The page lists 56 deliverables related to the research project "NOBEL GRID".
title and desprition | type | last update |
---|---|---|
EMA App functionalities specification and designReport of the specifications and design details of the EMA App. Programme: H2020-EU.3.3.4. - Topic(s): LCE-07-2014 |
Documents, reports | 2019-05-31 |
Local deployment of project results in Alginet pilot sitePlan and conclusions of the local deployment. Programme: H2020-EU.3.3.4. - Topic(s): LCE-07-2014 |
Documents, reports | 2019-05-31 |
Lab-testing and evaluation of devices, software and servicesTesting of the Smart Home software prototype and refinement at the second prototype. Programme: H2020-EU.3.3.4. - Topic(s): LCE-07-2014 |
Demonstrators, pilots, prototypes | 2019-05-31 |
Demonstration activities Alginet demo siteDescription of the demonstration activities in the demo site. Programme: H2020-EU.3.3.4. - Topic(s): LCE-07-2014 |
Demonstrators, pilots, prototypes | 2019-05-31 |
Distribution grid and retail market Scenarios and use cases definitionDocument that compiles the definition of all scenarios and use cases coming from NOBEL GRID partners. Programme: H2020-EU.3.3.4. - Topic(s): LCE-07-2014 |
Documents, reports | 2019-05-31 |
Smart meters architecture and data model analysis v2Final version of information and data models and the specification of the system interfaces. Programme: H2020-EU.3.3.4. - Topic(s): LCE-07-2014 |
Documents, reports | 2019-05-31 |
Distribution grid and retail market Requirements definitionDocument that compiles the definition of all requirements coming from NOBEL GRID partners, especially the end users. Programme: H2020-EU.3.3.4. - Topic(s): LCE-07-2014 |
Documents, reports | 2019-05-31 |
Data gathering for evaluation Alginet pilot siteData gathered during the demonstration activities. Programme: H2020-EU.3.3.4. - Topic(s): LCE-07-2014 |
Other | 2019-05-31 |
Local deployment of project results in Terni pilot sitePlan and conclusions of the local deployment. Programme: H2020-EU.3.3.4. - Topic(s): LCE-07-2014 |
Documents, reports | 2019-05-31 |
Real-time Data energy services FrameworkReport of the real-time data services. Programme: H2020-EU.3.3.4. - Topic(s): LCE-07-2014 |
Documents, reports | 2019-05-31 |
Ex-ante analysis Alginet (Spain)Ex-ante analysis result and point of reference of the demo site. Programme: H2020-EU.3.3.4. - Topic(s): LCE-07-2014 |
Documents, reports | 2019-05-31 |
G3M Framework functionalities specification and designReport of the specifications and design details of the G3M Framework. Programme: H2020-EU.3.3.4. - Topic(s): LCE-07-2014 |
Documents, reports | 2019-05-31 |
Holistic Demand Flexibility ModelsReport of the demand flexibility modelling. Programme: H2020-EU.3.3.4. - Topic(s): LCE-07-2014 |
Documents, reports | 2019-05-31 |
Design and development of interfaces for distributed energy generation and storageDesign and development of control interfaces for distributed energy generation and storage Programme: H2020-EU.3.3.4. - Topic(s): LCE-07-2014 |
Documents, reports | 2019-05-31 |
Evaluation and technical validation FrameworkThe report of plan for the evaluation and technical validation of all the project results. Programme: H2020-EU.3.3.4. - Topic(s): LCE-07-2014 |
Documents, reports | 2019-05-31 |
Ex-ante analysis UK pilot siteEx-ante analysis result and point of reference of the demo site. Programme: H2020-EU.3.3.4. - Topic(s): LCE-07-2014 |
Documents, reports | 2019-05-31 |
Energy policies and regulatory framework analysisReport of existing policies and regulation and adaptation proposal for policy makers. Programme: H2020-EU.3.3.4. - Topic(s): LCE-07-2014 |
Documents, reports | 2019-05-31 |
DR services integration and lab-testingIntegration and testing of energy services Programme: H2020-EU.3.3.4. - Topic(s): LCE-07-2014 |
Demonstrators, pilots, prototypes | 2019-05-31 |
Design and Specifications of the DRFMReport of the design of DRFM modules Programme: H2020-EU.3.3.4. - Topic(s): LCE-07-2014 |
Documents, reports | 2019-05-31 |
