The page lists 24 deliverables related to the research project "MANGO".
title and desprition | type | last update |
---|---|---|
Report on MANGO Software SupportThis deliverable will report the specifications of the Software stack and the protocol specifications for the MANGO architecture. Will include the activities from Tasks 1.5 and 1.6. Programme: H2020-EU.1.2.2. - Topic(s): FETHPC-1-2014 |
Documents, reports | 2019-11-19 |
Project Dissemination and Communication planThis deliverable will include the plan regarding dissemination activities to be executed during the whole execution of the project, as conference participation, workshops planning, meetings with the Industrial Advisory Panel, coordination with other projects or forums, etc... Programme: H2020-EU.1.2.2. - Topic(s): FETHPC-1-2014 |
Documents, reports | 2019-11-19 |
Phase 1 PlatformIn this deliverable we will provide the phase 1 platform consisting of the emulation boards for rapid architectural exploration within WPs 2 and 3. Details of the full hw configuration will be provided. Programme: H2020-EU.1.2.2. - Topic(s): FETHPC-1-2014 |
Demonstrators, pilots, prototypes | 2019-11-19 |
Board and Rack ArchitecturesThe report on Board Architectures will provide a detailed specification of the board (dedicated motherboard) including mechanical and electrical concept, selected key components, power and heat management concept, interface definitions, host software aspects as well as test and acceptance criteria. The report on Rack Architectures will provide a detailed specification of the power distribution within the rack. The specification will describe the power conversion stage from AC to 12V DC, including the battery part for power protection. It will also provide the electrical and mechanical characteristics of power connection devices and DC bus bars, and describe the heat management concept. Programme: H2020-EU.1.2.2. - Topic(s): FETHPC-1-2014 |
Documents, reports | 2019-11-19 |
Periodic dissemination report - 1These twp deliverables will include all the dissemination actions that have taken place during three different periods of time: for each reporting period of the project. These deliverables will be submitted to the commission after the meetings with the Advisory Panel and will collect its feedback. Programme: H2020-EU.1.2.2. - Topic(s): FETHPC-1-2014 |
Documents, reports | 2019-11-19 |
Report on WP2 progressThis deliverable will report on working progress of WP2, in order to allow its proper monitoring at the review meeting in M18. Programme: H2020-EU.1.2.2. - Topic(s): FETHPC-1-2014 |
Documents, reports | 2019-11-19 |
Report on the MANGO Architecture SpecificationsA report will be delivered showing the specifications of the whole MANGO architecture, taking into account the initial applications requirements analysed in Task 1.1. This report will include the activities from Tasks 1.2, 1.3, and 1.4. Selected design flow tools will be also reported. Programme: H2020-EU.1.2.2. - Topic(s): FETHPC-1-2014 |
Documents, reports | 2019-11-19 |
Progress Management Report - 1These deliverables deal with the analysis of the activity of the consortium. As such it will evaluate pros and cons not only in terms of technical outcomes, but also in terms of organization, milestones, and end up with alternatives for steering next period directions. Programme: H2020-EU.1.2.2. - Topic(s): FETHPC-1-2014 |
Documents, reports | 2019-11-19 |
Report on Application RequirementsA report will be delivered showing the requirements from the target applications coming from Task 1.1. The report will include application scenarios from other domains related to HPC. Programme: H2020-EU.1.2.2. - Topic(s): FETHPC-1-2014 |
Documents, reports | 2019-11-19 |
Reporting of WP5 progressThis deliverable will report on working progress of WP5, in order to allow its proper monitoring at the review meeting in M18. Programme: H2020-EU.1.2.2. - Topic(s): FETHPC-1-2014 |
Documents, reports | 2019-11-19 |
Project WebsiteThis deliverable will be design and implementation of a website as a major dissemination vehicle for the project, technology and product announcements. Programme: H2020-EU.1.2.2. - Topic(s): FETHPC-1-2014 |
Documents, reports | 2019-11-19 |
Transcoding ApplicationsA report on transcoding applications adapted to the real-time HPC MANGO system will be provided. Will detail all the transformations and adaptations required for the efficient use of the system for the application. Programme: H2020-EU.1.2.2. - Topic(s): FETHPC-1-2014 |
Documents, reports | 2019-11-19 |
Progress Management Report - 2These deliverables deal with the analysis of the activity of the consortium. As such it will evaluate pros and cons not only in terms of technical outcomes, but also in terms of organization, milestones, and end up with alternatives for steering next period directions. Programme: H2020-EU.1.2.2. - Topic(s): FETHPC-1-2014 |
