Opendata, web and dolomites

RAGE project deliverables

The page lists 52 deliverables related to the research project "RAGE".

 List of Deliverables

RAGE: list of downloadable deliverables.
title and desprition type last update

D6.2 Summary, Analysis, Road-mapping and Production of Training materials

D6.2 Summary, Analysis, Road-mapping and Production of Training materials
Delivery date: M48

An intermediate version of this deliverable is labelled D6.6 Preliminary Summary, Analysis, Road-mapping and Production of Training materials, due: M17

Programme: H2020-EU.2.1.1.4. - Topic(s): ICT-21-2014

download deliverable 

Documents, reports 2019-09-09

D5.4 Pilots quality report round 2

D5.4 Pilots quality report round 2
Delivery date: M47 (all tasks). Responsible: OKKAM

Programme: H2020-EU.2.1.1.4. - Topic(s): ICT-21-2014

download deliverable 

Documents, reports 2019-09-09

D1.2 Asset integration methodology

D1.2 Asset integration methodology
Delivery date: M43 (tasks 1.2, 1.4); responsible UOB

Programme: H2020-EU.2.1.1.4. - Topic(s): ICT-21-2014

download deliverable 

Documents, reports 2019-09-09

D4.1 RAGE Asset Review

D4.1 RAGE Asset Review. Covering input and feedback on asset description, functionality, technical constraints, reusability and considerations by the game developer partners.
Delivery date: M47 (tasks 4.1). Responsible: PLAYGEN

Programme: H2020-EU.2.1.1.4. - Topic(s): ICT-21-2014

download deliverable 

Documents, reports 2019-09-09

D8.4 Second RAGE Evaluation Report

D8.4 Second RAGE Evaluation Report
Delivery date: M47 (tasks 8.3, 8.4, 8.5); Responsible TUGRAZ

Programme: H2020-EU.2.1.1.4. - Topic(s): ICT-21-2014

download deliverable 

Documents, reports 2019-09-09

D6.5 SNA and discourse analysis

D6.5 SNA-based Community Support and Collaboration Mediation tools available and integrated with Ecosystem
Delivery date: M40. Responsible: UPB

Programme: H2020-EU.2.1.1.4. - Topic(s): ICT-21-2014

download deliverable 

Other 2019-09-09

D9.4 Launch Plan for the RAGE Ecosystem Authority

D9.4 Launch Plan for the RAGE Ecosystem Authority This report describes the governance and sustainability models, as well as the description of the programme for the formal launching of the organisation tasked with its administration, operation and maintenance of the RAGE virtual centre of excellence infrastructure.
Delivery date: M48; Responsible INMARK

Programme: H2020-EU.2.1.1.4. - Topic(s): ICT-21-2014

download deliverable 

Documents, reports 2019-09-09

D1.3 Two-level authoring widget software and documentation

D1.3 Two-level authoring widget software and documentation
Delivery date: M48 (task 1.5); SU

Programme: H2020-EU.2.1.1.4. - Topic(s): ICT-21-2014

download deliverable 

Other 2019-09-09

First version exploitation plan

Intermediate version of deliverable D9.3

Programme: H2020-EU.2.1.1.4. - Topic(s): ICT-21-2014

download deliverable 

Documents, reports 2019-09-09

D7.4 Potential business models report

D7.4 Report with proposition of potential business models
Delivery Date M24; Responsible UOB

Programme: H2020-EU.2.1.1.4. - Topic(s): ICT-21-2014

download deliverable 

Documents, reports 2019-09-09

D7.5 Processes in to proposed business models report

D7.5 Report synthesis of processes in to proposed business models for Leisure and Non-Leisure games development industries.
Delivery Date M36; Responsible UOB

Programme: H2020-EU.2.1.1.4. - Topic(s): ICT-21-2014

download deliverable 

Documents, reports 2019-09-09

Project Quality Assurance Handbook

Procedural document

Programme: H2020-EU.2.1.1.4. - Topic(s): ICT-21-2014

download deliverable 

Documents, reports 2019-09-09

Management report 2

Reporting periods M18-M6

Programme: H2020-EU.2.1.1.4. - Topic(s): ICT-21-2014

download deliverable 

Documents, reports 2019-09-09

D7.6 RAGE asset-based business case

D7.6 Develop asset based business case for Leisure games development industries access via web based resource located within the RAGE repository.
Deliver Date M40; Responsible UOB

Programme: H2020-EU.2.1.1.4. - Topic(s): ICT-21-2014

download deliverable 

Documents, reports 2019-09-09

D3.4 Final social gamification assets.

