Explore the words cloud of the IPBMNES project. It provides you a very rough idea of what is the project "IPBMNES" about.
The following table provides information about the project.
Coordinator |
TECHNISCHE UNIVERSITAET DRESDEN
Organization address contact info |
Coordinator Country | Germany [DE] |
Project website | http://www.martin-treiber.de/EU-project-IPBMNES |
Total cost | 171˙460 € |
EC max contribution | 171˙460 € (100%) |
Programme |
1. H2020-EU.1.3.2. (Nurturing excellence by means of cross-border and cross-sector mobility) |
Code Call | H2020-MSCA-IF-2014 |
Funding Scheme | MSCA-IF-EF-ST |
Starting year | 2017 |
Duration (year-month-day) | from 2017-01-01 to 2018-12-31 |
Take a look of project's partnership.
# | ||||
---|---|---|---|---|
1 | TECHNISCHE UNIVERSITAET DRESDEN | DE (DRESDEN) | coordinator | 171˙460.00 |
In order to understand the nature of complex and collective dynamics of pedestrians during normal and evacuation situations, mathematical models and simulation tools are essential. Compared to vehicular flows, pedestrian movements show a more complex behavior, mainly because they are essentially two-dimensional and not limited to specific lanes. Moreover, in pedestrian dynamics, collective dynamics will be formed from individual human nonlinear interactions. Specifically, pedestrian behavior is the result of a series of interdependent decisions which are based on a specific plan. The plan is a latent (unobserved) variable resulting in a series of (observed) actions. However, in state-of-the-art pedestrian flow models, the latent plans and some observed actions are ignored. When it is implemented in simulation software, this leads to an unrealistic representation of individual pedestrian movements and collective crowd dynamics. In order to overcome this issue, a framework for integrated pedestrian behavior modeling based on the concepts of a short-term plan and action, is proposed. This framework integrates the following sub-models: Target Destination Choice Model, Pedestrian Route Choice Model, Pedestrian Pace State Model, and a Pedestrian Movement Model. It captures pedestrians' planning capabilities and interdependent decisions. The parameters of all the components of the framework are estimated jointly by observed pedestrian trajectories using maximum-likelihood theory. Finally, the above behavioral models will be incorporated in the traffic simulator, MovSim (Multi-model open-source vehicular-traffic Simulator developed by Technical University Dresden -TUD) to simulate the normal and evacuation pedestrian environment. This tool will be useful to develop guidelines for local authorities and organizers of mass events in larger cities of Europe and for designing the pedestrian facilities.
Are you the coordinator (or a participant) of this project? Plaese send me more information about the "IPBMNES" project.
For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.
Send me an email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.
Thanks. And then put a link of this page into your project's website.
The information about "IPBMNES" are provided by the European Opendata Portal: CORDIS opendata.