Documents, reports | 2019-11-19 |
Final Project ValidationIn this deliverable a final report will be provided describing the final project validation, where all the applications will be run in the targeted real-time HPC system worked in the project. Programme: H2020-EU.1.2.2. - Topic(s): FETHPC-1-2014 |
Demonstrators, pilots, prototypes | 2019-11-19 |
Programming Models and CompilersThis deliverable will produce a periodic report on the activities related to programming models (Task 2.1) and compiler support (Task 2.2). Programme: H2020-EU.1.2.2. - Topic(s): FETHPC-1-2014 |
Documents, reports | 2019-11-19 |
Tile ArchitecturesIn this deliverable we will report the work performed in Task 3.1 where tile architectures will be deeply deployed, researched and analysed. The deliverable will consist on an exhaustive report on the different analysed tile organizations and a classification of the best configurations for the targeted applications and use cases of the project. Programme: H2020-EU.1.2.2. - Topic(s): FETHPC-1-2014 |
Documents, reports | 2019-11-19 |
OS, Hypervisor Adaptation, and HPC MonitoringThis deliverable will produce a report that will describe the hierarchical control (including OS and hypervisor levels) developed to manage both the microfluidic cooling and energy recovery infrastructure in addition to the computing requirements. This report will also present the details of the SW architecture to fuel the user interface as well as the displays to be used in the platform. Programme: H2020-EU.1.2.2. - Topic(s): FETHPC-1-2014 |
Documents, reports | 2019-11-19 |
Final high-level workshopThis deliverable will give final presentation about project results and will conduct with new contacts and plans for further project collaborations. Programme: H2020-EU.1.2.2. - Topic(s): FETHPC-1-2014 |
Documents, reports | 2019-11-19 |
Periodic dissemination report - 2These two deliverables will include all the dissemination actions that have taken place during three different periods of time: for each reporting period of the project. These deliverables will be submitted to the commission after the meetings with the Advisory Panel and will collect its feedback. Programme: H2020-EU.1.2.2. - Topic(s): FETHPC-1-2014 |
Documents, reports | 2019-11-19 |
Manycore ArchitecturesIn this deliverable we will report on the manycore architectures researched in Task 3.2. A complete taxonomy and classification of architectures will be provided, highlighting the best configurations for the targeted applications and use cases of the project. Programme: H2020-EU.1.2.2. - Topic(s): FETHPC-1-2014 |
Documents, reports | 2019-11-19 |
Final Implemented Real-Time HPC Software SupportIn this deliverable we will report on the integrated software stack running on the MANGO platform. The deliverable will include an assessment of the performance of each component as well as of the entire stack. Programme: H2020-EU.1.2.2. - Topic(s): FETHPC-1-2014 |
Documents, reports | 2019-11-19 |
Final (phase 3) PlatformIn this deliverable we will provide the final platform developed according specification of WP1 and developments of WPs 2 and 3. The report will describe the advance of the platform through the three phases of building and manufacturing. We will also report the adaptation and fine tuning of the tile and manycore architectures when mapped on the final platform delivered in the project. Programme: H2020-EU.1.2.2. - Topic(s): FETHPC-1-2014 |
Demonstrators, pilots, prototypes | 2019-11-19 |
Runtime Management SupportA report will be produced with the activities developed towards developing the Runtime Resource Manager for MANGO, located in Task 2.3. In particular this deliverable will produce a report detailing the implementation of the power- and thermal-aware strategies to control in a centralized manner the MANGO chip, board and rack. The main focus will be on the stability on the control and pro-active structure to advance possible thermal runaway situations that can degrade dramatically the performance of the overall MANGO HPC system. Programme: H2020-EU.1.2.2. - Topic(s): FETHPC-1-2014 |
Documents, reports | 2019-11-19 |
Phase 2 PlatformIn this deliverable we will provide the phase 2 platform consisting on the new specific motherboards that will host the HN nodes. A detailed report showing the hw configuration will be provided. We will also provide servers and new power distribution system inside racks, interconnecting motherboards to the power source. A detailed report on the rack architecture will be provided. Programme: H2020-EU.1.2.2. - Topic(s): FETHPC-1-2014 |
Demonstrators, pilots, prototypes | 2019-11-19 |