D3.4 Final social gamification assets. Social gamification assets integrated in the repository with docu-mentation and authoring and configuration tools. RAGE ecosystem fully gamified.
Delivery date: M36 (tasks 3.6). Responsible: UOB

Programme: H2020-EU.2.1.1.4. - Topic(s): ICT-21-2014

download deliverable 

Other 2019-09-09

D2.5 First bundle of dashboard components

D2.5 First bundle of dashboard components: Specification, initial visualizations, design of specific analyses.
Delivery date: M19(task 2.4) , Responsible: UCM

Programme: H2020-EU.2.1.1.4. - Topic(s): ICT-21-2014

download deliverable 

Other 2019-09-09

D8.2 Evaluation Asset

D8.2 Evaluation Asset – Conceptual Approach and Implementation
Delivery date: M22 (task 8.2); Responsible TUGRAZ

Programme: H2020-EU.2.1.1.4. - Topic(s): ICT-21-2014

download deliverable 

Other 2019-09-09

D8.3 First RAGE Evaluation Report

D8.3 First RAGE Evaluation Report
Delivery date: M33 (tasks 8.3, 8.4, 8.5); Responsible TUGRAZ

Programme: H2020-EU.2.1.1.4. - Topic(s): ICT-21-2014

download deliverable 

Documents, reports 2019-09-09

D3.2 Final integrated bundle of core social agency assets

D3.2 Final integrated bundle of core social agency assets. Core assets integrated in the repository with documentation and authoring and configuration tools.
Delivery date: M24 (tasks 3.1, 3.2, 3.3 and 3.4). Responsible: INESC-ID

Programme: H2020-EU.2.1.1.4. - Topic(s): ICT-21-2014

download deliverable 

Other 2019-09-09

D2.1 First bundle of server-side components: Specification, use cases and prototypes of the core assets.

D2.1 First bundle of server-side components: Specification, use cases and prototypes of the core assets.
Delivery date: M16 (tasks 2.1, 2.2, 2.3), Responsible: UCM

Programme: H2020-EU.2.1.1.4. - Topic(s): ICT-21-2014

download deliverable 

Other 2019-09-09

D6.3 Semantic Content Annotation Support

D6.3 Semantic Annotation Support of Ecosystem Content available
Delivery date: M20. Responsible: FTK

Programme: H2020-EU.2.1.1.4. - Topic(s): ICT-21-2014

download deliverable 

Other 2019-09-09

First version scenario arrangement document - round 1

Inermediate version preceding deliverable D5.1

Programme: H2020-EU.2.1.1.4. - Topic(s): ICT-21-2014

download deliverable 

Documents, reports 2019-09-09

D9.1 RAGE Dissemination Plan

D9.1 RAGE Dissemination Plan. This report will document the plans to disseminate RAGE results, and, in the successive editions, the description of actions already performed and their results.
Delivery date: M3 (updates in M14,M26,M38,M48); Responsible INMARK

Programme: H2020-EU.2.1.1.4. - Topic(s): ICT-21-2014

download deliverable 

Documents, reports 2019-09-09

D9.3 Exploitation Plan

D9.3 Exploitation Plan. This report will include the design of the legal entity governing the future operation of the RAGE ecosystem.
Delivery date: M42; Responsible INMARK

Programme: H2020-EU.2.1.1.4. - Topic(s): ICT-21-2014

download deliverable 

Documents, reports 2019-09-09

D3.5 First storytelling framework

D3.5 First storytelling framework. Specification and prototype with a mock-up scenario.
Delivery date: M18 (tasks 3.5 and 3.7). Responsible: INESC-ID

Programme: H2020-EU.2.1.1.4. - Topic(s): ICT-21-2014

download deliverable 

Other 2019-09-09

D4.4 Final version of game applications for scenario pilot

D4.4 Final version of game applications for scenario pilots – refinement and delivery support of games and gamifications based on the feedback from 1st round of pilotting and formative evaluation, leading to the 2nd round of pilloting and validation.
Delivery date: M38 (tasks 4.2 and 4.3). Responsible: PLAYGEN

