Opendata, web and dolomites

SUPERSEDE project deliverables

The page lists 38 deliverables related to the research project "SUPERSEDE".

 List of Deliverables

SUPERSEDE: list of downloadable deliverables.
title and desprition type last update

Periodic activity report, v1

Containing an overview of the activities carried out during the reporting period: the progress in relation to the project objectives, the progress towards the milestones and deliverables set for the period, and any problems encountered and corrective actions taken. It also includes a detailed justification of the costs incurred and of the resources deployed by each partner linking them to activities implemented and justifying their necessity, a publishable executive summary and, as an Annex, an updated Plan for using and disseminating the knowledge.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014

download deliverable 

Documents, reports 2019-04-29

Data management, v1

This deliverable includes a description of the data characteristics, design of the ontology and links between the data sources (T2.1) as well as architectural design of the repository (T2.2). It includes a systematic selection of tools, with special focus on: those that can be used from the open source community; and those that need to be developed as part of the project. Thus showing the feasibility to implement the data management methods.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014

download deliverable 

Documents, reports 2019-04-29

Feedback-gathering and monitoring reconfiguration techniques , v1

This deliverable includes a description of the problem of feedback gathering reconfiguration and of candidate solution approaches, which can be applied to the methods and techniques developed in WP1 for feedback gathering and monitoring. This deliverables reports results of both T4.3, and T4.4.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014

download deliverable 

Documents, reports 2019-04-29

Methods and tools to enact software evolution, v3

This deliverable includes an updated version of D4.2 (i.e., updated state of the art, techniques, etc.) and the second release of the proof of concept software implementations of T4.1.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014

download deliverable 

Demonstrators, pilots, prototypes 2019-04-29

Requirements and architecture for the integration framework, 3

This report provides a first revision of the functional and technical specification of the tool suite, which addresses the recommendations provided after the first UC validation. It also provides the first revision of the architectural design that accomodates amended or new requested functionality.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014

download deliverable 

Documents, reports 2019-04-29

DM processes, v1

This deliverable will include models of selected DM processes in software evolution and adaptation produced in T3.2.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014

download deliverable 

Documents, reports 2019-04-29

Methods and Techniques for runtime DM, v2

This deliverable, produced by T3.4, will provide a description of techniques for supporting decision-making in software evolution and adaptation (including personalization) at runtime. Proof of concept software implementations are part of this deliverable. The deliverable will include a discussion on the release history.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014

download deliverable 

Demonstrators, pilots, prototypes 2019-04-29

Methods and Techniques for runtime DM, v1

This deliverable, produced by T3.4, will provide a description of techniques for supporting decision-making in software evolution and adaptation (including personalization) at runtime. Proof of concept software implementations are part of this deliverable.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014

download deliverable 

Demonstrators, pilots, prototypes 2019-04-29

Final activity report

A final activity report, covering main aspects of the work, objectives, results and conclusions, including the publishable results of the final plan for using and disseminating the knowledge and the claimed costs of all the partners in an aggregate form covering the entire duration of the project, including the last reporting period.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014

download deliverable 

Documents, reports 2019-04-29

Tool suite implementation, v2

This deliverable provides the first prototype of the tool suite implementation, including the integration framework developed in T5.3 and the front-end developed in T5.4. This suite provides an implementation of the functionality collected in D5.2

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014

download deliverable 

Demonstrators, pilots, prototypes 2019-04-29

Direct multi-modal feedback gathering techniques, v1

This deliverable will provide tool-supported multimodal feedback approaches that will allow end-users to document and communicate feedback in situ. It will be produced by T1.2.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014

download deliverable 

Demonstrators, pilots, prototypes 2019-04-29

Data management, v3

This deliverable includes a description of the data characteristics, design of the ontology and links between the data sources (T2.1) as well as architectural design of the repository and performance tests (T2.2). It includes the implementation of a prototype and benchmarks showing the feasibility of the data management methods.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014

download deliverable 

Demonstrators, pilots, prototypes 2019-04-29

Tool suite implementation, v3

This deliverable provides the second prototype of the tool suite implementation, including the integration framework developed in T5.3 and the front-end developed in T5.4. This suite provides an implementation of the functionality collected in D5.3.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014

download deliverable 

Demonstrators, pilots, prototypes 2019-04-29

Methods and tools to enact software evolution, v1

Methods and tools to enact software evolution, v1 [9] This deliverable includes a descriptions of the state of the art techniques used for evolution planning, a description of the techniques defined in SUPERSEDE for the software evolution planning.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014

download deliverable 

Documents, reports 2019-04-29

Data management, v2

This deliverable includes a description of the data characteristics, design of the ontology and links between the data sources (T2.1) as well as architectural design of the repository and performance tests (T2.2). It includes the implementation of a prototype showing the feasibility of the data management methods.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014

download deliverable 

Demonstrators, pilots, prototypes 2019-04-29

Comprehensive monitoring techniques, v1

This deliverable will provide techniques to manage and instrument the different monitors and sensors in a comprehensive monitoring solution. It will be produced by T1.3.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014

download deliverable 

Demonstrators, pilots, prototypes 2019-04-29

Methods and tools to enact software adaptation and personalization, v1

This deliverable includes a descriptions of the state of the art techniques used for runtime adaptation and personalization, a description of the techniques used in SUPERSEDE for adaptation and personalization.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014

