The page lists 12 deliverables related to the research project "MOS-QUITO".
title and desprition | type | last update |
---|---|---|
D4.3 Report on all- electrical two- axis coherent control of a NW-FET spin qubitD4.3 @ M24 (R): Report on all-electrical two-axis coherent control of a NW-FET spin qubit
 Programme: H2020-EU.2.1.1. - Topic(s): ICT-25-2015 |
Documents, reports | 2020-02-27 |
D5.3 Design of a fault tolerant logic qubitD5.3 @M36 (R): Design of a fault tolerant logic qubit Programme: H2020-EU.2.1.1. - Topic(s): ICT-25-2015 |
Documents, reports | 2020-02-27 |
D3.2 Report on first realization of single qubitsReport on first realization of single qubits: QD single spin (CEA, UCPH), QD singlet-triplet (HIT, UCPH), QD hybrid (CNR), donor single spin (UCL) and donor-QD singlet- triplet (UCL, HIT) qubits Programme: H2020-EU.2.1.1. - Topic(s): ICT-25-2015 |
Documents, reports | 2020-02-27 |
D7.3 Dissemination and exploitation reportDissemination and exploitation report Programme: H2020-EU.2.1.1. - Topic(s): ICT-25-2015 |
Documents, reports | 2020-02-27 |
D4.4 Report on coherent control of NW- FET spin qubits using globally- applied μ-wave field combined with local addressing via electric fieldsReport on coherent control of NW-FET spin qubits using globally-applied μ- wave field combined with local addressing via electric fields. Programme: H2020-EU.2.1.1. - Topic(s): ICT-25-2015 |
Documents, reports | 2020-02-27 |
D1.7 Final reportFinal report Programme: H2020-EU.2.1.1. - Topic(s): ICT-25-2015 |
Documents, reports | 2020-01-14 |
D7.2 Dissemination and exploitation reportDissemination and exploitation report Programme: H2020-EU.2.1.1. - Topic(s): ICT-25-2015 |
Documents, reports | 2019-05-31 |
D7.1 Dissemination and exploitation reportDissemination and exploitation report Programme: H2020-EU.2.1.1. - Topic(s): ICT-25-2015 |
Documents, reports | 2019-05-31 |
D1.3 Data management planData management plan Programme: H2020-EU.2.1.1. - Topic(s): ICT-25-2015 |
Other | 2019-05-31 |
D3.1 Report on tunability of split-gate devices into qubit operationReport on tunability of split-gate devices into qubit operation (CEA, UCL, UCPH,HIT, CNR, VTT) Programme: H2020-EU.2.1.1. - Topic(s): ICT-25-2015 |
Documents, reports | 2019-05-31 |
D1.1 Setting up a websiteSetting up a website Programme: H2020-EU.2.1.1. - Topic(s): ICT-25-2015 |
Documents, reports | 2019-05-31 |
D1.2 Kick-off meetingKick-off meeting Programme: H2020-EU.2.1.1. - Topic(s): ICT-25-2015 |
Documents, reports | 2019-05-31 |