The page lists 31 deliverables related to the research project "Do CHANGE".
title and desprition | type | last update |
---|---|---|
The Identity and Permissions Management Framework Design - Version 2Software for The Identity and Permissions Management Framework Design - Version 2 Programme: H2020-EU.3.1.4. - Topic(s): PHC-26-2014 |
Documents, reports | 2019-04-29 |
Third-cycle completion report including final video of all scenariosWP2 will follow an iterative, cyclic process with three cycles of one year each. The process guarantees that not only the tools + services are refined and developed from concept to practical usage and evaluation, but simultaneously the mutual understanding of the partners\' values, ways of working and limitations is refined and developed as well. This final deliverable, consisting of a report and a video, will be the result of the third cycle, after the third year. Programme: H2020-EU.3.1.4. - Topic(s): PHC-26-2014 |
Documents, reports | 2019-04-29 |
Dissemination and networking report (b)This deliverable will report on the dissemination and networking activities carried out in the second half of the project. Programme: H2020-EU.3.1.4. - Topic(s): PHC-26-2014 |
Documents, reports | 2019-04-29 |
Second evaluation report for the testing in controlled environmentsThe full ecosystem will first be tested in the controlled environments before going into Phase 2 pilot with real patients. Programme: H2020-EU.3.1.4. - Topic(s): PHC-26-2014 |
Documents, reports | 2019-04-29 |
Final specifications of tools and servicesThis deliverable is the final report of detailed specifcations for the tools and services such as have been refined and will be evaluated, based on the various methods in finding the technical and non-technical requirements. This deliverable will be the third one. Programme: H2020-EU.3.1.4. - Topic(s): PHC-26-2014 |
Documents, reports | 2019-04-29 |
Dissemination and networking report (a)This deliverable will report on the dissemination and networking activities carried out up to half way the project. It will be followed by a similar report for the second half of the project. Programme: H2020-EU.3.1.4. - Topic(s): PHC-26-2014 |
Documents, reports | 2019-04-29 |
Optimised calibration and accuracy of sensorsThe sensors will be tested and calibrated, such that they will ensure accuracy and specificity, as well as accurate operability. The results will be accurate sensors. Programme: H2020-EU.3.1.4. - Topic(s): PHC-26-2014 |
Documents, reports | 2019-04-29 |
Final report on cost/benefit analyses of introducing Do CHANGEFinal report on cost/benefit analyses of introducing Do CHANGE Programme: H2020-EU.3.1.4. - Topic(s): PHC-26-2014 |
Documents, reports | 2019-04-29 |
First explorations of cost/benefit analyses of introducing (parts of) the DoCHANGE ecosystem – version 2This report is the exploration of costs/benefit analysis of the DoCHANGE service. Programme: H2020-EU.3.1.4. - Topic(s): PHC-26-2014 |
Documents, reports | 2019-04-29 |
Cross-pilot sites deployment plansThe deliverable will report the cross-pilot deployment plans, which will be defined including detailed planning of pilot set-up, resource planning and establishment of appropriate setting for operation support. Programme: H2020-EU.3.1.4. - Topic(s): PHC-26-2014 |
Documents, reports | 2019-04-29 |
Cross-pilot sites deployment plans - Phase 2This report is the Local Medical Ethical Committee, informed consent form and recruitment strategies for phase 2 trials, due 30 April 2017. Programme: H2020-EU.3.1.4. - Topic(s): PHC-26-2014 |
Documents, reports | 2019-04-29 |
Second version of the Do CHANGE evaluation frameworkThis deliverable will report on the second stage of the evaluation execution, following the guidelines defined at T6.2 by the Do CHANGE Evaluation Framework. In general the information gathered by the indicators will compare the data gathered at a baseline measurement in order to be able to assign the changes caused by the deployment of the Do CHANGE proposed solutions. In the deliverable the different levels of refinement will be compared. Programme: H2020-EU.3.1.4. - Topic(s): PHC-26-2014 |
Documents, reports | 2019-04-29 |
Local Medical Ethical Committee, informed consent and recruitment strategies - Phase 2This is an update of the deliverable for Phase 1, and will contain the requests for the Local Medical Ethical Committees including the detailed interventions in Phase 2. Programme: H2020-EU.3.1.4. - Topic(s): PHC-26-2014 |
Documents, reports | 2019-04-29 |
Local Medical Ethical Committee, informed consent form and recruitment strategiesThe requests for the approval by the Local Medical Ethical Committee will be made, the informed consent form and recruitment strategies determined and reported in this deliverable. Programme: H2020-EU.3.1.4. - Topic(s): PHC-26-2014 |
Documents, reports | 2019-04-29 |
First explorations of cost/benefit analyses of introducing (parts of) the Do CHANGE ecosystemThis report will collect first explorations of cost/benefit analyses of introducing (parts of) the Do CHANGE ecosystem Programme: H2020-EU.3.1.4. - Topic(s): PHC-26-2014 |
Documents, reports | 2019-04-29 |
First evaluation report for the testing in controlled environmentsThis first evaluation report will describe the results of the following testing: At M12 the deployment of the tools will occur in the test lab of SmH. The testing of the tools in the controlled environment of SmH will last up to M16. Further reporting of the laboratory testing, following the methodology defined in T6.1 will be developed in the context of T6.5 and will be used as input for T2.3, in time to be integrated in D2.3. Programme: H2020-EU.3.1.4. - Topic(s): PHC-26-2014 |
Documents, reports | 2019-04-29 |