Programme: H2020-EU.2.1.1.4. - Topic(s): ICT-21-2014

download deliverable 

Other 2019-09-09

D5.2 Scenario Arrangement document – round 2

D5.2 Scenario Arrangement document – round 2
Delivery date: M37 (all tasks). Responsible: OKKAM

Programme: H2020-EU.2.1.1.4. - Topic(s): ICT-21-2014

download deliverable 

Documents, reports 2019-09-09

D7.2 Summary report of Value Chain analysis

D7.2 Summary report of Value Chain analysis fro the Leisure and Non-Leisure game development Industries
Delivery date: M12; Responsible INMARK

Programme: H2020-EU.2.1.1.4. - Topic(s): ICT-21-2014

download deliverable 

Documents, reports 2019-09-09

D2.6 Final bundle of dashboard components

Delivery date: M19(task 2.4) , Responsible: UCM
D2.6 Final bundle of dashboard components: Core assets in final form with documentation and samples. M38 (task 2.4) , Responsible: UCM

Programme: H2020-EU.2.1.1.4. - Topic(s): ICT-21-2014

download deliverable 

Other 2019-09-09

First version Applied gaming asset methodology

Intermediate version of deliverable D1.1.

Programme: H2020-EU.2.1.1.4. - Topic(s): ICT-21-2014

download deliverable 

Documents, reports 2019-09-09

D6.1 Ecosystem software platform

D6.1 Ecosystem software platform with underlying Software Repository, Digital Library and Media Archive available for collection of content
Delivery date: M12. Responsible: FTK

Programme: H2020-EU.2.1.1.4. - Topic(s): ICT-21-2014

download deliverable 

Other 2019-09-09

Preliminary Summary, Analysis, Road-mapping and Production of Training materials

This deliverable D6.6 was added to allow for releasing an intermediate version of D6.2 Summary, Analysis, Road-mapping and Production of Training materials
Delivery date: M48 (intermediate version M17)

Programme: H2020-EU.2.1.1.4. - Topic(s): ICT-21-2014

download deliverable 

Documents, reports 2019-09-09

D6.4 Ecosystem integration

D6.4 Ecosystem Software Repository, Digital Library, Media Archive, Interactive Map and Online Training Portal populated with content and online
Delivery date: M36. Responsible: FTK

Programme: H2020-EU.2.1.1.4. - Topic(s): ICT-21-2014

download deliverable 

Other 2019-09-09

D7.3 Summary report RAGE stakeholder consultation process

D7.3 Summary report and synthesis of RAGE Stakeholder consultation process
Delivery date: M16; Responsible UOB

Programme: H2020-EU.2.1.1.4. - Topic(s): ICT-21-2014

download deliverable 

Documents, reports 2019-09-09

D7.1 Summary report of business models

Deliverables
D7.1 Summary report of business models for the Leisure and Non-Leisure game development Industries.
Delivery date: M12; Responsible UOB

Programme: H2020-EU.2.1.1.4. - Topic(s): ICT-21-2014

download deliverable 

Documents, reports 2019-09-09

D1.1 Applied gaming asset methodology

D1.1 Applied gaming asset methodology
Delivery date: M29 (tasks 1.1, 1.2, 1.3); responsible OUNL

Programme: H2020-EU.2.1.1.4. - Topic(s): ICT-21-2014

download deliverable 

Documents, reports 2019-09-09

Research data management plan

Personal data management procedures for privacy protection

Programme: H2020-EU.2.1.1.4. - Topic(s): ICT-21-2014

download deliverable 

Documents, reports 2019-09-09

Management Report 1

Reporting period M1-M18

Programme: H2020-EU.2.1.1.4. - Topic(s): ICT-21-2014

download deliverable 

Documents, reports 2019-09-09

D4.3 Initial version of game applications for scenario pilots

D4.3 Initial version of game applications for scenario pilots – development and delivery support of pilot games and gamifications using the reusable assets, ready for first round of pilotting and formative evaluation (for 1st round of pilotting in WP5) (Task 4.2 and 4.3).
Delivery date: M22 (tasks 4.2 and 4.3). Responsible: PLAYGEN

Programme: H2020-EU.2.1.1.4. - Topic(s): ICT-21-2014

download deliverable 

Other 2019-09-09

D2.3 First bundle of client-side components

D2.3 First bundle of client-side components: Specification, sample scenarios and mockup libraries for development for the thee target platforms.
Delivery date: M17 (tasks 2.1, 2.2, 2.3) , Responsible: UCM

