The page lists 52 deliverables related to the research project "RAGE".
title and desprition | type | last update |
---|---|---|
D6.2 Summary, Analysis, Road-mapping and Production of Training materialsD6.2 Summary, Analysis, Road-mapping and Production of Training materials Programme: H2020-EU.2.1.1.4. - Topic(s): ICT-21-2014 |
Documents, reports | 2019-09-09 |
D5.4 Pilots quality report round 2D5.4 Pilots quality report round 2 Programme: H2020-EU.2.1.1.4. - Topic(s): ICT-21-2014 |
Documents, reports | 2019-09-09 |
D1.2 Asset integration methodologyD1.2 Asset integration methodology Programme: H2020-EU.2.1.1.4. - Topic(s): ICT-21-2014 |
Documents, reports | 2019-09-09 |
D4.1 RAGE Asset ReviewD4.1 RAGE Asset Review. Covering input and feedback on asset description, functionality, technical constraints, reusability and considerations by the game developer partners. Programme: H2020-EU.2.1.1.4. - Topic(s): ICT-21-2014 |
Documents, reports | 2019-09-09 |
D8.4 Second RAGE Evaluation ReportD8.4 Second RAGE Evaluation Report Programme: H2020-EU.2.1.1.4. - Topic(s): ICT-21-2014 |
Documents, reports | 2019-09-09 |
D6.5 SNA and discourse analysisD6.5 SNA-based Community Support and Collaboration Mediation tools available and integrated with Ecosystem Programme: H2020-EU.2.1.1.4. - Topic(s): ICT-21-2014 |
Other | 2019-09-09 |
D9.4 Launch Plan for the RAGE Ecosystem AuthorityD9.4 Launch Plan for the RAGE Ecosystem Authority This report describes the governance and sustainability models, as well as the description of the programme for the formal launching of the organisation tasked with its administration, operation and maintenance of the RAGE virtual centre of excellence infrastructure. Programme: H2020-EU.2.1.1.4. - Topic(s): ICT-21-2014 |
Documents, reports | 2019-09-09 |
D1.3 Two-level authoring widget software and documentationD1.3 Two-level authoring widget software and documentation Programme: H2020-EU.2.1.1.4. - Topic(s): ICT-21-2014 |
Other | 2019-09-09 |
First version exploitation planIntermediate version of deliverable D9.3 Programme: H2020-EU.2.1.1.4. - Topic(s): ICT-21-2014 |
Documents, reports | 2019-09-09 |
D7.4 Potential business models reportD7.4 Report with proposition of potential business models Programme: H2020-EU.2.1.1.4. - Topic(s): ICT-21-2014 |
Documents, reports | 2019-09-09 |
D7.5 Processes in to proposed business models reportD7.5 Report synthesis of processes in to proposed business models for Leisure and Non-Leisure games development industries. Programme: H2020-EU.2.1.1.4. - Topic(s): ICT-21-2014 |
Documents, reports | 2019-09-09 |
Project Quality Assurance HandbookProcedural document Programme: H2020-EU.2.1.1.4. - Topic(s): ICT-21-2014 |
Documents, reports | 2019-09-09 |
Management report 2Reporting periods M18-M6 Programme: H2020-EU.2.1.1.4. - Topic(s): ICT-21-2014 |
Documents, reports | 2019-09-09 |
D7.6 RAGE asset-based business caseD7.6 Develop asset based business case for Leisure games development industries access via web based resource located within the RAGE repository. Programme: H2020-EU.2.1.1.4. - Topic(s): ICT-21-2014 |
Documents, reports | 2019-09-09 |
D3.4 Final social gamification assets.D3.4 Final social gamification assets. Social gamification assets integrated in the repository with docu-mentation and authoring and configuration tools. RAGE ecosystem fully gamified. Programme: H2020-EU.2.1.1.4. - Topic(s): ICT-21-2014 |
Other | 2019-09-09 |
D2.5 First bundle of dashboard componentsD2.5 First bundle of dashboard components: Specification, initial visualizations, design of specific analyses. Programme: H2020-EU.2.1.1.4. - Topic(s): ICT-21-2014 |
Other | 2019-09-09 |
D8.2 Evaluation AssetD8.2 Evaluation Asset – Conceptual Approach and Implementation Programme: H2020-EU.2.1.1.4. - Topic(s): ICT-21-2014 |
Other | 2019-09-09 |
D8.3 First RAGE Evaluation ReportD8.3 First RAGE Evaluation Report Programme: H2020-EU.2.1.1.4. - Topic(s): ICT-21-2014 |
Documents, reports | 2019-09-09 |
