Opendata, web and dolomites

ADMONT project deliverables

The page lists 11 deliverables related to the research project "ADMONT".

 List of Deliverables

ADMONT: list of downloadable deliverables.
title and desprition type last update

Update of Line capability report including

D1.3 Update of Line capability report including, R, PU, M36, X-FAB
As an outcome from D1.2 an update regarding the line capability of all individual line members will be delivered.

Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-02-2014

download deliverable 

Documents, reports 2019-02-26

Final business plan and exploitation report

D8.4: Final business plan and exploitation report, R,PU, M36, OKM
This final report will sum up the achieved exploitation in the project runtime, further business opportunities as well and provide an outlook of the post project phase.

Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-02-2014

download deliverable 

Websites, patent fillings, videos etc. 2019-02-26

Risk Assessment Plan

The Risk Assessment Plan will include a Critical Path Analysis (CPA) of the main project activities, identifying risk points, and procedures to deal with them.

Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-02-2014

download deliverable 

Documents, reports 2019-05-30

Draft of Line capability report including key performance indicators

D1.2 : Draft of Line capability report including key performance indicators, R, PU, M24, X-FAB
As an outcome from Tasks 1.2 a line capability report will be provided by all individual line members including key performance indicators (outcome from Task 1.1) for major capabilities.

Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-02-2014

download deliverable 

Documents, reports 2019-05-30

System Specification and system related pilot line requirements

D7.1 System Specification and system related pilot line requirements (R, PU, M12, SMT DD)
This deliverable will present the market study regarding RFID sensor systems and the requirement specification for the RFID Sensor Chip.

Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-02-2014

download deliverable 

Documents, reports 2019-05-30

Public IT component and architecture specification

D6.2: Public IT component and architecture specification, R, PU, M20, SYS
The specification takes the results of deliverable 6.1. and defines a detailed specification for improvements and system capabilities necessary for the virtual pilot line

Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-02-2014

download deliverable 

Documents, reports 2019-05-30

Internal and external IT communication

D9.1: Internal and external IT communication infrastructure and project website DEC, PU, M03, TEC
The external IT communication infrastructure constitutes a guideline for communication of the ADMONT project to external target groups including conferences, marketing measures and communication channels. Furthermore this deliverable constitutes the launch of the internal ADMONT communication infrastructure including the establishment of mailing lists or a subversion server, and the ADMONT website. This deliverable is marked with nature “DEC” and will be accompanied by a small written report outlining its structure and purpose in order to justify the achievement of this deliverable.

Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-02-2014

download deliverable 

Demonstrators, pilots, prototypes 2019-05-30

Initial report and updates on dissemination, exploitation and standardisation activities

D8.2: Initial report and updates on dissemination, exploitation and standardisation activities, R, PU, M10, X-FAB
This will include a record of activities related to dissemination and exploitation that have been undertaken and those still planned as well as a report of completed and planned communication activities.

Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-02-2014

download deliverable 

Documents, reports 2019-05-30

Intermediate business plan and exploitation report

D8.3: Intermediate business plan and exploitation report, R,PU, M22, OKM
The initial business plan provided in the proposal of ADMONT will be updated with new findings on the developed technology and its exploitation throughout the project.

Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-02-2014

download deliverable 

Documents, reports 2019-05-30

Data Management Plan (DMP)

D8.1: Data Management Plan (DMP), R, PU, M06, X-FAB
As ADMONT is taking part in the Pilot on Open Research Data a first version of the DMP as an early deliverable will be provided within the first six months of the project. The purpose of the DMP is to provide an analysis of the main elements of the data management policy that will be used by the applications with regard to all the datasets that will be generated by the project. The DMP is not a fixed document, but evolves during the lifespan of the project. More developed versions of the plan can therefore be included as additional deliverables at later stages. According to the Guidelines on Data Management in Horizon 2020, the DMP should address data set reference and name, data set description, standards and metadata, data sharing and archiving and preservation (including storage and backup) on a dataset by dataset basis and should reflect the current status of reflection within the consortium about the data that will be produced:

Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-02-2014

download deliverable 

Documents, reports 2019-05-30

Business Process Model (BPM) and Specification Sheet

D1.1 : Business Process Model (BPM) and Specification Sheet, R, PU, M06, X-FAB
The business process model (BPM) of the ADMONT pilot line will be delivered complemented by specification sheets for processes and interfaces (“ADMONT line hand book”).

Programme: H2020-EU.2.1.1.7. - Topic(s): ECSEL-02-2014

download deliverable 

Documents, reports 2019-05-30