Ex-ante analysis Terni pilot siteEx-ante analysis result and point of reference of the demo site. Programme: H2020-EU.3.3.4. - Topic(s): LCE-07-2014 |
Documents, reports | 2019-05-31 |
Local deployment of project results in UK pilot sitePlan and conclusions of the local deployment. Programme: H2020-EU.3.3.4. - Topic(s): LCE-07-2014 |
Documents, reports | 2019-05-31 |
Specification of the Unbundled Smart Meter build with commercially existing smart meters and components adapted to the new conceptReport describing the USM concept to cover LCE7-2014-IA-3 and other new functionalities. Programme: H2020-EU.3.3.4. - Topic(s): LCE-07-2014 |
Documents, reports | 2019-05-31 |
Data gathering for evaluation in UK pilot siteData gathered during the demonstration activities. Programme: H2020-EU.3.3.4. - Topic(s): LCE-07-2014 |
Other | 2019-05-31 |
Standardization activitiesReport on the analysis of the existing standards in smart grid and smart metering are and identification of the potential contributions to relevant standardization bodies Programme: H2020-EU.3.3.4. - Topic(s): LCE-07-2014 |
Documents, reports | 2019-05-31 |
Integration testingThis document will include the plan of the testING and the lessons learned. Programme: H2020-EU.3.3.4. - Topic(s): LCE-07-2014 |
Documents, reports | 2019-05-31 |
Demonstration activities UK pilot siteDescription of the demonstration activities in the demo site. Programme: H2020-EU.3.3.4. - Topic(s): LCE-07-2014 |
Demonstrators, pilots, prototypes | 2019-05-31 |
Design and specifications of Stable and secure distribution gridsReport of the design and specifications for innovative distribution grid innovative functionalities. Programme: H2020-EU.3.3.4. - Topic(s): LCE-07-2014 |
Documents, reports | 2019-05-31 |
NOBEL GRID Pilot sites formal analysisDocument that formally analyses the operational constraints at each site with regards to the use cases to be demonstrated. Programme: H2020-EU.3.3.4. - Topic(s): LCE-07-2014 |
Documents, reports | 2019-05-31 |
Design of Smart Home basic infrastructure needed for Smart Grid interaction and corresponding servicesReport with the design of the Smart Home software for the USM. Programme: H2020-EU.3.3.4. - Topic(s): LCE-07-2014 |
Documents, reports | 2019-05-31 |
Demonstration activities in Greek pilot siteDescription of the demonstration activities in the demo site. Programme: H2020-EU.3.3.4. - Topic(s): LCE-07-2014 |
Demonstrators, pilots, prototypes | 2019-05-30 |
Technological impact of NOBEL GRID resultsTechnological impact of the results. Programme: H2020-EU.3.3.4. - Topic(s): LCE-07-2014 |
Documents, reports | 2019-05-30 |
Evaluation and technical validation of the project resultsEvaluation and technical validation analysis report. Programme: H2020-EU.3.3.4. - Topic(s): LCE-07-2014 |
Documents, reports | 2019-05-30 |
Socio-economic impactSocio-economic impact report based on the evaluation results. Programme: H2020-EU.3.3.4. - Topic(s): LCE-07-2014 |
Documents, reports | 2019-05-30 |
Data gathering for evaluation in greek pilot siteData gathered during the demonstration activities. Programme: H2020-EU.3.3.4. - Topic(s): LCE-07-2014 |
Other | 2019-05-30 |
Smart grids reference architecture and data models v2Final version of the NOBEL GRID Reference architecture that facilitates the deployment. Programme: H2020-EU.3.3.4. - Topic(s): LCE-07-2014 |
Documents, reports | 2019-05-30 |
Demonstration activities in Belgian pilot siteDescription of the demonstration activities in the demo site. Programme: H2020-EU.3.3.4. - Topic(s): LCE-07-2014 |
Demonstrators, pilots, prototypes | 2019-05-30 |
Dissemination Master PlanThe dissemination strategy will be focused on establishing channels for disseminating the project results, reaching the target group and applying the developed products. It will determine which target group to address with which material at which time. The Dissemination Plan will provide systematic information on raising awareness of the project\'s activities, goals and results. Programme: H2020-EU.3.3.4. - Topic(s): LCE-07-2014 |
Documents, reports | 2019-05-30 |
