Opendata, web and dolomites

HDGAS project deliverables

The page lists 10 deliverables related to the research project "HDGAS".

 List of Deliverables

HDGAS: list of downloadable deliverables.
title and desprition type last update

Assessment results of independent testing

Report of the results from the independent testing. This report will point out if the results are in line and fulfilling the targets from the EC in terms of CO2 savings.

Programme: H2020-EU.3.4. - Topic(s): GV-7-2014

download deliverable 

Documents, reports 2019-05-31

Fueling process simulation models finalized and validated

- Physical model for simulation process documentation
- Validation by comparison with real system test data

Programme: H2020-EU.3.4. - Topic(s): GV-7-2014

download deliverable 

Documents, reports 2019-05-31

Dissemination plan, (final version)

The Dissemination Plan will be prepared in order to maximise the potential impact of the project results. In there specific target groups and related specific dissemination activities will be presented.

Programme: H2020-EU.3.4. - Topic(s): GV-7-2014

download deliverable 

Documents, reports 2019-05-31

Newsletters

Newsletters will be created as HTML e-mail newsletters with links to the HD-GAS website for more detailed information. At least 3 will be created (M10, M22, M36), most likely the frequency will be higher. At the end a short report will be created with the a copy of all newsletters

Programme: H2020-EU.3.4. - Topic(s): GV-7-2014

download deliverable 

Documents, reports 2019-05-31

Standards for mechanical fueling interface and fueling process

• Proposal for standard for a mechanical fueling interface for LNG heavy duty vehicles
• Proposal for a standard process for refueling heavy duty vehicles with LNG

Programme: H2020-EU.3.4. - Topic(s): GV-7-2014

download deliverable 

Documents, reports 2019-05-31

Exploitation Plan, (final version)

The draft Exploitation Plan will be updated according to the market developments and identification of potential users of the results.

Programme: H2020-EU.3.4. - Topic(s): GV-7-2014

download deliverable 

Documents, reports 2019-05-31

Dissemination plan (initial version)

A dissemination and communication plan will be prepared in order to maximise the potential impact of the project. The plan structure will be such that the activities relevant for a particular target group are clearly identifiable. The plan will follow the EU Commission Guidelines for Communicating EU Research. A first draft available in M9.

Programme: H2020-EU.3.4. - Topic(s): GV-7-2014

download deliverable 

Documents, reports 2019-05-31

Project website, including Project templates

The website will be designed, and a graphical project identity will be composed of visual elements that aim to represent the project. The graphical identity will include logo, fonts, colours and templates for presentations and text documents. effort for the members of the consortium.
Templates includes reports, presentations, logo), database for Dissemination (stakeholders, interest groups, contact details

A short report will describe the website content and the templates.

Programme: H2020-EU.3.4. - Topic(s): GV-7-2014

download deliverable 

Documents, reports 2019-05-31

Exploitation Plan, (initial version)

This document will report on the draft Exploitation Plan. The plan will include the following elements:
- Main objectives and Responsibilities
- Target groups and Key actors
- Levels of exploitation and Exploitable components
- Communication channels and tools

The initial version will be a living document and continuously updated. Further, the exploitation strategy will be subject at each general assembly.

Programme: H2020-EU.3.4. - Topic(s): GV-7-2014

download deliverable 

Documents, reports 2019-05-31

Flyer

Flyer with general project information for dissemination in first phase of the project to be released.

A short report will describe the Flyer and describe the targte audiance and use of the flyer.

Programme: H2020-EU.3.4. - Topic(s): GV-7-2014

download deliverable 

Documents, reports 2019-05-31