The page lists 35 deliverables related to the research project "BioMOre".
title and desprition | type | last update |
---|---|---|
Report on activities of the press bureau including media monitoring reportReport on activities of the press bureau including media monitoring report Programme: H2020-EU.3.5.3. - Topic(s): SC5-11a-2014 |
Documents, reports | 2019-11-20 |
Report on “Results of PLS pre-concentration, product recovery and effluent treatment“.Report on “Results of PLS pre-concentration, product recovery and effluent treatment“. Programme: H2020-EU.3.5.3. - Topic(s): SC5-11a-2014 |
Documents, reports | 2019-11-20 |
Data from laboratory tests simulating anoxic, high-temperature and pressure oxidative dissolution on copper-bearing kupferschiefer rock strataData from laboratory tests simulating anoxic, high-temperature and pressure oxidative dissolution on copper-bearing kupferschiefer rock strata Programme: H2020-EU.3.5.3. - Topic(s): SC5-11a-2014 |
Documents, reports | 2019-11-20 |
Identification of effective and appropriate approaches to eliminate bacteria introduced during active bioleaching from deep-buried oresIdentification of effective and appropriate approaches to eliminate bacteria introduced during active bioleaching from deep-buried ores Programme: H2020-EU.3.5.3. - Topic(s): SC5-11a-2014 |
Documents, reports | 2019-11-20 |
Report on “Iron utilization, toxic element removal, and water balance improvementsâ€Report on “Iron utilization, toxic element removal, and water balance improvements†Programme: H2020-EU.3.5.3. - Topic(s): SC5-11a-2014 |
Documents, reports | 2019-11-20 |
Site selection and drillingSite selection and drilling Programme: H2020-EU.3.5.3. - Topic(s): SC5-11a-2014 |
Documents, reports | 2019-11-20 |
Identification of potential zones where the process can be implemented in phase IIIdentification of potential zones where the process can be implemented in phase II Programme: H2020-EU.3.5.3. - Topic(s): SC5-11a-2014 |
Documents, reports | 2019-11-20 |
Effects of the conditions anticipated in deep-buried fractured kupferschiefer ore body (temperature, pressure and dissolved solutes) on bioleaching microorganismsEffects of the conditions anticipated in deep-buried fractured kupferschiefer ore body (temperature, pressure and dissolved solutes) on bioleaching microorganisms Programme: H2020-EU.3.5.3. - Topic(s): SC5-11a-2014 |
Documents, reports | 2019-11-20 |
Impact of in-situ leaching from a stimulated ore body on the sustainability of the industry based on evaluated indicator values.Impact of in-situ leaching from a stimulated ore body on the sustainability of the industry based on evaluated indicator values. Programme: H2020-EU.3.5.3. - Topic(s): SC5-11a-2014 |
Documents, reports | 2019-11-20 |
Report summarising dialogue activities and results with user groupsReport summarising dialogue activities and results with user groups Programme: H2020-EU.3.5.3. - Topic(s): SC5-11a-2014 |
Documents, reports | 2019-11-20 |
Minutes annual meetingsMinutes annual meetings Programme: H2020-EU.3.5.3. - Topic(s): SC5-11a-2014 |
Documents, reports | 2019-11-20 |
Fracking and installation of bioreactorsFracking and installation of bioreactors Programme: H2020-EU.3.5.3. - Topic(s): SC5-11a-2014 |
Documents, reports | 2019-11-20 |
CAPEX/OPEX analysis and assessment of the entire metal leaching and recovery processCAPEX/OPEX analysis and assessment of the entire metal leaching and recovery process Programme: H2020-EU.3.5.3. - Topic(s): SC5-11a-2014 |
Documents, reports | 2019-11-20 |
Economic evaluation of coupled chemical-biochemical underground block-leaching scenariosEconomic evaluation of coupled chemical-biochemical underground block-leaching scenarios Programme: H2020-EU.3.5.3. - Topic(s): SC5-11a-2014 |
Documents, reports | 2019-11-20 |
Summary report scale up and leaching efficiency evaluation reportSummary report scale up and leaching efficiency evaluation report Programme: H2020-EU.3.5.3. - Topic(s): SC5-11a-2014 |
Documents, reports | 2019-11-20 |
Look-up tables for frac permeability, leaching efficiency and operational and investment costLook-up tables for frac permeability, leaching efficiency and operational and investment cost Programme: H2020-EU.3.5.3. - Topic(s): SC5-11a-2014 |
Other | 2019-11-20 |
Stimulation design and cost reportStimulation design and cost report Programme: H2020-EU.3.5.3. - Topic(s): SC5-11a-2014 |