Roadmap for replication and up-scalingGuide for efficient NOBEL GRID replication Programme: H2020-EU.3.3.4. - Topic(s): LCE-07-2014 |
Documents, reports | 2019-05-30 |
Demonstration activities in Terni pilot siteDescription of the demonstration activities in the demo site. Programme: H2020-EU.3.3.4. - Topic(s): LCE-07-2014 |
Demonstrators, pilots, prototypes | 2019-05-30 |
Design and development of power interfaces for distributed energy generation andThis document will define the design and specification of the power interfaces that will be needed in order to integrate efficiently the DER and storage systems. Programme: H2020-EU.3.3.4. - Topic(s): LCE-07-2014 |
Documents, reports | 2019-05-30 |
NOBEL GRID e-Learning PlatformAn e-learning platform will be developed and make it publicly available in the to promote education among stakeholders. Mainly industrial and domestic users. Programme: H2020-EU.3.3.4. - Topic(s): LCE-07-2014 |
Websites, patent fillings, videos etc. | 2019-05-30 |
Local deployment of project results Greek pilot sitePlan and conclusions of the local deployment. Programme: H2020-EU.3.3.4. - Topic(s): LCE-07-2014 |
Documents, reports | 2019-05-30 |
Updates for Energy policies and regulatory framework analysisUpdate of the first versión of D2.2 Programme: H2020-EU.3.3.4. - Topic(s): LCE-07-2014 |
Documents, reports | 2019-05-30 |
Workshops Report period 3A report will be generated once a year containing the feedback coming from the advisory board and user group workshops Programme: H2020-EU.3.3.4. - Topic(s): LCE-07-2014 |
Documents, reports | 2019-05-30 |
Workshops Report period 2A report will be generated once a year containing the feedback coming from the advisory board and user group workshops. Programme: H2020-EU.3.3.4. - Topic(s): LCE-07-2014 |
Documents, reports | 2019-05-30 |
Data gathering for evaluation Terni pilot siteData gathered during the demonstration activities. Programme: H2020-EU.3.3.4. - Topic(s): LCE-07-2014 |
Other | 2019-05-30 |
Ex-ante analysis Greek pilot siteEx-ante analysis result and point of reference of the demo site Programme: H2020-EU.3.3.4. - Topic(s): LCE-07-2014 |
Documents, reports | 2019-05-30 |
Integration and Lab-testing Models for distributed generation and storage integration.Report of the integration, lab-testing and refinement of the DER and storage interfaces. Programme: H2020-EU.3.3.4. - Topic(s): LCE-07-2014 |
Demonstrators, pilots, prototypes | 2019-05-30 |
Data gathering for evaluation in Belgian pilot siteData gathered during the demonstration activities Programme: H2020-EU.3.3.4. - Topic(s): LCE-07-2014 |
Other | 2019-05-30 |
Local deployment of project results in Belgian pilot sitePlan and conclusions of the local deployment. Programme: H2020-EU.3.3.4. - Topic(s): LCE-07-2014 |
Documents, reports | 2019-05-30 |
Final NOBEL GRID Business modelsUpdate version of the deliverable 2.3. Programme: H2020-EU.3.3.4. - Topic(s): LCE-07-2014 |
Documents, reports | 2019-05-30 |
Smart meters architecture and data model analysis v1Preliminary version of information and data models and the specification of the system interfaces Programme: H2020-EU.3.3.4. - Topic(s): LCE-07-2014 |
Documents, reports | 2019-05-30 |
Business models and incentive mechanismsReport of innovative business models to maximise the NOBEL GRID impact Programme: H2020-EU.3.3.4. - Topic(s): LCE-07-2014 |
Documents, reports | 2019-05-30 |
Workshops Report period 1A report will be generated once a year containing the feedback coming from the advisory board and user group workshops. Programme: H2020-EU.3.3.4. - Topic(s): LCE-07-2014 |
Documents, reports | 2019-05-30 |
Ex-ante analysis Belgian pilot siteEx-ante analysis result and point of reference of the demo site. Programme: H2020-EU.3.3.4. - Topic(s): LCE-07-2014 |
Documents, reports | 2019-05-30 |
Smart grids reference architecture and data models v1Preliminary version of the NOBEL GRID Reference architecture that facilitates the deployment. Programme: H2020-EU.3.3.4. - Topic(s): LCE-07-2014 |
Documents, reports | 2019-05-30 |