download deliverable 

Documents, reports 2019-04-29

DM processes, v2

This is a joint deliverable of tasks T3.1 and T3.2. The deliverable will include models of selected DM processes in software evolution and adaptation produced in T3.2. Updates on requirements for SUPERSEDE tools produced in T3.1 upon the input from validation activities, as well as updates on DM processes, are foreseen along the project. Proof of concepts implementation of DM process models will be delivered.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014

download deliverable 

Demonstrators, pilots, prototypes 2019-04-29

Methods and tools to enact software evolution, v2

This deliverable includes an updated version of D4.1 (i.e., updated state of the art, techniques, etc.) and the first release of the proof of concept software implementations of T4.1.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014

download deliverable 

Demonstrators, pilots, prototypes 2019-04-29

Methods and tools to enact software adaptation and personalization, v3

This deliverable includes an updated version of D4.5 (i.e., updated state of the art, techniques, etc.) and the second release of the proof of concept software implementations of T4.2.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014

download deliverable 

Demonstrators, pilots, prototypes 2019-04-29

Dissemination Plan, v2

This deliverable will be an update of the Dissemination Plan at M36.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014

download deliverable 

Documents, reports 2019-04-29

DSS for software evolution, v2

This deliverable will include both description of the techniques used for the DSS and proof of concept software implementations, produced by T3.3. The deliverable will include a discussion on the release history.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014

download deliverable 

Demonstrators, pilots, prototypes 2019-04-29

IPR Plan

A description of the information and procedures related to the IPR and knowledge management and protection, produced by Task T7.4.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014

download deliverable 

Documents, reports 2019-04-29

Data analysis, v1

This deliverable includes a description of the techniques used for the analysis of (1) multi-modal feedback (T2.3), (2) user sessions and profiles (T2.4), and (3) user feedback together with context information (T2.5). The subsequent releases will take into account results collected through the UC validations.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014

download deliverable 

Demonstrators, pilots, prototypes 2019-04-29

Comprehensive monitoring techniques, v2

This deliverable will provide techniques to manage and instrument the different monitors and sensors in a comprehensive monitoring solution. It will be produced by T1.3.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014

download deliverable 

Demonstrators, pilots, prototypes 2019-04-29

Project website

A project website will be developed by Task T7.1 and made ready at an early stage of the project in order to reach the highest number of stakeholders. The Project website will be constantly updated including information about dissemination activities to be carried out by the consortium and public deliverables.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014

download deliverable 

Websites, patent fillings, videos etc. 2019-04-29

Periodic activity report, v2

Containing an overview of the activities carried out during the reporting period: the progress in relation to the project objectives, the progress towards the milestones and deliverables set for the period, and any problems encountered and corrective actions taken. It also includes a detailed justification of the costs incurred and of the resources deployed by each partner linking them to activities implemented and justifying their necessity, a publishable executive summary and, as an Annex, an updated Plan for using and disseminating the knowledge.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014

download deliverable 

Documents, reports 2019-04-29

Risk management plan

Result of T8.3, reports analysis for risk management and planned management procedures

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014

download deliverable 

Documents, reports 2019-04-29

Feedback-gathering and monitoring reconfiguration techniques, v3

This deliverable includes an updated version of D4.8, and the second release of the proof of concept software implementations realised in T4.3 and T4.4.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014

download deliverable 

Demonstrators, pilots, prototypes 2019-04-29

Dissemination Plan, v1

This report will contain the dissemination plan (T7.1) and results of dissemination activities (T7.2) of the IES Cities Project results among different communities.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014

download deliverable 

Documents, reports 2019-04-29

Feedback management and monitoring approaches

This deliverable, produced by T1.1, will contain an evaluation of relevant feedback management, monitoring approaches and online sources for feedback, which will provide information for selecting baseline methods and techniques to be considered in the project.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014

download deliverable 

Documents, reports 2019-04-29

Data analysis, v2

This deliverable includes a description of the techniques used for the analysis of (1) multi-modal feedback (T2.3), (2) user sessions and profiles (T2.4), and (3) user feedback together with context information (T2.5). Moreover, it contains proof of concept software implementations and results collected through the UC validations.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014

download deliverable 

Demonstrators, pilots, prototypes 2019-04-29

Methods and tools to enact software adaptation and personalization, v2

This deliverable includes an updated version of D4.4 (i.e., updated state of the art, techniques, etc.) and the first release of the proof of concept software implementations of T4.2.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014

download deliverable 

Demonstrators, pilots, prototypes 2019-04-29

Feedback-gathering and monitoring reconfiguration techniques, v2

This deliverable includes an updated version of D4.7, and the first release of the proof of concept software implementations realised in T4.3 and T4.4.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014

download deliverable 

Demonstrators, pilots, prototypes 2019-04-29

Direct multi-modal feedback gathering techniques, v2

This deliverable will provide tool-supported multimodal feedback approaches that will allow end-users to document and communicate feedback in situ.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014

download deliverable 

Demonstrators, pilots, prototypes 2019-04-29

Requirements for methods and tools

This deliverable will include a survey on state of the art DSS and automated reasoning approaches in SE, which will be performed in T3.1. Moreover, it will provide user requirements for the methods and tools that will be developed in SUPERSEDE, based on the UCs analysis performed in T3.1, and a description of contextual data and user feedback.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014

download deliverable 

Documents, reports 2019-04-29

Tool suite implementation, v4

This deliverable provides the final prototype of the tool suite implementation.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014

download deliverable 

Demonstrators, pilots, prototypes 2019-04-29

DSS for software evolution, v1

This deliverable will include both description of the techniques used for the DSS and proof of concept software implementations, produced by T3.3.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014

download deliverable 

Demonstrators, pilots, prototypes 2019-04-29