The page lists 38 deliverables related to the research project "SUPERSEDE".
title and desprition | type | last update |
---|---|---|
Periodic activity report, v1Containing an overview of the activities carried out during the reporting period: the progress in relation to the project objectives, the progress towards the milestones and deliverables set for the period, and any problems encountered and corrective actions taken. It also includes a detailed justification of the costs incurred and of the resources deployed by each partner linking them to activities implemented and justifying their necessity, a publishable executive summary and, as an Annex, an updated Plan for using and disseminating the knowledge. Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014 |
Documents, reports | 2019-04-29 |
Data management, v1This deliverable includes a description of the data characteristics, design of the ontology and links between the data sources (T2.1) as well as architectural design of the repository (T2.2). It includes a systematic selection of tools, with special focus on: those that can be used from the open source community; and those that need to be developed as part of the project. Thus showing the feasibility to implement the data management methods. Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014 |
Documents, reports | 2019-04-29 |
Feedback-gathering and monitoring reconfiguration techniques , v1This deliverable includes a description of the problem of feedback gathering reconfiguration and of candidate solution approaches, which can be applied to the methods and techniques developed in WP1 for feedback gathering and monitoring. This deliverables reports results of both T4.3, and T4.4. Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014 |
Documents, reports | 2019-04-29 |
Methods and tools to enact software evolution, v3This deliverable includes an updated version of D4.2 (i.e., updated state of the art, techniques, etc.) and the second release of the proof of concept software implementations of T4.1. Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014 |
Demonstrators, pilots, prototypes | 2019-04-29 |
Requirements and architecture for the integration framework, 3This report provides a first revision of the functional and technical specification of the tool suite, which addresses the recommendations provided after the first UC validation. It also provides the first revision of the architectural design that accomodates amended or new requested functionality. Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014 |
Documents, reports | 2019-04-29 |
DM processes, v1This deliverable will include models of selected DM processes in software evolution and adaptation produced in T3.2. Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014 |
Documents, reports | 2019-04-29 |
Methods and Techniques for runtime DM, v2This deliverable, produced by T3.4, will provide a description of techniques for supporting decision-making in software evolution and adaptation (including personalization) at runtime. Proof of concept software implementations are part of this deliverable. The deliverable will include a discussion on the release history. Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014 |
Demonstrators, pilots, prototypes | 2019-04-29 |
Methods and Techniques for runtime DM, v1This deliverable, produced by T3.4, will provide a description of techniques for supporting decision-making in software evolution and adaptation (including personalization) at runtime. Proof of concept software implementations are part of this deliverable. Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014 |
Demonstrators, pilots, prototypes | 2019-04-29 |
Final activity reportA final activity report, covering main aspects of the work, objectives, results and conclusions, including the publishable results of the final plan for using and disseminating the knowledge and the claimed costs of all the partners in an aggregate form covering the entire duration of the project, including the last reporting period. Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014 |
Documents, reports | 2019-04-29 |
Tool suite implementation, v2This deliverable provides the first prototype of the tool suite implementation, including the integration framework developed in T5.3 and the front-end developed in T5.4. This suite provides an implementation of the functionality collected in D5.2 Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014 |
Demonstrators, pilots, prototypes | 2019-04-29 |
Direct multi-modal feedback gathering techniques, v1This deliverable will provide tool-supported multimodal feedback approaches that will allow end-users to document and communicate feedback in situ. It will be produced by T1.2. Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014 |
Demonstrators, pilots, prototypes | 2019-04-29 |
Data management, v3This deliverable includes a description of the data characteristics, design of the ontology and links between the data sources (T2.1) as well as architectural design of the repository and performance tests (T2.2). It includes the implementation of a prototype and benchmarks showing the feasibility of the data management methods. Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014 |
Demonstrators, pilots, prototypes | 2019-04-29 |
Tool suite implementation, v3This deliverable provides the second prototype of the tool suite implementation, including the integration framework developed in T5.3 and the front-end developed in T5.4. This suite provides an implementation of the functionality collected in D5.3. Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014 |
Demonstrators, pilots, prototypes | 2019-04-29 |
Methods and tools to enact software evolution, v1Methods and tools to enact software evolution, v1 [9] This deliverable includes a descriptions of the state of the art techniques used for evolution planning, a description of the techniques defined in SUPERSEDE for the software evolution planning. Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014 |
Documents, reports | 2019-04-29 |
Data management, v2This deliverable includes a description of the data characteristics, design of the ontology and links between the data sources (T2.1) as well as architectural design of the repository and performance tests (T2.2). It includes the implementation of a prototype showing the feasibility of the data management methods. Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014 |
Demonstrators, pilots, prototypes | 2019-04-29 |
Comprehensive monitoring techniques, v1This deliverable will provide techniques to manage and instrument the different monitors and sensors in a comprehensive monitoring solution. It will be produced by T1.3. Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014 |
Demonstrators, pilots, prototypes | 2019-04-29 |
Methods and tools to enact software adaptation and personalization, v1This deliverable includes a descriptions of the state of the art techniques used for runtime adaptation and personalization, a description of the techniques used in SUPERSEDE for adaptation and personalization. Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014 |
Documents, reports | 2019-04-29 |