Phase 1 Evaluation ReportThis report will contain the results after three and six months of all patients in the first phase evaluation, ending in Dec. 2017. In general the information gathered by the indicators will compare the data gathered at a baseline measurement in order to be able to assign the changes caused by the deployment of the Do CHANGE proposed solutions. Programme: H2020-EU.3.1.4. - Topic(s): PHC-26-2014 |
Documents, reports | 2019-04-29 |
Final evaluation reportThis deliverable will be the final evaluation report on the clinical trials summarizing the results in each of the dimensions of the Do CHANGE evaluation framework and, in particular, including a discussion of the evidence of impact of the proposed solution over the common practice. Programme: H2020-EU.3.1.4. - Topic(s): PHC-26-2014 |
Documents, reports | 2019-04-29 |
Testing methodology in controlled environmentsThis deliverable will describe the testing methodology for the first testing in a controlled environment (a laboratory setting). Programme: H2020-EU.3.1.4. - Topic(s): PHC-26-2014 |
Documents, reports | 2019-04-29 |
Detailed specifications of tools and servicesBased on the various methods in finding the technical and non-technical requirements a report of detailed specifications will be made for the tools and services to be developed. This deliverable will be the first and be followed by a revised and final set of detailed specifications. Programme: H2020-EU.3.1.4. - Topic(s): PHC-26-2014 |
Documents, reports | 2019-04-29 |
Do CHANGE Application Programming Interfaces Design – Phase 1First phase of the Do Change Application Programming Interfaces Design Programme: H2020-EU.3.1.4. - Topic(s): PHC-26-2014 |
Documents, reports | 2019-04-29 |
The Identity and Permissions Management Framework Design - Version 1The Identity and Permissions Management Framework Design Programme: H2020-EU.3.1.4. - Topic(s): PHC-26-2014 |
Documents, reports | 2019-04-29 |
First-cycle completion report including integrated use casesWP2 will follow an iterative, cyclic process with three cycles of one year each. The process guarantees that not only the tools + services are refined and developed from concept to practical usage and evaluation, but simultaneously the mutual understanding of the partners\' values, ways of working and limitations is refined and developed as well. This deliverable, consisting of a report and a video, will be the result of the first cycle, after the first year. Programme: H2020-EU.3.1.4. - Topic(s): PHC-26-2014 |
Documents, reports | 2019-04-29 |
Project presentation website and leafletFor information on the project, a website and leaflet will be produced at the very beginning of the project. Programme: H2020-EU.3.1.4. - Topic(s): PHC-26-2014 |
Websites, patent fillings, videos etc. | 2019-04-29 |
First version of the Do CHANGE evaluation frameworkThis deliverable is the first version of the Do CHANGE evaluation framework. It will be constructed upon the evaluation framework of the EIP-AHA which will allow extrapolation to EU perspective and will therefore consist on a set of criteria, guidelines methods and tools that will ensure that the evaluation activities of the Do CHANGE project will provide insights into the impacts of deploying the tools + services to be developed during the project timeframe. Programme: H2020-EU.3.1.4. - Topic(s): PHC-26-2014 |
Documents, reports | 2019-04-29 |
Ethical and legal manualEthical and legal issues derived from the planned interventions in the three pilot sites will be analysed and documented in this ethical and legal manual that will define the project strategy in this regard to address any issue that could be raised during the project lifecycle. For this deliverable also privacy impact assessments will be carried out for the Do CHANGE applications. Programme: H2020-EU.3.1.4. - Topic(s): PHC-26-2014 |
Documents, reports | 2019-04-29 |
Overall Do CHANGE ecosystem infrastructure architecture, including DDS and ecosystem component framework – Version 2Overall Do CHANGE ecosystem infrastructure architecture, including DDS and ecosystem component framework Programme: H2020-EU.3.1.4. - Topic(s): PHC-26-2014 |
Documents, reports | 2019-04-29 |
Explorations of sensor technologyThis deliverable will contain the results of the first stage technology explorations, selection and proof of concept. CET, ITRI, TUE together with ONMI will explore sensor technologies using led, inductance or other techniques and CET will assess feasibility based on Service Oriented Architecture (SOA) and capabilities. Programme: H2020-EU.3.1.4. - Topic(s): PHC-26-2014 |
Documents, reports | 2019-04-29 |
Second-cycle completion report including video of all scenariosWP2 will follow an iterative, cyclic process with three cycles of one year each. The process guarantees that not only the tools + services are refined and developed from concept to practical usage and evaluation, but simultaneously the mutual understanding of the partners\' values, ways of working and limitations is refined and developed as well. This deliverable, consisting of a report and a video, will be the result of the second cycle, after the second year. Programme: H2020-EU.3.1.4. - Topic(s): PHC-26-2014 |
Documents, reports | 2019-04-29 |
Revised specifications of tools and servicesBased on the various methods in finding the technical and non-technical requirements a report of detailed specifications will be made for the tools and services to be developed. This deliverable will be the second and be followed by a final set of detailed specifications. Programme: H2020-EU.3.1.4. - Topic(s): PHC-26-2014 |
Documents, reports | 2019-04-29 |
Overall Do CHANGE ecosystem infrastructure architectureOverall Do CHANGE ecosystem infrastructure architecture Programme: H2020-EU.3.1.4. - Topic(s): PHC-26-2014 |
Documents, reports | 2019-04-29 |