Opendata, web and dolomites

C2NET project deliverables

The page lists 30 deliverables related to the research project "C2NET".

 List of Deliverables

C2NET: list of downloadable deliverables.
title and desprition type last update

2nd Modular architecture and tools for interoperability

Delivers the final results from Task 3.3

Programme: H2020-EU.2.1.1.;H2020-EU.2.1.5.1. - Topic(s): FoF-01-2014

download deliverable 

Documents, reports 2019-10-08

Industrial Showcase

This deliverable will describe the exploitation material library rationale, structure, addressees and knowledge-based search tool usage.

Programme: H2020-EU.2.1.1.;H2020-EU.2.1.5.1. - Topic(s): FoF-01-2014

download deliverable 

Documents, reports 2019-03-07

Collaborative Manufacturing Business framework

Delivers the results from Task 3.4

Programme: H2020-EU.2.1.1.;H2020-EU.2.1.5.1. - Topic(s): FoF-01-2014

download deliverable 

Other 2019-03-07

2nd Data collection from resources virtualisation

Delivers the final results from Task 3.2

Programme: H2020-EU.2.1.1.;H2020-EU.2.1.5.1. - Topic(s): FoF-01-2014

download deliverable 

Documents, reports 2019-03-06

Road4FAME roadmap analysis

This deliverable will compile, from C2NET point of view, the results of the analysis of the Road4FAME roadmap. In this report new inputs identified in C2NET and not present in Road4FAME roadmap will be also included.

Programme: H2020-EU.2.1.1.;H2020-EU.2.1.5.1. - Topic(s): FoF-01-2014

download deliverable 

Documents, reports 2019-03-06

1st C2NET Dissemination and Exploitation Strategy and Plan

D8.2 will give a detailed outline of planned strategic dissemination as well as will identify and organise the activities to be performed in order to promote the project’s results and the widest dissemination of knowledge from the project. The dissemination strategy and plan will explain:
- What C2NET plan to disseminate – the message
- To whom – the audience
- Why – the purpose
- How – the method
- When – the timing
Moreover, the deliverable will describe the overall exploitation strategy, business model for C2NET and dimensions for exploitation initiatives characterisation and qualification.

Programme: H2020-EU.2.1.1.;H2020-EU.2.1.5.1. - Topic(s): FoF-01-2014

download deliverable 

Documents, reports 2019-03-06

C2NET Fact sheet and powerpoint presentation

This report includes a fact sheet and a power point presentation introducing C2NET project.

Programme: H2020-EU.2.1.1.;H2020-EU.2.1.5.1. - Topic(s): FoF-01-2014

download deliverable 

Documents, reports 2019-03-06

Optimization and simulation algorithms for CMPL: specifications, development and validation

This deliverable will be composed of two parts: First part will consist in a technical report with a full description of the new optimization/simulation methods and algorithms partial or completely developed as well as those collected to address CMPL come from WP1 identified requirements and the specific needs of Pilots resulting from WP7. Second part will include the algorithms source code.

Programme: H2020-EU.2.1.1.;H2020-EU.2.1.5.1. - Topic(s): FoF-01-2014

download deliverable 

Documents, reports 2019-03-06

2nd C2NET dissemination activities

This report will contain the main dissemination activities performed and the definition of a number of performance indicators for measuring the impact and efficiency of the proposed C2NET dissemination strategy and plan. Moreover, it will contain the information related to the C2NET eNewsletters that will be delivered quarterly and will provide highly specialized information about the significant progresses and results of the project addressed to a highly targeted audience.

Programme: H2020-EU.2.1.1.;H2020-EU.2.1.5.1. - Topic(s): FoF-01-2014

download deliverable 

Documents, reports 2019-03-06

1st C2NET Exploitation Business Model and Users Contrasts

This report will outline the procedures followed to prepare project specific business contrasts to analyze the exploitation potential of the proposed results.

Programme: H2020-EU.2.1.1.;H2020-EU.2.1.5.1. - Topic(s): FoF-01-2014

download deliverable 

Documents, reports 2019-03-06

1st C2NET Portal

This document will show the setting up of the C2NET Web Page and the different areas created to firstly give visibility to the project and secondly, encourage the collaboration among the C2NET project members

Programme: H2020-EU.2.1.1.;H2020-EU.2.1.5.1. - Topic(s): FoF-01-2014

download deliverable 

Websites, patent fillings, videos etc. 2019-03-06

2nd C2NET Portal

This document will show the setting up of the C2NET Web Page and the different areas created to firstly give visibility to the project and secondly, encourage the collaboration among the C2NET project members

Programme: H2020-EU.2.1.1.;H2020-EU.2.1.5.1. - Topic(s): FoF-01-2014

download deliverable 

Websites, patent fillings, videos etc. 2019-03-06

1st Modular architecture and tools for interoperability

Delivers the first results from Task 3.3

Programme: H2020-EU.2.1.1.;H2020-EU.2.1.5.1. - Topic(s): FoF-01-2014

download deliverable 

Documents, reports 2019-05-30

Selected legacy systems / interfaces that will be supported by the interoperability framework

This report will describe the existing standards/legacy interfaces for communication, data collection and exchange formats, data base etc. that will be supported allowing to ensure interoperability to most prominent business intelligence SW, enterprise service buses, manufacturing execution, SCADA, etc.

Programme: H2020-EU.2.1.1.;H2020-EU.2.1.5.1. - Topic(s): FoF-01-2014

download deliverable 

Documents, reports 2019-03-06

Catalogue of existing pilots, large demos and competence centers that are relevant for C2NET

This report will review and catalogue existing and on-going large/scale pilots (i.e. in the context of FITMAN – FIRE – Future Internet, any national pilots and/or FoF competence centers through I4MS) that are relevant for C2NET

Programme: H2020-EU.2.1.1.;H2020-EU.2.1.5.1. - Topic(s): FoF-01-2014

download deliverable 

Documents, reports 2019-03-06

Industrial scenarios addressed by C2NET Platform

Report which includes a taxonomy of main industrial scenarios that will be covered by the C2NET platform.

