Explore the words cloud of the TRIANGLE project. It provides you a very rough idea of what is the project "TRIANGLE" about.
The following table provides information about the project.
Coordinator |
KEYSIGHT TECHNOLOGIES BELGIUM
Organization address contact info |
Coordinator Country | Belgium [BE] |
Project website | http://www.triangle-project.eu/ |
Total cost | 3˙541˙981 € |
EC max contribution | 2˙903˙690 € (82%) |
Programme |
1. H2020-EU.2.1.1. (INDUSTRIAL LEADERSHIP - Leadership in enabling and industrial technologies - Information and Communication Technologies (ICT)) |
Code Call | H2020-ICT-2015 |
Funding Scheme | IA |
Starting year | 2016 |
Duration (year-month-day) | from 2016-01-01 to 2018-12-31 |
Take a look of project's partnership.
# | ||||
---|---|---|---|---|
1 | KEYSIGHT TECHNOLOGIES BELGIUM | BE (ROTSELAAR) | coordinator | 87˙500.00 |
2 | UNIVERSITY COLLEGE LONDON | UK (LONDON) | participant | 828˙250.00 |
3 | UNIVERSIDAD DE MALAGA | ES (MALAGA) | participant | 586˙093.00 |
4 | KEYSIGHT TECHNOLOGIES DENMARK APS | DK (AALBORG OST) | participant | 564˙375.00 |
5 | DEKRA TESTING AND CERTIFICATION SAU | ES (MALAGA) | participant | 388˙500.00 |
6 | REDZINC SERVICES LIMITED | IE (DUBLIN) | participant | 263˙690.00 |
7 | QUAMOTION | BE (SINT-JANS-MOLENBEEK) | participant | 185˙281.00 |
The focus of TRIANGLE is the development of a framework that facilitates the evaluation of the QoE of new mobile applications, services and devices designed to operate in the future 5G mobile broadband networks. The framework will exploit existing FIRE facilities adding new facilities when necessary. The project will identify reference deployment scenarios, will define new KPIs (Key Performance Indicators) and QoE metrics, will develop new testing methodologies and tools, and will design a complete evaluation scheme. The project will focus on the development of a framework to ensure user QoE in the new challenging situations, especially those due to heterogeneous networks and considering the role software will have in the new 5G ecosystem The framework as value added will also provide the means to allow certification and quality mark for the applications, services and devices compliant to the requirements and test specifications developed in the project but also extensible to other FIRE test solutions. This will allow vendor differentiation, specially startups and SMEs, in the current globalized and competitive markets and further visibility of FIRE facilities. The framework, methods and tools developed during the project will focus on providing the mechanisms to incorporate new wireless technologies and topologies envisaged in 5G and contribute to the new ecosystem.
Results of Third Open Call | Documents, reports | 2019-10-29 12:12:17 |
Implementation report on the testing framework Rel 2 and specification of Rel 3 | Documents, reports | 2019-10-29 12:12:18 |
Project metrics and collection of Triangle Technical Publications | Documents, reports | 2019-10-29 12:12:18 |
Report on the QoS management at the application level | Documents, reports | 2019-10-29 12:12:18 |
Recommended TRIANGLE marks for certification of service | Documents, reports | 2019-10-29 12:12:18 |
Final test scenario and test specifications | Documents, reports | 2019-10-29 12:12:19 |
TRIANGLE testbed calibration and baseline | Documents, reports | 2019-10-29 12:12:17 |
TRIANGLE experiments and extensions | Documents, reports | 2019-10-29 12:12:18 |
Results of Second Open Call | Documents, reports | 2019-10-29 12:12:19 |
Implementation report on the testing framework of Rel 4 | Documents, reports | 2019-10-29 12:12:18 |
Year 3 Periodic Report and Final Report Public Summary | Documents, reports | 2019-10-29 12:12:18 |
Triangle QoE approach | Documents, reports | 2019-10-29 12:12:17 |
Report on the networking capabilities provided by the testbed | Documents, reports | 2019-10-29 12:12:17 |
Report on 5G evolution Y2 | Documents, reports | 2019-10-29 12:12:16 |
Report on the distributed deployment of the testbed | Documents, reports | 2019-10-29 12:12:16 |
Implementation report on the testing framework Rel 3 and specification of Rel 4 | Documents, reports | 2019-10-29 12:12:16 |
D6.3 Project Promotional Materials | Other | 2019-10-29 12:12:16 |
Year 1 Periodic Report Public Summary | Documents, reports | 2019-10-29 12:12:17 |
Business Plan for BaaS | Documents, reports | 2019-10-29 12:12:16 |
Triangle portal | Websites, patent fillings, videos etc. | 2019-10-29 12:12:16 |
Formalization of the certification process, requirements and use | Documents, reports | 2019-10-29 12:12:17 |
Report on 5G evolution | Documents, reports | 2019-10-29 12:12:16 |
Report on 5G evolution Y3 | Documents, reports | 2019-10-29 12:12:16 |
Initial report on the testing scenarios, requirements and use cases | Documents, reports | 2019-10-29 12:12:16 |
Results of Known experiments and First Open Call | Documents, reports | 2019-10-29 12:12:16 |
Report on App lab Integration with FIRE testbed | Documents, reports | 2019-10-29 12:12:16 |
Progress report on the testing framework Rel 1 | Documents, reports | 2019-10-29 12:12:17 |
Open Call text and submission template | Documents, reports | 2019-10-29 12:12:16 |
Year 2 Periodic Report Public Summary | Documents, reports | 2019-10-29 12:12:16 |
Take a look to the deliverables list in detail: detailed list of TRIANGLE deliverables.
year | authors and title | journal | last update |
---|---|---|---|
2016 |
Triangle Consortium Benchmarking as a service published pages: , ISSN: , DOI: |
2019-10-29 | |
2016 |
Ana-Rosario Espada
Maria-del-Mar Gallardo
Alberto Salmerón
Pedro A formal approach to automatic analysis of extra-functional properties in mobile apps published pages: , ISSN: , DOI: |
XXIV Jornadas de Concurrencia y Sistemas Distribuidos (JCSD) 15-17 June 2016 | 2019-10-29 |
2016 |
Andrea F. Cattoni, German Corrales Madue�o, Michael Dieudonne, Pedro Merino, Almudena Diaz Zayas, Alberto Salmeron, Frederik Carlier, Bart Saint Germain, Donal Morris, Ricardo Figueiredo, Jeanne Caffrey, Janie Ba�os, Carlos Cardenas, Niall Roche, Alastair Moore An End-to-End Testing Ecosystem for 5G the TRIANGLE Testing House Test Bed published pages: 285-316, ISSN: 1904-4720, DOI: 10.13052/jge1904-4720.633 |
Journal of Green Engineering 6/3 | 2019-10-29 |
2018 |
Almudena DÃaz Zayas, Laura Panizo, Janie Baños, Carlos Cárdenas, Michael Dieudonne QoE Evaluation: The TRIANGLE Testbed Approach published pages: 1-12, ISSN: 1530-8669, DOI: 10.1155/2018/6202854 |
Wireless Communications and Mobile Computing 2018 | 2019-10-29 |
Are you the coordinator (or a participant) of this project? Plaese send me more information about the "TRIANGLE" project.
For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.
Send me an email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.
Thanks. And then put a link of this page into your project's website.
The information about "TRIANGLE" are provided by the European Opendata Portal: CORDIS opendata.