D3.2 Final integrated bundle of core social agency assetsD3.2 Final integrated bundle of core social agency assets. Core assets integrated in the repository with documentation and authoring and configuration tools. Programme: H2020-EU.2.1.1.4. - Topic(s): ICT-21-2014 |
Other | 2019-09-09 |
D2.1 First bundle of server-side components: Specification, use cases and prototypes of the core assets.D2.1 First bundle of server-side components: Specification, use cases and prototypes of the core assets. Programme: H2020-EU.2.1.1.4. - Topic(s): ICT-21-2014 |
Other | 2019-09-09 |
D6.3 Semantic Content Annotation SupportD6.3 Semantic Annotation Support of Ecosystem Content available Programme: H2020-EU.2.1.1.4. - Topic(s): ICT-21-2014 |
Other | 2019-09-09 |
First version scenario arrangement document - round 1Inermediate version preceding deliverable D5.1 Programme: H2020-EU.2.1.1.4. - Topic(s): ICT-21-2014 |
Documents, reports | 2019-09-09 |
D9.1 RAGE Dissemination PlanD9.1 RAGE Dissemination Plan. This report will document the plans to disseminate RAGE results, and, in the successive editions, the description of actions already performed and their results. Programme: H2020-EU.2.1.1.4. - Topic(s): ICT-21-2014 |
Documents, reports | 2019-09-09 |
D9.3 Exploitation PlanD9.3 Exploitation Plan. This report will include the design of the legal entity governing the future operation of the RAGE ecosystem. Programme: H2020-EU.2.1.1.4. - Topic(s): ICT-21-2014 |
Documents, reports | 2019-09-09 |
D3.5 First storytelling frameworkD3.5 First storytelling framework. Specification and prototype with a mock-up scenario. Programme: H2020-EU.2.1.1.4. - Topic(s): ICT-21-2014 |
Other | 2019-09-09 |
D4.4 Final version of game applications for scenario pilotD4.4 Final version of game applications for scenario pilots – refinement and delivery support of games and gamifications based on the feedback from 1st round of pilotting and formative evaluation, leading to the 2nd round of pilloting and validation. Programme: H2020-EU.2.1.1.4. - Topic(s): ICT-21-2014 |
Other | 2019-09-09 |
D5.2 Scenario Arrangement document – round 2D5.2 Scenario Arrangement document – round 2 Programme: H2020-EU.2.1.1.4. - Topic(s): ICT-21-2014 |
Documents, reports | 2019-09-09 |
D7.2 Summary report of Value Chain analysisD7.2 Summary report of Value Chain analysis fro the Leisure and Non-Leisure game development Industries Programme: H2020-EU.2.1.1.4. - Topic(s): ICT-21-2014 |
Documents, reports | 2019-09-09 |
D2.6 Final bundle of dashboard componentsDelivery date: M19(task 2.4) , Responsible: UCM Programme: H2020-EU.2.1.1.4. - Topic(s): ICT-21-2014 |
Other | 2019-09-09 |
First version Applied gaming asset methodologyIntermediate version of deliverable D1.1. Programme: H2020-EU.2.1.1.4. - Topic(s): ICT-21-2014 |
Documents, reports | 2019-09-09 |
D6.1 Ecosystem software platformD6.1 Ecosystem software platform with underlying Software Repository, Digital Library and Media Archive available for collection of content Programme: H2020-EU.2.1.1.4. - Topic(s): ICT-21-2014 |
Other | 2019-09-09 |
Preliminary Summary, Analysis, Road-mapping and Production of Training materialsThis deliverable D6.6 was added to allow for releasing an intermediate version of D6.2 Summary, Analysis, Road-mapping and Production of Training materials Programme: H2020-EU.2.1.1.4. - Topic(s): ICT-21-2014 |
Documents, reports | 2019-09-09 |
D6.4 Ecosystem integrationD6.4 Ecosystem Software Repository, Digital Library, Media Archive, Interactive Map and Online Training Portal populated with content and online Programme: H2020-EU.2.1.1.4. - Topic(s): ICT-21-2014 |
Other | 2019-09-09 |
D7.3 Summary report RAGE stakeholder consultation processD7.3 Summary report and synthesis of RAGE Stakeholder consultation process Programme: H2020-EU.2.1.1.4. - Topic(s): ICT-21-2014 |
Documents, reports | 2019-09-09 |
D7.1 Summary report of business modelsDeliverables Programme: H2020-EU.2.1.1.4. - Topic(s): ICT-21-2014 |
Documents, reports | 2019-09-09 |
D1.1 Applied gaming asset methodologyD1.1 Applied gaming asset methodology Programme: H2020-EU.2.1.1.4. - Topic(s): ICT-21-2014 |