Programme: H2020-EU.2.1.1.;H2020-EU.2.1.5.1. - Topic(s): FoF-01-2014

download deliverable 

Documents, reports 2019-03-06

1st C2NET dissemination activities

This report will contain the main dissemination activities performed and the definition of a number of performance indicators for measuring the impact and efficiency of the proposed C2NET dissemination strategy and plan. Moreover, it will contain the information related to the C2NET eNewsletters that will be delivered quarterly and will provide highly specialized information about the significant progresses and results of the project addressed to a highly targeted audience.

Programme: H2020-EU.2.1.1.;H2020-EU.2.1.5.1. - Topic(s): FoF-01-2014

download deliverable 

Documents, reports 2019-03-06

1st Socio-economic impact assessment

This deliverable will describe the assessment of the current and potential socio-economic impact of C2NET project.

Programme: H2020-EU.2.1.1.;H2020-EU.2.1.5.1. - Topic(s): FoF-01-2014

download deliverable 

Documents, reports 2019-03-06

White Paper of C2Net platform / openness and portability

This white paper will define the IT infrastructure requirements (i.e. communication, computing), portability and openness of the C2Net platform ahead of its implementation

Programme: H2020-EU.2.1.1.;H2020-EU.2.1.5.1. - Topic(s): FoF-01-2014

download deliverable 

Documents, reports 2019-03-06

1st Data collection from resources virtualisation

Delivers the first results from Task 3.2

Programme: H2020-EU.2.1.1.;H2020-EU.2.1.5.1. - Topic(s): FoF-01-2014

download deliverable 

Documents, reports 2019-03-06

Taxonomy of optimization and simulation solutions for Manufacturing and Logistics Processes

Report with an exhaustive analysis of existing literature about different methods and optimization/simulation approaches to deal with main Collaborative Manufacturing and Logistics Processes addressed identified in WP1.

Programme: H2020-EU.2.1.1.;H2020-EU.2.1.5.1. - Topic(s): FoF-01-2014

download deliverable 

Documents, reports 2019-03-06

State of Play of related projects including IPR

This report will compile all projects related to C2NET, indicating why they are relevant to the project and which is the current status.

Programme: H2020-EU.2.1.1.;H2020-EU.2.1.5.1. - Topic(s): FoF-01-2014

download deliverable 

Documents, reports 2019-03-06

1st Data collection from real-world resources

Delivers the first results from Task 3.1

Programme: H2020-EU.2.1.1.;H2020-EU.2.1.5.1. - Topic(s): FoF-01-2014

download deliverable 

Documents, reports 2019-03-06

2nd C2NET Dissemination and Exploitation Strategy and Plan

D8.2 will give a detailed outline of planned strategic dissemination as well as will identify and organise the activities to be performed in order to promote the project’s results and the widest dissemination of knowledge from the project. The dissemination strategy and plan will explain:
- What C2NET plan to disseminate – the message
- To whom – the audience
- Why – the purpose
- How – the method
- When – the timing
Moreover, the deliverable will describe the overall exploitation strategy, business model for C2NET and dimensions for exploitation initiatives characterisation and qualification.

Programme: H2020-EU.2.1.1.;H2020-EU.2.1.5.1. - Topic(s): FoF-01-2014

download deliverable 

Documents, reports 2019-03-06

C2NET Platform validation scenarios

Technical report with a description of general specifications of each industrial pilot to test the feasibility and functionality of C2NET platform.

Programme: H2020-EU.2.1.1.;H2020-EU.2.1.5.1. - Topic(s): FoF-01-2014

download deliverable 

Documents, reports 2019-03-06

3rd C2NET Portal

This document will show the setting up of the C2NET Web Page and the different areas created to firstly give visibility to the project and secondly, encourage the collaboration among the C2NET project members.

Programme: H2020-EU.2.1.1.;H2020-EU.2.1.5.1. - Topic(s): FoF-01-2014

download deliverable 

Websites, patent fillings, videos etc. 2019-03-06

2nd C2NET Exploitation Business Model and Users Contrasts

This report will outline the procedures followed to prepare project specific business contrasts to analyze the exploitation potential of the proposed results.

Programme: H2020-EU.2.1.1.;H2020-EU.2.1.5.1. - Topic(s): FoF-01-2014

download deliverable 

Documents, reports 2019-03-06

2nd Data collection from real-world resources

Delivers the Final Results from Task 3.1

Programme: H2020-EU.2.1.1.;H2020-EU.2.1.5.1. - Topic(s): FoF-01-2014

download deliverable 

Documents, reports 2019-03-06

3rd C2NET dissemination activities

This report will contain the main dissemination activities performed and the definition of a number of performance indicators for measuring the impact and efficiency of the proposed C2NET dissemination strategy and plan. Moreover, it will contain the information related to the C2NET eNewsletters that will be delivered quarterly and will provide highly specialized information about the significant progresses and results of the project addressed to a highly targeted audience.

Programme: H2020-EU.2.1.1.;H2020-EU.2.1.5.1. - Topic(s): FoF-01-2014

download deliverable 

Documents, reports 2019-03-06

2nd Socio-economic impact assessment

This deliverable will describe the assessment of the current and potential socio-economic impact of C2NET project.

Programme: H2020-EU.2.1.1.;H2020-EU.2.1.5.1. - Topic(s): FoF-01-2014

download deliverable 

Documents, reports 2019-03-06