Programme: H2020-EU.2.1.1.4. - Topic(s): ICT-21-2014

download deliverable 

Other 2019-09-09

D9.2 RAGE website

D9.2 RAGE website. The project website will provide project overviews and highlights; up-to-date infor-mation on intermediate and final project results, including public reports and publications as well as synthesis reports drawn from selected confidential material; project events, including e.g. user group meetings, conferences and workshops; contact details, etc.
Delivery date: M3; Responsible INMARK

Programme: H2020-EU.2.1.1.4. - Topic(s): ICT-21-2014

download deliverable 

Websites, patent fillings, videos etc. 2019-09-09

D8.1 RAGE Evaluation Framework and Guidelines

D8.1 RAGE Evaluation Framework and Guidelines
Delivery date: M12 (task 8.1); Responsible TUGRAZ

Programme: H2020-EU.2.1.1.4. - Topic(s): ICT-21-2014

download deliverable 

Documents, reports 2019-09-09

D2.4 Final bundle of client-side components

D2.4 Final bundle of client-side components: Core assets in final form with documentation and samples. M31 (tasks 2.1, 2.2, 2.3) , Responsible: UCM

Programme: H2020-EU.2.1.1.4. - Topic(s): ICT-21-2014

download deliverable 

Other 2019-09-09

D3.3 First social gamification assets

D3.3 First social gamification assets. Specification, use cases and prototypes of the social gamification assets. Mock-up of the RAGE ecosystem gamification.
Delivery date: M18 (tasks 3.6). Responsible: UOB

Programme: H2020-EU.2.1.1.4. - Topic(s): ICT-21-2014

download deliverable 

Other 2019-09-09

Second version exploitation plan

Intermediate version of D9.3

Programme: H2020-EU.2.1.1.4. - Topic(s): ICT-21-2014

download deliverable 

Documents, reports 2019-09-09

D2.2 Final bundle of server-side components: Core assets in final form with documentation and samples.

D2.2 Final bundle of server-side components: Core assets in final form with documentation and samples. M30 (tasks 2.1, 2.2, 2.3), Responsible: UCM

Programme: H2020-EU.2.1.1.4. - Topic(s): ICT-21-2014

download deliverable 

Other 2019-09-09

D5.3 Pilots quality report round 1

D5.3 Pilots quality report round 1
Delivery date: M32 (all tasks). Responsible: OKKAM

Programme: H2020-EU.2.1.1.4. - Topic(s): ICT-21-2014

download deliverable 

Documents, reports 2019-09-09

D3.1 First bundle of core social agency assets

D3.1 First bundle of core social agency assets. Specification, use cases and prototypes of the core assets.
Delivery date: M18 (tasks 3.1, 3.2, 3.3 and 3.4). Responsible: INESC-ID

Programme: H2020-EU.2.1.1.4. - Topic(s): ICT-21-2014

download deliverable 

Other 2019-09-09

D3.6 Final storytelling framework.

D3.6 Final storytelling framework. Storytelling framework integrated in the repository with documentation, complete authoring tool and sample stories.
Delivery date: M34 (tasks 3.5 and 3.7). Responsible: INESC-ID

Programme: H2020-EU.2.1.1.4. - Topic(s): ICT-21-2014

download deliverable 

Other 2019-09-09

D5.1 Scenario Arrangement document – round 1

D5.1 Scenario Arrangement document – round 1
Delivery date: M21 (all tasks). Responsible: OKKAM

Programme: H2020-EU.2.1.1.4. - Topic(s): ICT-21-2014

download deliverable 

Documents, reports 2019-09-09

D4.2 Full Design Document.

D4.2 Full Design Document. Provides the complete blueprint for development of the application scenario pilots based on the preliminary design documents’s integrated feedback, incorporating game design, instructional design as well as iterations on concepts and functionalities carried out in conjuction with WP1,2,3 and 5.
Delivery date: M14 (tasks 4.2 and 4.3). Responsible: PLAYGEN

Programme: H2020-EU.2.1.1.4. - Topic(s): ICT-21-2014

download deliverable 

Documents, reports 2019-09-09

Management report 3

Final report

Programme: H2020-EU.2.1.1.4. - Topic(s): ICT-21-2014

download deliverable 

Documents, reports 2019-09-09