DM processes, v2This is a joint deliverable of tasks T3.1 and T3.2. The deliverable will include models of selected DM processes in software evolution and adaptation produced in T3.2. Updates on requirements for SUPERSEDE tools produced in T3.1 upon the input from validation activities, as well as updates on DM processes, are foreseen along the project. Proof of concepts implementation of DM process models will be delivered. Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014 |
Demonstrators, pilots, prototypes | 2019-04-29 |
Methods and tools to enact software evolution, v2This deliverable includes an updated version of D4.1 (i.e., updated state of the art, techniques, etc.) and the first release of the proof of concept software implementations of T4.1. Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014 |
Demonstrators, pilots, prototypes | 2019-04-29 |
Methods and tools to enact software adaptation and personalization, v3This deliverable includes an updated version of D4.5 (i.e., updated state of the art, techniques, etc.) and the second release of the proof of concept software implementations of T4.2. Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014 |
Demonstrators, pilots, prototypes | 2019-04-29 |
Dissemination Plan, v2This deliverable will be an update of the Dissemination Plan at M36. Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014 |
Documents, reports | 2019-04-29 |
DSS for software evolution, v2This deliverable will include both description of the techniques used for the DSS and proof of concept software implementations, produced by T3.3. The deliverable will include a discussion on the release history. Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014 |
Demonstrators, pilots, prototypes | 2019-04-29 |
IPR PlanA description of the information and procedures related to the IPR and knowledge management and protection, produced by Task T7.4. Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014 |
Documents, reports | 2019-04-29 |
Data analysis, v1This deliverable includes a description of the techniques used for the analysis of (1) multi-modal feedback (T2.3), (2) user sessions and profiles (T2.4), and (3) user feedback together with context information (T2.5). The subsequent releases will take into account results collected through the UC validations. Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014 |
Demonstrators, pilots, prototypes | 2019-04-29 |
Comprehensive monitoring techniques, v2This deliverable will provide techniques to manage and instrument the different monitors and sensors in a comprehensive monitoring solution. It will be produced by T1.3. Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014 |
Demonstrators, pilots, prototypes | 2019-04-29 |
Project websiteA project website will be developed by Task T7.1 and made ready at an early stage of the project in order to reach the highest number of stakeholders. The Project website will be constantly updated including information about dissemination activities to be carried out by the consortium and public deliverables. Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014 |
Websites, patent fillings, videos etc. | 2019-04-29 |
Periodic activity report, v2Containing an overview of the activities carried out during the reporting period: the progress in relation to the project objectives, the progress towards the milestones and deliverables set for the period, and any problems encountered and corrective actions taken. It also includes a detailed justification of the costs incurred and of the resources deployed by each partner linking them to activities implemented and justifying their necessity, a publishable executive summary and, as an Annex, an updated Plan for using and disseminating the knowledge. Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014 |
Documents, reports | 2019-04-29 |
Risk management planResult of T8.3, reports analysis for risk management and planned management procedures Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014 |
Documents, reports | 2019-04-29 |
Feedback-gathering and monitoring reconfiguration techniques, v3This deliverable includes an updated version of D4.8, and the second release of the proof of concept software implementations realised in T4.3 and T4.4. Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014 |
Demonstrators, pilots, prototypes | 2019-04-29 |
Dissemination Plan, v1This report will contain the dissemination plan (T7.1) and results of dissemination activities (T7.2) of the IES Cities Project results among different communities. Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014 |
Documents, reports | 2019-04-29 |
Feedback management and monitoring approachesThis deliverable, produced by T1.1, will contain an evaluation of relevant feedback management, monitoring approaches and online sources for feedback, which will provide information for selecting baseline methods and techniques to be considered in the project. Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014 |
Documents, reports | 2019-04-29 |
Data analysis, v2This deliverable includes a description of the techniques used for the analysis of (1) multi-modal feedback (T2.3), (2) user sessions and profiles (T2.4), and (3) user feedback together with context information (T2.5). Moreover, it contains proof of concept software implementations and results collected through the UC validations. Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014 |
Demonstrators, pilots, prototypes | 2019-04-29 |
Methods and tools to enact software adaptation and personalization, v2This deliverable includes an updated version of D4.4 (i.e., updated state of the art, techniques, etc.) and the first release of the proof of concept software implementations of T4.2. Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014 |
Demonstrators, pilots, prototypes | 2019-04-29 |
Feedback-gathering and monitoring reconfiguration techniques, v2This deliverable includes an updated version of D4.7, and the first release of the proof of concept software implementations realised in T4.3 and T4.4. Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014 |
Demonstrators, pilots, prototypes | 2019-04-29 |
Direct multi-modal feedback gathering techniques, v2This deliverable will provide tool-supported multimodal feedback approaches that will allow end-users to document and communicate feedback in situ. Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014 |
Demonstrators, pilots, prototypes | 2019-04-29 |
Requirements for methods and toolsThis deliverable will include a survey on state of the art DSS and automated reasoning approaches in SE, which will be performed in T3.1. Moreover, it will provide user requirements for the methods and tools that will be developed in SUPERSEDE, based on the UCs analysis performed in T3.1, and a description of contextual data and user feedback. Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014 |
Documents, reports | 2019-04-29 |
Tool suite implementation, v4This deliverable provides the final prototype of the tool suite implementation. Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014 |
Demonstrators, pilots, prototypes | 2019-04-29 |
DSS for software evolution, v1This deliverable will include both description of the techniques used for the DSS and proof of concept software implementations, produced by T3.3. Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014 |
Demonstrators, pilots, prototypes | 2019-04-29 |