Opendata, web and dolomites

FlexHyJoin project deliverables

The page lists 7 deliverables related to the research project "FlexHyJoin".

 List of Deliverables

FlexHyJoin: list of downloadable deliverables.
title and desprition type last update

Final validation of the FlexHyJoin approach

Final validation of the FlexHyJoin approach

Programme: H2020-EU.2.1.5.1. - Topic(s): FoF-12-2015

download deliverable 

Documents, reports 2019-04-15

Final validation of the prototype production cell

Report on process breakthroughs, comparison with current bonding technologies and level of improvements in terms of cost effectiveness.

Programme: H2020-EU.2.1.5.1. - Topic(s): FoF-12-2015

download deliverable 

Documents, reports 2019-04-15

Demonstrator part – Manufacturing of demonstrator parts, description of process achievements and limits

Demonstrator part – Manufacturing of demonstrator parts, description of process achievements and limits

Programme: H2020-EU.2.1.5.1. - Topic(s): FoF-12-2015

download deliverable 

Demonstrators, pilots, prototypes 2019-04-15

Final validation of the demonstrator part

Report on the performance and cost effectiveness of the demonstrator part compared to conventional components.

Programme: H2020-EU.2.1.5.1. - Topic(s): FoF-12-2015

download deliverable 

Documents, reports 2019-04-15

FlexHyJoin Project Website

Development of a project website with a public zone presenting project activities, results and benefits and a private zone to share information between partners.

Programme: H2020-EU.2.1.5.1. - Topic(s): FoF-12-2015

download deliverable 

Websites, patent fillings, videos etc. 2019-05-30

Dissemination materials

Dissemination materials

Programme: H2020-EU.2.1.5.1. - Topic(s): FoF-12-2015

download deliverable 

Websites, patent fillings, videos etc. 2019-05-30

Periodic newsletters, posters, and videos

Periodic newsletters, posters, and videos

Programme: H2020-EU.2.1.5.1. - Topic(s): FoF-12-2015

download deliverable 

Websites, patent fillings, videos etc. 2019-05-30