Documents, reports | 2019-11-20 |
Report summarising capacity buildings activities and resultsReport summarising capacity buildings activities and results Programme: H2020-EU.3.5.3. - Topic(s): SC5-11a-2014 |
Documents, reports | 2019-11-20 |
Environmental impacts from a future full-scale production facility based on in-situ leaching from a stimulated ore bodyEnvironmental impacts from a future full-scale production facility based on in-situ leaching from a stimulated ore body Programme: H2020-EU.3.5.3. - Topic(s): SC5-11a-2014 |
Documents, reports | 2019-11-20 |
Brochures, leaflets and newsletter and filmBrochures, leaflets and newsletter and film Programme: H2020-EU.3.5.3. - Topic(s): SC5-11a-2014 |
Websites, patent fillings, videos etc. | 2019-11-20 |
Overall systems model for bioleaching on local scale incorporating the results of the process models of BRGM and CNRS together with the model parameter databaseOverall systems model for bioleaching on local scale incorporating the results of the process models of BRGM and CNRS together with the model parameter database Programme: H2020-EU.3.5.3. - Topic(s): SC5-11a-2014 |
Other | 2019-11-20 |
Economic evaluation of consequences of dynamic risk variation over the life of investmentEconomic evaluation of consequences of dynamic risk variation over the life of investment Programme: H2020-EU.3.5.3. - Topic(s): SC5-11a-2014 |
Documents, reports | 2019-11-20 |
BioMOre WebsiteBioMOre Website Programme: H2020-EU.3.5.3. - Topic(s): SC5-11a-2014 |
Websites, patent fillings, videos etc. | 2019-11-20 |
Corporate design manualCorporate design manual Programme: H2020-EU.3.5.3. - Topic(s): SC5-11a-2014 |
Documents, reports | 2019-11-20 |
Report on stakeholder assessment processed during two stakeholders workshopsReport on stakeholder assessment processed during two stakeholders workshops Programme: H2020-EU.3.5.3. - Topic(s): SC5-11a-2014 |
Documents, reports | 2019-11-20 |
Minutes kick-off meetingMinutes kick-off meeting Programme: H2020-EU.3.5.3. - Topic(s): SC5-11a-2014 |
Documents, reports | 2019-11-20 |
Established social media representationEstablished social media representation Programme: H2020-EU.3.5.3. - Topic(s): SC5-11a-2014 |
Websites, patent fillings, videos etc. | 2019-11-20 |
Selection of indicators and site baseline conditionsSelection of indicators and site baseline conditions Programme: H2020-EU.3.5.3. - Topic(s): SC5-11a-2014 |
Documents, reports | 2019-11-20 |
Review of legislation and BREF documents including legal barriers against the technology and recommendations for adaptation of the technology and/or legislation needed for the environmentally safe technology exploitationReview of legislation and BREF documents including legal barriers against the technology and recommendations for adaptation of the technology and/or legislation needed for the environmentally safe technology exploitation Programme: H2020-EU.3.5.3. - Topic(s): SC5-11a-2014 |
Documents, reports | 2019-11-20 |
Correlating permeability with leach efficiencyCorrelating permeability with leach efficiency Programme: H2020-EU.3.5.3. - Topic(s): SC5-11a-2014 |
Documents, reports | 2019-11-20 |
Site selection and parameter database reportSite selection and parameter database report Programme: H2020-EU.3.5.3. - Topic(s): SC5-11a-2014 |
Documents, reports | 2019-11-20 |
Geological model, deposit block model and reservoir model reportGeological model, deposit block model and reservoir model report Programme: H2020-EU.3.5.3. - Topic(s): SC5-11a-2014 |
Documents, reports | 2019-11-20 |
Report on “Most cost-effective flowsheet for an industrial scale BioMOre operation“Report on “Most cost-effective flowsheet for an industrial scale BioMOre operation“ Programme: H2020-EU.3.5.3. - Topic(s): SC5-11a-2014 |
Documents, reports | 2019-11-20 |
Report on dissemination, exploitation and communication strategyReport on dissemination, exploitation and communication strategy Programme: H2020-EU.3.5.3. - Topic(s): SC5-11a-2014 |
Documents, reports | 2019-11-20 |
Results of assessments made for the underground test facility and the outcome of the stakeholder seminars/workshopsResults of assessments made for the underground test facility and the outcome of the stakeholder seminars/workshops Programme: H2020-EU.3.5.3. - Topic(s): SC5-11a-2014 |
Documents, reports | 2019-11-20 |