The page lists 17 deliverables related to the research project "STORY".
title and desprition | type | last update |
---|---|---|
Case study report chapter on building integrated storageStudy of 5 buildings equipped with different energy storage equipments. Programme: H2020-EU.3.3. - Topic(s): LCE-08-2014 |
Demonstrators, pilots, prototypes | 2020-04-22 |
Report on Large Scale Impact SimulationsWith the cases and scenarios defined, the simulations can be prepared, simulated and the results evaluated. The focus is on understanding the following issues (both economic and technical) for each of the market-driven, regulated and mixed methods of implementing storage: Programme: H2020-EU.3.3. - Topic(s): LCE-08-2014 |
Other | 2020-04-22 |
Newsletter 6Advances of the project to be disseminated to the other LCE 6-10 projects. Programme: H2020-EU.3.3. - Topic(s): LCE-08-2014 |
Websites, patent fillings, videos etc. | 2020-04-22 |
Newsletter 5Advances of the project to be disseminated to the other LCE 6-10 projects. Programme: H2020-EU.3.3. - Topic(s): LCE-08-2014 |
Websites, patent fillings, videos etc. | 2020-04-22 |
Periodic report 2Periodic report 2: Draft report to the Commission covering period 2 i.e. months 13-24 of the project (M24). Final report to be delivered, to the EC, within 60 days after the end of the reporting period. Programme: H2020-EU.3.3. - Topic(s): LCE-08-2014 |
Documents, reports | 2020-04-22 |
Newsletter 4Advances of the project to be disseminated to the other LCE 6-10 projects. Programme: H2020-EU.3.3. - Topic(s): LCE-08-2014 |
Websites, patent fillings, videos etc. | 2020-04-22 |
Report on interoperability guidelinesGuidelines addressing in-depth interoperability, substantially improving on the state-of-the-art. These guidelines contain solutions on how to design and build interoperable components and subsystems that can be integrated with little effort and time. The guidelines allow the integration of components and subsystems into an overall system while insuring good performances. Programme: H2020-EU.3.3. - Topic(s): LCE-08-2014 |
Documents, reports | 2020-04-22 |
Requirements definition of the hardware to be deployedMarket screening to find the hardware components that best match the project defined criteria. A best fit and best price/quality fit is selected for the building, neighborhood, and district communication in the demonstration sites. Programme: H2020-EU.3.3. - Topic(s): LCE-08-2014 |
Documents, reports | 2020-04-22 |
Newsletter 3Advances of the project to be disseminated to the other LCE 6-10 projects. Programme: H2020-EU.3.3. - Topic(s): LCE-08-2014 |
Websites, patent fillings, videos etc. | 2020-04-22 |
Brochure 2Brochures and flyers related to the project progress to be distributed to the stakeholders. Programme: H2020-EU.3.3. - Topic(s): LCE-08-2014 |
Websites, patent fillings, videos etc. | 2020-04-22 |
Periodic Report 1Periodic report 1: Draft Report to the Commission covering period 1 i.e. months 1-12 of the project (M12). Final report to be delivered, to the EC, within 60 days after the end of the reporting period. Programme: H2020-EU.3.3. - Topic(s): LCE-08-2014 |
Documents, reports | 2020-04-22 |
Newsletter 2Advances of the project to be disseminated to the other LCE 6-10 projects. Programme: H2020-EU.3.3. - Topic(s): LCE-08-2014 |
Websites, patent fillings, videos etc. | 2020-04-22 |
Newsletter 1Advances of the project to be disseminated to the other LCE 6-10 projects. Programme: H2020-EU.3.3. - Topic(s): LCE-08-2014 |
Websites, patent fillings, videos etc. | 2020-04-22 |
Demonstrated embedment in 3 different controllable devices able to support flexibility of the energy demandDifferent approaches for adding multiple services on a single ICT structure are compared using the inputs form the analyses on interoperability and gateway requirements. Programme: H2020-EU.3.3. - Topic(s): LCE-08-2014 |
Demonstrators, pilots, prototypes | 2020-04-22 |
Structured overview of communication standards for smart gridsOverview of the current and emerging standards for smart grids. Programme: H2020-EU.3.3. - Topic(s): LCE-08-2014 |
Documents, reports | 2020-04-22 |
Overview of requirement for embedding measurements for services on ICTOverview of the typical requirements that measurement and data logging equipment poses on the ICT infrastructure. Programme: H2020-EU.3.3. - Topic(s): LCE-08-2014 |
Documents, reports | 2020-04-22 |
Brochure 1Brochures and flyers related to the project progress to be distributed to the stakeholders. Programme: H2020-EU.3.3. - Topic(s): LCE-08-2014 |
Websites, patent fillings, videos etc. | 2020-04-22 |