Documents, reports | 2019-09-09 |
Research data management planPersonal data management procedures for privacy protection Programme: H2020-EU.2.1.1.4. - Topic(s): ICT-21-2014 |
Documents, reports | 2019-09-09 |
Management Report 1Reporting period M1-M18 Programme: H2020-EU.2.1.1.4. - Topic(s): ICT-21-2014 |
Documents, reports | 2019-09-09 |
D4.3 Initial version of game applications for scenario pilotsD4.3 Initial version of game applications for scenario pilots – development and delivery support of pilot games and gamifications using the reusable assets, ready for first round of pilotting and formative evaluation (for 1st round of pilotting in WP5) (Task 4.2 and 4.3). Programme: H2020-EU.2.1.1.4. - Topic(s): ICT-21-2014 |
Other | 2019-09-09 |
D2.3 First bundle of client-side componentsD2.3 First bundle of client-side components: Specification, sample scenarios and mockup libraries for development for the thee target platforms. Programme: H2020-EU.2.1.1.4. - Topic(s): ICT-21-2014 |
Other | 2019-09-09 |
D9.2 RAGE websiteD9.2 RAGE website. The project website will provide project overviews and highlights; up-to-date infor-mation on intermediate and final project results, including public reports and publications as well as synthesis reports drawn from selected confidential material; project events, including e.g. user group meetings, conferences and workshops; contact details, etc. Programme: H2020-EU.2.1.1.4. - Topic(s): ICT-21-2014 |
Websites, patent fillings, videos etc. | 2019-09-09 |
D8.1 RAGE Evaluation Framework and GuidelinesD8.1 RAGE Evaluation Framework and Guidelines Programme: H2020-EU.2.1.1.4. - Topic(s): ICT-21-2014 |
Documents, reports | 2019-09-09 |
D2.4 Final bundle of client-side componentsD2.4 Final bundle of client-side components: Core assets in final form with documentation and samples. M31 (tasks 2.1, 2.2, 2.3) , Responsible: UCM Programme: H2020-EU.2.1.1.4. - Topic(s): ICT-21-2014 |
Other | 2019-09-09 |
D3.3 First social gamification assetsD3.3 First social gamification assets. Specification, use cases and prototypes of the social gamification assets. Mock-up of the RAGE ecosystem gamification. Programme: H2020-EU.2.1.1.4. - Topic(s): ICT-21-2014 |
Other | 2019-09-09 |
Second version exploitation planIntermediate version of D9.3 Programme: H2020-EU.2.1.1.4. - Topic(s): ICT-21-2014 |
Documents, reports | 2019-09-09 |
D2.2 Final bundle of server-side components: Core assets in final form with documentation and samples.D2.2 Final bundle of server-side components: Core assets in final form with documentation and samples. M30 (tasks 2.1, 2.2, 2.3), Responsible: UCM Programme: H2020-EU.2.1.1.4. - Topic(s): ICT-21-2014 |
Other | 2019-09-09 |
D5.3 Pilots quality report round 1D5.3 Pilots quality report round 1 Programme: H2020-EU.2.1.1.4. - Topic(s): ICT-21-2014 |
Documents, reports | 2019-09-09 |
D3.1 First bundle of core social agency assetsD3.1 First bundle of core social agency assets. Specification, use cases and prototypes of the core assets. Programme: H2020-EU.2.1.1.4. - Topic(s): ICT-21-2014 |
Other | 2019-09-09 |
D3.6 Final storytelling framework.D3.6 Final storytelling framework. Storytelling framework integrated in the repository with documentation, complete authoring tool and sample stories. Programme: H2020-EU.2.1.1.4. - Topic(s): ICT-21-2014 |
Other | 2019-09-09 |
D5.1 Scenario Arrangement document – round 1D5.1 Scenario Arrangement document – round 1 Programme: H2020-EU.2.1.1.4. - Topic(s): ICT-21-2014 |
Documents, reports | 2019-09-09 |
D4.2 Full Design Document.D4.2 Full Design Document. Provides the complete blueprint for development of the application scenario pilots based on the preliminary design documents’s integrated feedback, incorporating game design, instructional design as well as iterations on concepts and functionalities carried out in conjuction with WP1,2,3 and 5. Programme: H2020-EU.2.1.1.4. - Topic(s): ICT-21-2014 |
Documents, reports | 2019-09-09 |
Management report 3Final report Programme: H2020-EU.2.1.1.4. - Topic(s): ICT-21-2014 |
Documents, reports | 2019-09-09 |