cloud of the X2Rail-3 project. It provides you a very rough idea of what is the project "X2Rail-3" about.
The following table provides information about the project.
Coordinator |
THALES DEUTSCHLAND GMBH
Organization address contact info |
Coordinator Country | Germany [DE] |
Total cost | 0 € |
EC max contribution | 17˙166˙487 € (0%) |
Programme |
1. H2020-EU.3.4.8.2. (Innovation Programme 2: Advanced traffic management and control systems) |
Code Call | H2020-S2RJU-CFM-2018 |
Funding Scheme | Shift2Rail-IA-LS |
Starting year | 2018 |
Duration (year-month-day) | from 2018-12-01 to 2021-11-30 |
Take a look of project's partnership.
X2RAIL-3 represents the 3rd proposal of the Shift2Rail members in the IP2 “Advanced Traffic Management & Control Systems” domain and it aims to continue the research and development of key technologies within the following Technology Demonstrators (TDs): Adaptable Communications for all Railways (TD2.1 / WP3) – The objective is to demonstrate, via the integration of the different prototypes into dedicated demonstrators, that a new Communication System will be able to overcome the shortcomings in current ETCS and CBTC communications and deliver an adaptable communications system usable for train control applications in all market segments. Moving Block (TD 2.3 / WP4) – the scope is to move beyond the laboratory preparations undertaken in the framework of the X2Rail-1 project and to develop technical demonstrators for suitable railways applications. Zero On-Site Testing (TD 2.6 / WP5) – In the context of the simulation and testing framework integrating new functionalities such as moving block/satellite positioning, finalising the general architecture and will as well perform specific prototypes. Virtually Coupled Train Sets (TD 2.8 / WP6 & WP7) – The action aims to perform a comprehensive study focusing on the new concept of “Virtual coupling”, which foresees that trains will be able to run much closer to one another and to dynamically modify their own composition on the move. Cyber Security (TD 2.11 / WP8 & WP9) – In the context of Cyber Security, the main objectives are to define a “Cyber-Security” System to railway and to contribute to a secure development standard applicable to railway applications. ATO over ETCS pilot test for freight demonstrator (TD 5.6 / WP10) – In the context of freight autonomous train operation, the main objective is to perform field testing with specific focus on freight operational scenarios to get early feedback from the field on potential improvement necessities.
Are you the coordinator (or a participant) of this project? Plaese send me more information about the "X2RAIL-3" project.
For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.
Send me an email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.
Thanks. And then put a link of this page into your project's website.
The information about "X2RAIL-3" are provided by the European Opendata Portal: CORDIS opendata.
Advanced Signalling, Automation and Communication System (IP2 and IP5) – Prototyping the future by means of capacity increase, autonomy and flexible communication
Read More